ML20214P533
ML20214P533 | |
Person / Time | |
---|---|
Site: | Summer |
Issue date: | 09/16/1986 |
From: | Nauman D SOUTH CAROLINA ELECTRIC & GAS CO. |
To: | Harold Denton Office of Nuclear Reactor Regulation |
Shared Package | |
ML20214P535 | List: |
References | |
NUDOCS 8609230215 | |
Download: ML20214P533 (2) | |
Similar Documents at Summer | |
---|---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARRC-99-0201, Suppl 2 to 990819 Application for Amend to License NPF-12 (TSP 980009),revising Heatup & Cooldown Curves in TS 3/4.4.9 RCS Pressure/Temp Limits & TS B 3/4.4.9.Rev 2 to WCAP-15102 Encl1999-10-0808 October 1999
[Table view]Suppl 2 to 990819 Application for Amend to License NPF-12 (TSP 980009),revising Heatup & Cooldown Curves in TS 3/4.4.9 RCS Pressure/Temp Limits & TS B 3/4.4.9.Rev 2 to WCAP-15102 Encl RC-99-0154, Application for Amend to License NPF-12,revising Heatup & Cooldown Curves Located in TS Section 3/4.4.9.Requests Supersedes 990218 Application for Amend in Entirety.Rev 1 to WCAP-15102 Encl1999-08-19019 August 1999 Application for Amend to License NPF-12,revising Heatup & Cooldown Curves Located in TS Section 3/4.4.9.Requests Supersedes 990218 Application for Amend in Entirety.Rev 1 to WCAP-15102 Encl RC-99-0100, Application for Amend to License NPF-12,revising Required Min Contained Volume of CST from 172,000 Gallons of Water to 179,850 Gallons of Water,Per TS Section 3.7.1.3, CST - Lco1999-05-17017 May 1999 Application for Amend to License NPF-12,revising Required Min Contained Volume of CST from 172,000 Gallons of Water to 179,850 Gallons of Water,Per TS Section 3.7.1.3, CST - Lco RC-98-0214, Application for Amend to License NPF-12,revising Testing Methodology Utilized by Vsns to Determine Operability of Charcoal Adsorbers in ESF Air Handling Units1998-12-0404 December 1998 Application for Amend to License NPF-12,revising Testing Methodology Utilized by Vsns to Determine Operability of Charcoal Adsorbers in ESF Air Handling Units ML20153C3871998-09-18018 September 1998 Application for Amend to License NPF-12,revising TS 3.1.3.1, 3.2.2,3.2.3 & 6.9.1.11 by Incorporating W Beacon TR WCAP-12472-P-A to Augment Functionality of Flux Mapping Sys at VC Summer When Thermal Power Is Greater than 25% RTP RC-98-0126, Application for Amend to License NPF-12,revising TS 4.7.7.e to Remove Situational Surveillance Requirement of During Shutdown Following Specified Surveillance Interval of at Least Once Per Eighteen Months1998-07-0101 July 1998 Application for Amend to License NPF-12,revising TS 4.7.7.e to Remove Situational Surveillance Requirement of During Shutdown Following Specified Surveillance Interval of at Least Once Per Eighteen Months RC-98-0016, Application for Amend to License NPF-12,requesting Removal of Table 4.8-1, Diesel Generator Test Schedule1998-02-0909 February 1998 Application for Amend to License NPF-12,requesting Removal of Table 4.8-1, Diesel Generator Test Schedule RC-97-0108, Application for Amend to License NPF-12,revising Testing Methodology Utilized by VCSNS to Determine Operability of Charcoal Adsorbers in Engineering Safeguards Features Air Handling Units1997-05-21021 May 1997 Application for Amend to License NPF-12,revising Testing Methodology Utilized by VCSNS to Determine Operability of Charcoal Adsorbers in Engineering Safeguards Features Air Handling Units RC-97-0065, TS Change Request - TSP 97-04,to License NPF-12,adding Footnote to TS 3.8.1.1, AC Sources - Operating, to Allow One Time Extension of Allowed Outage Time from 72 H to 7 Days to Perform on-line Maint on EDG B During Cycle 111997-03-26026 March 1997 TS Change Request - TSP 97-04,to License NPF-12,adding Footnote to TS 3.8.1.1, AC Sources - Operating, to Allow One Time Extension of Allowed Outage Time from 72 H to 7 Days to Perform on-line Maint on EDG B During Cycle 11 RC-97-0063, TS Change Request - TSP 97-02 to License NPF-12,charging mini-flow Header Isolation Motor Operated Valves1997-03-26026 March 1997 TS Change Request - TSP 97-02 to License NPF-12,charging mini-flow Header Isolation Motor Operated Valves RC-97-0064, TS Change Request - TSP 97-03 to License NPF-12,deleting Conservative from Definition of Core Alterations1997-03-26026 March 1997 TS Change Request - TSP 97-03 to License NPF-12,deleting Conservative from Definition of Core Alterations RC-96-0109, TS Change TSP 950011 to License NPF-12,revising TS 3/4.6, Containment Sys Bases 3/4.6 & TS 6.8, Administrative Controls - Programs & Procedures, to Adopt Implementation Requirements of 10CFR50,App J,Option B1996-04-16016 April 1996 TS Change TSP 950011 to License NPF-12,revising TS 3/4.6, Containment Sys Bases 3/4.6 & TS 6.8, Administrative Controls - Programs & Procedures, to Adopt Implementation Requirements of 10CFR50,App J,Option B RC-96-0076, Application for Amend to License NPF-12,consisting of Change Request 95-03,enhancing LCO & SRs & Revises Bases for QPTR1996-03-19019 March 1996 Application for Amend to License NPF-12,consisting of Change Request 95-03,enhancing LCO & SRs & Revises Bases for QPTR RC-96-0035, Application for Amend to License NPF-12,revising Testing Methodology Utilized by Facility to Determine Operability of Charcoal Filters in ESF Air Handling Units1996-02-10010 February 1996 Application for Amend to License NPF-12,revising Testing Methodology Utilized by Facility to Determine Operability of Charcoal Filters in ESF Air Handling Units RC-95-0212, Application for Amend to License NPF-12,consisting of Change Request 95-07 Re ECCS Pump Testing1995-12-0808 December 1995 Application for Amend to License NPF-12,consisting of Change Request 95-07 Re ECCS Pump Testing RC-95-0299, Application for Amend to License NPF-12,consisting of Change Request 94-02,incorporating Revs to 10CFR20 Corrections of Bases 3/4 11-11995-12-0404 December 1995 Application for Amend to License NPF-12,consisting of Change Request 94-02,incorporating Revs to 10CFR20 Corrections of Bases 3/4 11-1 RC-95-0283, Application for Amend to License NPF-12,consisting of TS Change TSP 950010,allowing One Time Extension of AOT Specified in TS 3/4.5.2 for Each RHR Train from 72 H to 7 Days1995-11-21021 November 1995 Application for Amend to License NPF-12,consisting of TS Change TSP 950010,allowing One Time Extension of AOT Specified in TS 3/4.5.2 for Each RHR Train from 72 H to 7 Days RC-95-0184, Application for Amend to License NPF-12,consisting of TS Change Request 940007,removing Spec for MOVs Thermal Overload Protection & Bypass Devices (3/4.8.4.2) to Follow Guidance of Improved Westinghouse Standardized TS1995-11-14014 November 1995 Application for Amend to License NPF-12,consisting of TS Change Request 940007,removing Spec for MOVs Thermal Overload Protection & Bypass Devices (3/4.8.4.2) to Follow Guidance of Improved Westinghouse Standardized TS RC-95-0258, Application for Amend to License NPF-12,consisting of Change Request 95-01,permitting VCSNS to Operate at Uprate Power Level of 2900 Mwt Core Power When Unit Restarted After Ninth Refueling Outage1995-11-0101 November 1995 Application for Amend to License NPF-12,consisting of Change Request 95-01,permitting VCSNS to Operate at Uprate Power Level of 2900 Mwt Core Power When Unit Restarted After Ninth Refueling Outage RC-95-0226, Application for Amend to License NPF-12,consisting of Change Request TSP 940002,incorporating Revs to 10CFR201995-08-31031 August 1995 Application for Amend to License NPF-12,consisting of Change Request TSP 940002,incorporating Revs to 10CFR20 RC-95-0221, Suppl to TS Change TSP 950006 Re Compatibility W/Plant Operating Experience & Consistent W/Gl 93-051995-08-21021 August 1995 Suppl to TS Change TSP 950006 Re Compatibility W/Plant Operating Experience & Consistent W/Gl 93-05 RC-95-0174, Application for Amend to License NPF-12,consisting of TS Change Request TSP 950001,permitting Plant to Operate at Uprate Power Level of 2,900 Mwt Core Power.Proprietary Best Estimate Analysis... Encl.Analysis Withheld1995-08-18018 August 1995 Application for Amend to License NPF-12,consisting of TS Change Request TSP 950001,permitting Plant to Operate at Uprate Power Level of 2,900 Mwt Core Power.Proprietary Best Estimate Analysis... Encl.Analysis Withheld RC-95-0167, Application for Amend to License NPF-12,consisting of TS Change TSP 950002,revising TS 3/4.4.4 for Pressurizer PORVs to Follow Guidance of GL 90-06,GI 70 & Improved Westinghouse Standardized TS1995-06-30030 June 1995 Application for Amend to License NPF-12,consisting of TS Change TSP 950002,revising TS 3/4.4.4 for Pressurizer PORVs to Follow Guidance of GL 90-06,GI 70 & Improved Westinghouse Standardized TS RC-95-0145, Application for Amend to License NPF-12.Amend Would Revise SR 4.6.1.2 to Delete Schedular Requirements for Type a Testing1995-06-19019 June 1995 Application for Amend to License NPF-12.Amend Would Revise SR 4.6.1.2 to Delete Schedular Requirements for Type a Testing RC-95-0162, TS Change TSP 950006 to License NPF-12,requesting Amend to TS 3/4.6.2, Depressurization & Cooling Sys to Change Required Test Frequency for Reactor Bldg Spray Nozzle Flow Test from Once Per Five Yrs to Once Per Ten Yrs1995-06-19019 June 1995 TS Change TSP 950006 to License NPF-12,requesting Amend to TS 3/4.6.2, Depressurization & Cooling Sys to Change Required Test Frequency for Reactor Bldg Spray Nozzle Flow Test from Once Per Five Yrs to Once Per Ten Yrs RC-95-0058, Application for Amend to License NPF-12,requesting Discontinuation of Seismic Monitoring Network1995-03-0606 March 1995 Application for Amend to License NPF-12,requesting Discontinuation of Seismic Monitoring Network RC-95-0045, Application for Amend to License NPF-12,incorporating Revs to 10CFR201995-02-21021 February 1995 Application for Amend to License NPF-12,incorporating Revs to 10CFR20 RC-95-0028, Suppl to TS Change TSP 940004 to License NPF-12,relocating Seismic Monitoring Instrumentation1995-01-30030 January 1995 Suppl to TS Change TSP 940004 to License NPF-12,relocating Seismic Monitoring Instrumentation RC-94-0313, Application for Amend to License NPF-12 to TS Re Changes to Current SBLOCA Evaluation Model Applicable to Plant1994-12-0707 December 1994 Application for Amend to License NPF-12 to TS Re Changes to Current SBLOCA Evaluation Model Applicable to Plant RC-94-0271, Proposed TS Change Request TSP 940004 to License NPF-12, Relocating Seismic Monitoring Instrumentation Lco,Srs & Associated Tables & Bases in TS Section 3/4.3.3.3 to FSAR or Equivalent Controlled Document1994-10-17017 October 1994 Proposed TS Change Request TSP 940004 to License NPF-12, Relocating Seismic Monitoring Instrumentation Lco,Srs & Associated Tables & Bases in TS Section 3/4.3.3.3 to FSAR or Equivalent Controlled Document RC-94-0184, TS Change TSP 940003 to License NPF-12,permitting Alternative Equivalent Testing Methods to Be Performed on Diesel Fuel Purchased for EDGs & Changing Rev Level of WCAP-10216-P-A, Relaxation of Constant Axial Offset..1994-07-20020 July 1994 TS Change TSP 940003 to License NPF-12,permitting Alternative Equivalent Testing Methods to Be Performed on Diesel Fuel Purchased for EDGs & Changing Rev Level of WCAP-10216-P-A, Relaxation of Constant Axial Offset.. RC-93-0069, Application for Amend to License NPF-12 Consisting of TS Change TSP 930019,replacing SGs Utilized Engineered Safeguards Design Rating of Core power.Non-proprietary Rev 1 to WCAP-13481 & Proprietary Rev 1 to WCAP-13480 Repts Encl1994-03-11011 March 1994 Application for Amend to License NPF-12 Consisting of TS Change TSP 930019,replacing SGs Utilized Engineered Safeguards Design Rating of Core power.Non-proprietary Rev 1 to WCAP-13481 & Proprietary Rev 1 to WCAP-13480 Repts Encl RC-94-0073, Application for Amend to License NPF-12,revising TSs Re Limiting Safety Sys Settings Reactor Trip Sys Instrumentation Trip Setpoints ESF Actuation Sys Instrumentation Setpoint1994-03-11011 March 1994 Application for Amend to License NPF-12,revising TSs Re Limiting Safety Sys Settings Reactor Trip Sys Instrumentation Trip Setpoints ESF Actuation Sys Instrumentation Setpoint RC-94-0076, Application for Amend to License NPF-12,consisting of TS Change TSP 940001,revising AOT for RHR Suction Relief Valves as Specified in LCO for TS 3.4.9.3, Overpressure Protection Sys. Change Parallels Guidance of GL 90-06,GI-941994-03-11011 March 1994 Application for Amend to License NPF-12,consisting of TS Change TSP 940001,revising AOT for RHR Suction Relief Valves as Specified in LCO for TS 3.4.9.3, Overpressure Protection Sys. Change Parallels Guidance of GL 90-06,GI-94 RC-94-0075, Application for Amend to License NPF-12,consisting of TS Change TSP 930012,deleting TS SR 4.8.4.1.a.3 Which Mandates Periodic Retesting of Penetration Protection Fuses & Bases B 3/4.8.4 Will Also Delete Refs to Subj Fuses1994-03-11011 March 1994 Application for Amend to License NPF-12,consisting of TS Change TSP 930012,deleting TS SR 4.8.4.1.a.3 Which Mandates Periodic Retesting of Penetration Protection Fuses & Bases B 3/4.8.4 Will Also Delete Refs to Subj Fuses RC-94-0049, Application for Amend to License NPF-12,incorporating Current Provisions of 10CFR50.36(a)2 Re Semiannual Radioactive Effluent Release Rept to Be Submitted Annually Rather than Semiannually1994-02-25025 February 1994 Application for Amend to License NPF-12,incorporating Current Provisions of 10CFR50.36(a)2 Re Semiannual Radioactive Effluent Release Rept to Be Submitted Annually Rather than Semiannually RC-93-0304, Application for Amend to License NPF-12,consisting of TS Change TSP 930017,revising Figures 3.9-1 & 3.9-2 to Permit Storage of Fuel Assemblies in Region 2 & 3,respectively,of Spent Fuel Storage Racks1993-12-13013 December 1993 Application for Amend to License NPF-12,consisting of TS Change TSP 930017,revising Figures 3.9-1 & 3.9-2 to Permit Storage of Fuel Assemblies in Region 2 & 3,respectively,of Spent Fuel Storage Racks ML20045F7751993-06-30030 June 1993 Application for Amend to License NPF-12,revising EFW TS SR 4.7.1.2 to Reflect Actual Secondary Steam Pressure Conditions Consistent W/Analysis Performed in Support of Increased SG Tube Plugging Margin ML20044G7491993-05-25025 May 1993 Application for Amend to License NPF-12,changing TS 4.7.1.2.a.2 to Perform Turbine Driven Pump Surveillance Test at Secondary Steam Pressure Greater than or Equal to 865 Psi ML20045C3401993-05-25025 May 1993 Corrected Application for Amend to License NPF-12,changing Tech Spec 4.7.1.2.a.2 to Perform Turbine Driven Pump Surveillance Test at Secondary Steam Pressure Greater than or Equal to 865 Psig.Enforcement Discretion Also Requested RC-93-0039, Application for Amend to License NPF-12,modifying Insp Requirements in TS 3/4.4.5, SGs & LCO for 3/4.4.6.2, Operational Leakage to Avoid Unnecessary Plugging of SG Tubes W/O Compromising Safety1993-02-12012 February 1993 Application for Amend to License NPF-12,modifying Insp Requirements in TS 3/4.4.5, SGs & LCO for 3/4.4.6.2, Operational Leakage to Avoid Unnecessary Plugging of SG Tubes W/O Compromising Safety RC-93-0021, Application for Amend to License NPF-12,revising TS Bases 3/4.3.1 & 3/4.3.2 to Incorporate Issuance of Amend 108 Which Revised ESFs Response Times to Account for Sequential Stroking of Outlet Isolation Valves for RWST & VCT1993-01-29029 January 1993 Application for Amend to License NPF-12,revising TS Bases 3/4.3.1 & 3/4.3.2 to Incorporate Issuance of Amend 108 Which Revised ESFs Response Times to Account for Sequential Stroking of Outlet Isolation Valves for RWST & VCT ML20126E2351992-12-22022 December 1992 Application for Amend to License NPF-12,revising TS Bases 3/4.5.4 & 3/4.6.2.2 to Lower Value of Ph Range of Solution Circulated Through Sump Following Design Basis Loca,Based on More Rigorous Calculations to Update RB Spray Sys ML20116M4941992-11-13013 November 1992 Suppl to 910204 & 920902 Applications for Amend to License NPF-12,changing Main Steam Safety Valve Setpoint Tolerance from Plus or Minus 1% to Plus or Minus 3% ML20115A5351992-10-0606 October 1992 Application for Amend to License NPF-12,consisting of TSP 920002,revising TS Table 2.2-1, RTS Instrumentation Trip Setpoints to Allow Increase in Max Permissible Average Level of SG Tube Plugging from 15% to 18% ML20115A3651992-10-0606 October 1992 Application for Amend to License NPF-12,consisting of TS Change TSP 910005,revising TS 3/4.4.9,Figures 3.4-2 & 3.4-3 Re PT Curves & Deleting Table 4.4-5 & Ref to SR 4.4.9.1.2, in Ref to GL 91-01 ML20106B1751992-09-23023 September 1992 Application for Amend to License NPF-12,changing TS to Remove Table 3.6-1, Containment Isolation Valves Per Guidance Provided in GL 91-08 ML20105B5301992-09-0808 September 1992 Application for Amend to License NPF-12,revising TS SR 4.7.1.2 Re Emergency Feedwater Pumps to Provide Conservative Pump Discharge Pressure for Verifying Operability of Each motor-driven Emergency Feedwater Pump ML20102A8061992-07-22022 July 1992 Application for Amend to License NPF-12,consisting of TS Change TSP 890005,revising Accident Monitoring Instrumentation in TS 3/4.3.3.6,Tables 3.3-10 & 4.3-7 for Consistency W/Accepted Program,Per Rev 3 to Reg Guide 1.97 ML20095A6851992-04-15015 April 1992 Application for Amend to License NPF-12,consisting of TS Change TSP 890022 to Revise TS Table 3.3-5, ESFs Response Times to Incorporate Addl Time Requirements to Account for Sequential Stroking of RWST & VCT Outlet Isolation Valves 1999-08-19 Category:TEXT-LICENSE APPLICATIONS & PERMITS MONTHYEARRC-99-0201, Suppl 2 to 990819 Application for Amend to License NPF-12 (TSP 980009),revising Heatup & Cooldown Curves in TS 3/4.4.9 RCS Pressure/Temp Limits & TS B 3/4.4.9.Rev 2 to WCAP-15102 Encl1999-10-0808 October 1999
[Table view]Suppl 2 to 990819 Application for Amend to License NPF-12 (TSP 980009),revising Heatup & Cooldown Curves in TS 3/4.4.9 RCS Pressure/Temp Limits & TS B 3/4.4.9.Rev 2 to WCAP-15102 Encl RC-99-0154, Application for Amend to License NPF-12,revising Heatup & Cooldown Curves Located in TS Section 3/4.4.9.Requests Supersedes 990218 Application for Amend in Entirety.Rev 1 to WCAP-15102 Encl1999-08-19019 August 1999 Application for Amend to License NPF-12,revising Heatup & Cooldown Curves Located in TS Section 3/4.4.9.Requests Supersedes 990218 Application for Amend in Entirety.Rev 1 to WCAP-15102 Encl RC-99-0100, Application for Amend to License NPF-12,revising Required Min Contained Volume of CST from 172,000 Gallons of Water to 179,850 Gallons of Water,Per TS Section 3.7.1.3, CST - Lco1999-05-17017 May 1999 Application for Amend to License NPF-12,revising Required Min Contained Volume of CST from 172,000 Gallons of Water to 179,850 Gallons of Water,Per TS Section 3.7.1.3, CST - Lco RC-98-0214, Application for Amend to License NPF-12,revising Testing Methodology Utilized by Vsns to Determine Operability of Charcoal Adsorbers in ESF Air Handling Units1998-12-0404 December 1998 Application for Amend to License NPF-12,revising Testing Methodology Utilized by Vsns to Determine Operability of Charcoal Adsorbers in ESF Air Handling Units ML20153C3871998-09-18018 September 1998 Application for Amend to License NPF-12,revising TS 3.1.3.1, 3.2.2,3.2.3 & 6.9.1.11 by Incorporating W Beacon TR WCAP-12472-P-A to Augment Functionality of Flux Mapping Sys at VC Summer When Thermal Power Is Greater than 25% RTP RC-98-0126, Application for Amend to License NPF-12,revising TS 4.7.7.e to Remove Situational Surveillance Requirement of During Shutdown Following Specified Surveillance Interval of at Least Once Per Eighteen Months1998-07-0101 July 1998 Application for Amend to License NPF-12,revising TS 4.7.7.e to Remove Situational Surveillance Requirement of During Shutdown Following Specified Surveillance Interval of at Least Once Per Eighteen Months RC-98-0016, Application for Amend to License NPF-12,requesting Removal of Table 4.8-1, Diesel Generator Test Schedule1998-02-0909 February 1998 Application for Amend to License NPF-12,requesting Removal of Table 4.8-1, Diesel Generator Test Schedule RC-97-0108, Application for Amend to License NPF-12,revising Testing Methodology Utilized by VCSNS to Determine Operability of Charcoal Adsorbers in Engineering Safeguards Features Air Handling Units1997-05-21021 May 1997 Application for Amend to License NPF-12,revising Testing Methodology Utilized by VCSNS to Determine Operability of Charcoal Adsorbers in Engineering Safeguards Features Air Handling Units RC-97-0065, TS Change Request - TSP 97-04,to License NPF-12,adding Footnote to TS 3.8.1.1, AC Sources - Operating, to Allow One Time Extension of Allowed Outage Time from 72 H to 7 Days to Perform on-line Maint on EDG B During Cycle 111997-03-26026 March 1997 TS Change Request - TSP 97-04,to License NPF-12,adding Footnote to TS 3.8.1.1, AC Sources - Operating, to Allow One Time Extension of Allowed Outage Time from 72 H to 7 Days to Perform on-line Maint on EDG B During Cycle 11 RC-97-0063, TS Change Request - TSP 97-02 to License NPF-12,charging mini-flow Header Isolation Motor Operated Valves1997-03-26026 March 1997 TS Change Request - TSP 97-02 to License NPF-12,charging mini-flow Header Isolation Motor Operated Valves RC-97-0064, TS Change Request - TSP 97-03 to License NPF-12,deleting Conservative from Definition of Core Alterations1997-03-26026 March 1997 TS Change Request - TSP 97-03 to License NPF-12,deleting Conservative from Definition of Core Alterations ML20128G2891996-10-0202 October 1996 Amend 135 to License NPF-12,changing TS for Plant Unit 1,in Response to 960416 Application,As Suppl by RC-96-0109, TS Change TSP 950011 to License NPF-12,revising TS 3/4.6, Containment Sys Bases 3/4.6 & TS 6.8, Administrative Controls - Programs & Procedures, to Adopt Implementation Requirements of 10CFR50,App J,Option B1996-04-16016 April 1996 TS Change TSP 950011 to License NPF-12,revising TS 3/4.6, Containment Sys Bases 3/4.6 & TS 6.8, Administrative Controls - Programs & Procedures, to Adopt Implementation Requirements of 10CFR50,App J,Option B RC-96-0076, Application for Amend to License NPF-12,consisting of Change Request 95-03,enhancing LCO & SRs & Revises Bases for QPTR1996-03-19019 March 1996 Application for Amend to License NPF-12,consisting of Change Request 95-03,enhancing LCO & SRs & Revises Bases for QPTR RC-96-0035, Application for Amend to License NPF-12,revising Testing Methodology Utilized by Facility to Determine Operability of Charcoal Filters in ESF Air Handling Units1996-02-10010 February 1996 Application for Amend to License NPF-12,revising Testing Methodology Utilized by Facility to Determine Operability of Charcoal Filters in ESF Air Handling Units RC-95-0212, Application for Amend to License NPF-12,consisting of Change Request 95-07 Re ECCS Pump Testing1995-12-0808 December 1995 Application for Amend to License NPF-12,consisting of Change Request 95-07 Re ECCS Pump Testing RC-95-0299, Application for Amend to License NPF-12,consisting of Change Request 94-02,incorporating Revs to 10CFR20 Corrections of Bases 3/4 11-11995-12-0404 December 1995 Application for Amend to License NPF-12,consisting of Change Request 94-02,incorporating Revs to 10CFR20 Corrections of Bases 3/4 11-1 RC-95-0283, Application for Amend to License NPF-12,consisting of TS Change TSP 950010,allowing One Time Extension of AOT Specified in TS 3/4.5.2 for Each RHR Train from 72 H to 7 Days1995-11-21021 November 1995 Application for Amend to License NPF-12,consisting of TS Change TSP 950010,allowing One Time Extension of AOT Specified in TS 3/4.5.2 for Each RHR Train from 72 H to 7 Days RC-95-0184, Application for Amend to License NPF-12,consisting of TS Change Request 940007,removing Spec for MOVs Thermal Overload Protection & Bypass Devices (3/4.8.4.2) to Follow Guidance of Improved Westinghouse Standardized TS1995-11-14014 November 1995 Application for Amend to License NPF-12,consisting of TS Change Request 940007,removing Spec for MOVs Thermal Overload Protection & Bypass Devices (3/4.8.4.2) to Follow Guidance of Improved Westinghouse Standardized TS RC-95-0258, Application for Amend to License NPF-12,consisting of Change Request 95-01,permitting VCSNS to Operate at Uprate Power Level of 2900 Mwt Core Power When Unit Restarted After Ninth Refueling Outage1995-11-0101 November 1995 Application for Amend to License NPF-12,consisting of Change Request 95-01,permitting VCSNS to Operate at Uprate Power Level of 2900 Mwt Core Power When Unit Restarted After Ninth Refueling Outage RC-95-0226, Application for Amend to License NPF-12,consisting of Change Request TSP 940002,incorporating Revs to 10CFR201995-08-31031 August 1995 Application for Amend to License NPF-12,consisting of Change Request TSP 940002,incorporating Revs to 10CFR20 RC-95-0221, Suppl to TS Change TSP 950006 Re Compatibility W/Plant Operating Experience & Consistent W/Gl 93-051995-08-21021 August 1995 Suppl to TS Change TSP 950006 Re Compatibility W/Plant Operating Experience & Consistent W/Gl 93-05 RC-95-0174, Application for Amend to License NPF-12,consisting of TS Change Request TSP 950001,permitting Plant to Operate at Uprate Power Level of 2,900 Mwt Core Power.Proprietary Best Estimate Analysis... Encl.Analysis Withheld1995-08-18018 August 1995 Application for Amend to License NPF-12,consisting of TS Change Request TSP 950001,permitting Plant to Operate at Uprate Power Level of 2,900 Mwt Core Power.Proprietary Best Estimate Analysis... Encl.Analysis Withheld RC-95-0167, Application for Amend to License NPF-12,consisting of TS Change TSP 950002,revising TS 3/4.4.4 for Pressurizer PORVs to Follow Guidance of GL 90-06,GI 70 & Improved Westinghouse Standardized TS1995-06-30030 June 1995 Application for Amend to License NPF-12,consisting of TS Change TSP 950002,revising TS 3/4.4.4 for Pressurizer PORVs to Follow Guidance of GL 90-06,GI 70 & Improved Westinghouse Standardized TS RC-95-0162, TS Change TSP 950006 to License NPF-12,requesting Amend to TS 3/4.6.2, Depressurization & Cooling Sys to Change Required Test Frequency for Reactor Bldg Spray Nozzle Flow Test from Once Per Five Yrs to Once Per Ten Yrs1995-06-19019 June 1995 TS Change TSP 950006 to License NPF-12,requesting Amend to TS 3/4.6.2, Depressurization & Cooling Sys to Change Required Test Frequency for Reactor Bldg Spray Nozzle Flow Test from Once Per Five Yrs to Once Per Ten Yrs RC-95-0145, Application for Amend to License NPF-12.Amend Would Revise SR 4.6.1.2 to Delete Schedular Requirements for Type a Testing1995-06-19019 June 1995 Application for Amend to License NPF-12.Amend Would Revise SR 4.6.1.2 to Delete Schedular Requirements for Type a Testing RC-95-0058, Application for Amend to License NPF-12,requesting Discontinuation of Seismic Monitoring Network1995-03-0606 March 1995 Application for Amend to License NPF-12,requesting Discontinuation of Seismic Monitoring Network RC-95-0045, Application for Amend to License NPF-12,incorporating Revs to 10CFR201995-02-21021 February 1995 Application for Amend to License NPF-12,incorporating Revs to 10CFR20 RC-95-0028, Suppl to TS Change TSP 940004 to License NPF-12,relocating Seismic Monitoring Instrumentation1995-01-30030 January 1995 Suppl to TS Change TSP 940004 to License NPF-12,relocating Seismic Monitoring Instrumentation RC-94-0313, Application for Amend to License NPF-12 to TS Re Changes to Current SBLOCA Evaluation Model Applicable to Plant1994-12-0707 December 1994 Application for Amend to License NPF-12 to TS Re Changes to Current SBLOCA Evaluation Model Applicable to Plant RC-94-0271, Proposed TS Change Request TSP 940004 to License NPF-12, Relocating Seismic Monitoring Instrumentation Lco,Srs & Associated Tables & Bases in TS Section 3/4.3.3.3 to FSAR or Equivalent Controlled Document1994-10-17017 October 1994 Proposed TS Change Request TSP 940004 to License NPF-12, Relocating Seismic Monitoring Instrumentation Lco,Srs & Associated Tables & Bases in TS Section 3/4.3.3.3 to FSAR or Equivalent Controlled Document RC-94-0184, TS Change TSP 940003 to License NPF-12,permitting Alternative Equivalent Testing Methods to Be Performed on Diesel Fuel Purchased for EDGs & Changing Rev Level of WCAP-10216-P-A, Relaxation of Constant Axial Offset..1994-07-20020 July 1994 TS Change TSP 940003 to License NPF-12,permitting Alternative Equivalent Testing Methods to Be Performed on Diesel Fuel Purchased for EDGs & Changing Rev Level of WCAP-10216-P-A, Relaxation of Constant Axial Offset.. RC-94-0075, Application for Amend to License NPF-12,consisting of TS Change TSP 930012,deleting TS SR 4.8.4.1.a.3 Which Mandates Periodic Retesting of Penetration Protection Fuses & Bases B 3/4.8.4 Will Also Delete Refs to Subj Fuses1994-03-11011 March 1994 Application for Amend to License NPF-12,consisting of TS Change TSP 930012,deleting TS SR 4.8.4.1.a.3 Which Mandates Periodic Retesting of Penetration Protection Fuses & Bases B 3/4.8.4 Will Also Delete Refs to Subj Fuses RC-94-0076, Application for Amend to License NPF-12,consisting of TS Change TSP 940001,revising AOT for RHR Suction Relief Valves as Specified in LCO for TS 3.4.9.3, Overpressure Protection Sys. Change Parallels Guidance of GL 90-06,GI-941994-03-11011 March 1994 Application for Amend to License NPF-12,consisting of TS Change TSP 940001,revising AOT for RHR Suction Relief Valves as Specified in LCO for TS 3.4.9.3, Overpressure Protection Sys. Change Parallels Guidance of GL 90-06,GI-94 RC-93-0069, Application for Amend to License NPF-12 Consisting of TS Change TSP 930019,replacing SGs Utilized Engineered Safeguards Design Rating of Core power.Non-proprietary Rev 1 to WCAP-13481 & Proprietary Rev 1 to WCAP-13480 Repts Encl1994-03-11011 March 1994 Application for Amend to License NPF-12 Consisting of TS Change TSP 930019,replacing SGs Utilized Engineered Safeguards Design Rating of Core power.Non-proprietary Rev 1 to WCAP-13481 & Proprietary Rev 1 to WCAP-13480 Repts Encl RC-94-0073, Application for Amend to License NPF-12,revising TSs Re Limiting Safety Sys Settings Reactor Trip Sys Instrumentation Trip Setpoints ESF Actuation Sys Instrumentation Setpoint1994-03-11011 March 1994 Application for Amend to License NPF-12,revising TSs Re Limiting Safety Sys Settings Reactor Trip Sys Instrumentation Trip Setpoints ESF Actuation Sys Instrumentation Setpoint RC-94-0049, Application for Amend to License NPF-12,incorporating Current Provisions of 10CFR50.36(a)2 Re Semiannual Radioactive Effluent Release Rept to Be Submitted Annually Rather than Semiannually1994-02-25025 February 1994 Application for Amend to License NPF-12,incorporating Current Provisions of 10CFR50.36(a)2 Re Semiannual Radioactive Effluent Release Rept to Be Submitted Annually Rather than Semiannually RC-93-0304, Application for Amend to License NPF-12,consisting of TS Change TSP 930017,revising Figures 3.9-1 & 3.9-2 to Permit Storage of Fuel Assemblies in Region 2 & 3,respectively,of Spent Fuel Storage Racks1993-12-13013 December 1993 Application for Amend to License NPF-12,consisting of TS Change TSP 930017,revising Figures 3.9-1 & 3.9-2 to Permit Storage of Fuel Assemblies in Region 2 & 3,respectively,of Spent Fuel Storage Racks ML20057E4211993-10-0404 October 1993 Corrected TS Bases 3/4.5.4 & 3/4.6.2.2 Re Emergency Core Cooling & Containment Sys ML20057E3991993-10-0404 October 1993 Corrected Amend 109 to License NPF-12,consisting of Changes to TS Bases 3/4.7.1.2 ML20045F7751993-06-30030 June 1993 Application for Amend to License NPF-12,revising EFW TS SR 4.7.1.2 to Reflect Actual Secondary Steam Pressure Conditions Consistent W/Analysis Performed in Support of Increased SG Tube Plugging Margin ML20044G7491993-05-25025 May 1993 Application for Amend to License NPF-12,changing TS 4.7.1.2.a.2 to Perform Turbine Driven Pump Surveillance Test at Secondary Steam Pressure Greater than or Equal to 865 Psi ML20045C3401993-05-25025 May 1993 Corrected Application for Amend to License NPF-12,changing Tech Spec 4.7.1.2.a.2 to Perform Turbine Driven Pump Surveillance Test at Secondary Steam Pressure Greater than or Equal to 865 Psig.Enforcement Discretion Also Requested RC-93-0039, Application for Amend to License NPF-12,modifying Insp Requirements in TS 3/4.4.5, SGs & LCO for 3/4.4.6.2, Operational Leakage to Avoid Unnecessary Plugging of SG Tubes W/O Compromising Safety1993-02-12012 February 1993 Application for Amend to License NPF-12,modifying Insp Requirements in TS 3/4.4.5, SGs & LCO for 3/4.4.6.2, Operational Leakage to Avoid Unnecessary Plugging of SG Tubes W/O Compromising Safety RC-93-0021, Application for Amend to License NPF-12,revising TS Bases 3/4.3.1 & 3/4.3.2 to Incorporate Issuance of Amend 108 Which Revised ESFs Response Times to Account for Sequential Stroking of Outlet Isolation Valves for RWST & VCT1993-01-29029 January 1993 Application for Amend to License NPF-12,revising TS Bases 3/4.3.1 & 3/4.3.2 to Incorporate Issuance of Amend 108 Which Revised ESFs Response Times to Account for Sequential Stroking of Outlet Isolation Valves for RWST & VCT ML20126E2351992-12-22022 December 1992 Application for Amend to License NPF-12,revising TS Bases 3/4.5.4 & 3/4.6.2.2 to Lower Value of Ph Range of Solution Circulated Through Sump Following Design Basis Loca,Based on More Rigorous Calculations to Update RB Spray Sys ML20116M4941992-11-13013 November 1992 Suppl to 910204 & 920902 Applications for Amend to License NPF-12,changing Main Steam Safety Valve Setpoint Tolerance from Plus or Minus 1% to Plus or Minus 3% ML20115A5351992-10-0606 October 1992 Application for Amend to License NPF-12,consisting of TSP 920002,revising TS Table 2.2-1, RTS Instrumentation Trip Setpoints to Allow Increase in Max Permissible Average Level of SG Tube Plugging from 15% to 18% ML20115A3651992-10-0606 October 1992 Application for Amend to License NPF-12,consisting of TS Change TSP 910005,revising TS 3/4.4.9,Figures 3.4-2 & 3.4-3 Re PT Curves & Deleting Table 4.4-5 & Ref to SR 4.4.9.1.2, in Ref to GL 91-01 ML20106B1751992-09-23023 September 1992 Application for Amend to License NPF-12,changing TS to Remove Table 3.6-1, Containment Isolation Valves Per Guidance Provided in GL 91-08 1999-08-19 |
Text
..
_. ~. .
- South Carolina Electric & Gas Company Den A. Nauman P.O. Box 764 Vice Preside .t u b. 29218 Nuclear Operations
. .e u,, ,
September 16,1986
?
Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington,DC 20555
SUBJECT:
Virgil C. Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12
" Containment StructualIntegrity" Surveillance Requirement
Dear Mr. Denton:
This proposed change is to the Surveillance Requirements of Section 3.6.1.6, "Contamment Structural Integrity". The change, as shown in Attachment 1, revises the number and the representative sample of tendons to be tested, deletes Tables 4.6-1a,4.6-1b and 4.6-2, and revises the minimum required average tendon force for each group of tendons.
The proposed change involves a revision of the tendon testing program for the reactor containment building. It specifies the testing program to be used in the future for containment tendons and will adequately verify the ability of the tendons to perform their design function. The testing program will continue to provide assurance of the integrity of the containment post-tensioning system and will provide for warning and appropriate actions if " abnormal degradation" should develop.
The change is being generated due to the following:
t l e The present Technical Specifications requires that the tendon testing l program be specified after the 3rd surveillance for the remainder of plant operation. SCE&G completed the third surveillance in December of 1985.
e The acceptance criteria in the present Technical Specifications has been determined to be conservatively hi for required minimum average tendon force. Reference January 17,1985, Special Report 85-021) submittal from D. A. Nauman to Dr. J. Nelson Grace e The tables in the existing Technical S secifications cause many problems due to their specific nature and are consic ered unnecessary.
The proposed Technical Specification revision identifies the appropriate surveillance intervals and number of tendons to be examined for all subsequent surveillances. Specific tendons have purposely not been included in tables in the proposed Technical Specification revision and will instead be identified in station surveillance factors for eachprocedures.
specific tendon Additionally,dentified will be i in the station procedures andacce.
efad. Soff 8609230215 860916 p
DR ADOCK 05000395 Nf .d- 7]i3eIY PDR s
Mr. Harold R. Denton Containment StructuralIntegrity
. Page 2 September 16,1986 not in the Technical Specifications. This format will eliminate the need for further Technical Specification changes in the event a tendon has to be substituted at inspection time due to an unforeseen interference which may have developed.
The acceptance criteria has been revised for minimum average required tendon forces to reflect the design conditions. Calculations performed subsequent to original plant licensing b,y SCE&G's architectural engineer, Gilbert Commonwealth, have determined that the present Technical Specification limits are excessively conservative. Therefore, these calculations have been utilized to support the proposed revised minimum average tendon forces.
Attachment ll to this letter is SCE&G's "No Significant Hazards Determination."
This change has been reviewed and approved by both the Plant Safety Review Committee and the Nuclear Safety Review Committee.
Please find enclosed the application fee of $150.00 required by 10CFR170.
The statements and matters set forth in this submittal are true and correct to the best of my knowledge,information and belief.
If you should have any questions, please advice.
e truly yErs, 1
\>'D. .Naumon@%
RJB: DAN /bh Enclosures pc: O. W. Dixon, Jr/T. C. Nichols, J r. C. L. Ligon (NSRC)
E. H. Crews, Jr. R. M. Campbell, Jr.
E. C. Roberts K. E. Nodland O. S. Bradham R. A. Stough D. R. Moore G. O. Percival J. G. Connelly, Jr. R. L. Prevatte W. A. Williams, Jr. J. B. Knotts, Jr.
J. Nelson Grace H. G. Shealy Group Managers NPCF
- W. R. Baeh r File j C. A. Price 1
I t
I