Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20214P582 + (06:10:31, 4 December 2024)
- ML20214P577 + (06:10:32, 4 December 2024)
- ML20214P580 + (06:10:32, 4 December 2024)
- ML20214P575 + (06:10:33, 4 December 2024)
- ML20214P574 + (06:10:34, 4 December 2024)
- ML20214P573 + (06:10:35, 4 December 2024)
- RBG-24817, Special Rept:On 861017,valid Failure Occurred on Div II Diesel Generator While Performing Surveillance Testing. Caused by Water in Governor Cooler Return Line.Governor Drained,Flushed & Refilled + (06:10:38, 4 December 2024)
- ML20214P569 + (06:10:39, 4 December 2024)
- ML20214P571 + (06:10:39, 4 December 2024)
- ML20214P568 + (06:10:40, 4 December 2024)
- ML20214P567 + (06:10:41, 4 December 2024)
- ML20214P564 + (06:10:42, 4 December 2024)
- ML20214P562 + (06:10:42, 4 December 2024)
- ML20214P560 + (06:10:43, 4 December 2024)
- 05000296/LER-1986-011-03, :on 861023,plant Electrician Discovered LPCI Motor Generator (MG) 3DA Uncoupled.Caused by Inadequate Procedural Detail & Acceptance Criteria in Plant Maint Instructions.Lpci MG Set Recoupled + (06:10:45, 4 December 2024)
- ST-HL-AE-2201, Second Interim Deficiency Rept Re Failure of Reactor Vessel Temporary Full Flow Filters.Initially Reported on 870406. Detailed Insp of Reactor Coolant & Interfacing Sys for Failed Screen Matl in Progress.Next Rept Provided by 870612 + (06:10:45, 4 December 2024)
- ML20214P556 + (06:10:47, 4 December 2024)
- ML20214P551 + (06:10:47, 4 December 2024)
- ML20214P549 + (06:10:49, 4 December 2024)
- ML20214P548 + (06:10:49, 4 December 2024)
- PNO-II-86-089, on 861121 & 22,plant Taken Out of Svc to Replace Letdown Sys Trains.On 861121,cooler a Determined to Be Leaking When Radiation Monitor Alarmed When Preparing for Startup.On 861122,RCS Leak Rate Exceeded Tech Spec Limits + (06:10:50, 4 December 2024)
- ML20214P544 + (06:10:51, 4 December 2024)
- ML20214P545 + (06:10:51, 4 December 2024)
- ML20214P543 + (06:10:52, 4 December 2024)
- PNO-II-86-061, on 860827,turbine & Reactor Manually Tripped Due to High Bearing Vibration on Main Turbine.Caused by Damage to Some Turbine Blades on Last Stage of Low Pressure Turbine.Corrective Action Being Evaluated + (06:10:52, 4 December 2024)
- ML20214P541 + (06:10:53, 4 December 2024)
- ML20214P540 + (06:10:54, 4 December 2024)
- ML20214P539 + (06:10:54, 4 December 2024)
- ML20214P537 + (06:10:55, 4 December 2024)
- ML20214P538 + (06:10:55, 4 December 2024)
- ML20214P534 + (06:10:56, 4 December 2024)
- ML20214P532 + (06:10:57, 4 December 2024)
- ML20214P533 + (06:10:57, 4 December 2024)
- ML20214P529 + (06:10:58, 4 December 2024)
- ML20214P530 + (06:10:58, 4 December 2024)
- ML20214P527 + (06:10:59, 4 December 2024)
- ML20214P524 + (06:11:00, 4 December 2024)
- ST-HL-AE-2205, Forwards Revised FSAR Table 11.2-3, Equipment Principal Design Parameters Which Incorporates Change to Capacity of Waste Monitor Tank Pumps 1D,1E & 1F Due to Startup Field Testing + (06:11:00, 4 December 2024)
- ML20214P523 + (06:11:01, 4 December 2024)
- ML20214P521 + (06:11:02, 4 December 2024)
- ML20214P520 + (06:11:02, 4 December 2024)
- ML20214P519 + (06:11:03, 4 December 2024)
- 05000327/LER-1986-050, :on 861030,possible Violation of Surveillance Requirements Discovered.Caused by Error in Surveillance Instruction SI-156.Instruction Will Be Revised to Show Correct Position of Root Valves + (06:11:05, 4 December 2024)
- ML20214P516 + (06:11:05, 4 December 2024)
- PNO-I-86-075, on 860916,operators Removed Unit 1 from Svc to Repair Steam Leak on High Pressure Turbine Steam Return Line.Leak Caused by Steam Erosion on Section of 20-inch Pipe.Affected Section of Pipe Replaced + (06:11:06, 4 December 2024)
- ML20214P514 + (06:11:07, 4 December 2024)
- ML20214P510 + (06:11:08, 4 December 2024)
- ML20214P512 + (06:11:08, 4 December 2024)
- ML20214P508 + (06:11:09, 4 December 2024)
- TXX-5034, Forwards S&W, Comanche Peak Project Procedures (Cppp), Including Project Memo,Except CPPP-7 Which Was Transmitted on 860728 + (06:11:10, 4 December 2024)
- ML20214P507 + (06:11:10, 4 December 2024)
- ML20214P504 + (06:11:11, 4 December 2024)