Corrected Special Rept 86-005:on 861027,licensee Failed to Submit Suppl II to Dcrdr,Per License Condition 2.C.12.a. Caused by Unexpected Heavy Work Load & Inappropriate Mgt Attention.Suppl II Submitted on 861112
ML20214P521
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 11/26/1986
From: Salvesen R
Public Service Enterprise Group
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
86-005, 86-5, NUDOCS 8612040250
Download: ML20214P521 (4)


Text

o *

  • O PSl4G Public Serwce Electric and Gas Company P.O. Box L Hancocks Bndge, New Jersey 08038 Hope Creek Operations November 26, 1986 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Dear Sir:

HOPE CREEK GENERATING STATION DOCKET NO. 50-354 UNIT NO. 1 SPECIAL REPORT 86-995 This Special Report was initially submitted on November 25, 1986 pursuant to the requirements of Hope Creek License Section 2.F.

However the original submittal, while approved, did not include the . General Manager signoff on the actual report. Thus, the report is being resubmitted with the required signature.

Sincerely yours, j7 5, j gudS0 A ~

R. S. Salvesen General Manager -

Hope Creek Operations RGB:t1b Attachment C Distribution geh2ogggt gggaggi p,.

I I \

The Energy People i 35-2173 t i 1 V; 12 6

e - e u S fruCLlaid L.touLArOmv CoomseeBoons j seat Pwe JOB

'8# Apenovt0 Oest eso 3,30410e LICENSEE EVENT REPORT (LER)

DOCasT a.vuesa => a== 4 =

PACiuTT =Ame m .

Hope Creek Generating Station o is t o lo I o l31514 1loFl 01 3 TITLSdAFailure td Submit Control Room Design Review, Supplement II,86-005 in i Accordance with License Corldition 2.C. 12.a - Soecial Renort

)

ave =7 OATe im Len avumea in aeronT DATs m OTManPACiuTies =v0Lvs0<ei E Tu OAv veAn veAn g',;;'

. = uo=TM OAv veAn Paou" Ma== OOC =sT au=na's 0 151010101 1 I

~ ~

1l0 2l 7 86 Twis 8l6 Nl Al l 1l 1 2l1 8l 6 o isto to1o g l l a:PonT is sueuiTnO PunsuA=7 TO Two a:Quinsus=To OP to C,a g. ,c u. . ., m. w ~.,, im

====i' n .e, n<.i o H., n.,1..

1 . . . _ _ _

a 30 aegisH1HG 90.38teH1) to 734elalM 73.7Het no, o is is = a.< imm _

= =e>=> _

-n >aHv >

2 ==sg;g J6SA)

= 40S(eH1Halp 90.7SieH2HG 00.73te1(2HedlHA) 30 easteH1Havl 00.734elaHg) 30.73(aH2Hv4MilB) 30 aes;mH1Het ge.73sH2HIIe so.734eit2Hal Licassett COseTACT Poa TM,8 LEn Itti seAug TELEPMO4E NLA*Sta AngA CODE Robert Swartzwelder. Senior Enaineer 61019 3!31 91-14I71614 COe8PLEft ONE LthE POa E ACu COMPO8EENT F AILunt DE8caiBIO iN TMIS atPon? Ital 8

CAuSt SvS7tw CowPONENT " h'O s' CAUSE Sv5 TEM COMPONENT "'"NEa " h'O P"a "A"NNO y

I I I I I I I I I I I I I I I I I I I l l 1 I ! ! I I I SUPPLaessesTAL ASPOa7 EXPECTED 1948 MONTM OAV Ytaa SUOuessiON 7it (If peu, eenwen IMPfCTfD SUDst!SSION DA TE) NO l l l Aura ACT to . ra .- a . .,-..--, ui .ac. .-. ,>,.-e- u , n =

On September 27, 1986 the licensee failed to submit Supplement II of the Hope Ci sek Detailed Control Room Design Report (DCRDR) as specified in Licensee Condition 2.C.12.a. The NRC was notified of the event at 1955 hours0.0226 days <br />0.543 hours <br />0.00323 weeks <br />7.438775e-4 months <br /> by the Senior Nuclear Shift Supervisor.

Section 2.C.12.a required Supplement II to be submitted within six months from fuel load. Fuel loading was completed April 27, 1986, thus the report was required by October 27, 1986. The report was l not submitted in a timely manner due to heavy work load associated with activities surrounding the Loss of Offsite Power. Testing. The completed report was submitted on November 12, 1986. This report is being submitted in accordance with Hope Creek License Section 2.F.

i l

4,43 l - - - - . _ _ , , __ __

MAC p.,e 3esa u 8 NUCkt&W KEGULAf027 Coww'5Siom

* LICENSEE EVENT REPORT (LER) TEXT CONTINUATION a**aovio owe so 3m-oia tapists t3tes DoCatr quween m pact zu eacs6svv mawa tu tte Nuwet A e6e

.. - am;- . :w.y: (

)

Hope Creek Generating Station o;5;ojajoI3l514 81 6 -

NI Al l 01 2 0' 0l3 tt,r ,, . C w.,im PLANT BED EXBTEM 1 DEET 121Cb11DE General Electric - Boiling Water Reactor (BWR/4)

Control Room Design Review IDENTIFICATION DE DCCURBEECE Failure to submit Control Room Design Review, Supplement II, in accordance with Licensee condition 2.C.12.a.

Event Date: 10/27/86 Event Time: 1955 DESCB1221DE DE DCCURRENCE In accordance with the requirements of NUREG 0737, a DCRDR was performed. Due to the ongoing construction, and outstanding NRC comments, supplements were required to complete the DCRDR. PSE&G provided a schedule for submitting supplements to the initial report in a letter dated January 9, 1986. This schedule called for submittal of supplement II 6 months after fuel load and submittal of Supplement III 1 year after fuel load. This schedule as presented in the PSE&G 1etter was incorporated as License Condition 2.C.12.a. Contrary to the schedule in the PSE&G 1etter of January

'9, 1986, Supplement II to the Hope Creek DCRDR was not submitted by October 27, 1986.

ANALYElf Of DCCURRENCE The failure to submit Supplement II in accordance with the schedule was caused in part by an unexpected volume of work load in preparing Hope Creek for operation, with particular emphasis on the activities surrounding the Loss of Power Test, coupled with the NRC requirement to include temporary zone markings prio.r to exceeding 5% power level. The event was compounded by an inappropriate level of management attention to ensure the required submittal schedule was met. Failure to submit the supplemental information in accordance with the schedule was evaluated and did not impact the health and safety of the public. None of the Human Engineering Deficiencies (BEDS) addressed to date have identified a safety concern that required immediate corrective action.

CDEBECZ1ME ACZ1DB The corrective actions included a concerted effort to complete preparation and submittal of Supplement II to the Hope Creek DCRDR, which was submitted November 12, 1986. Additionally, the appropriate pers;anel were advised as to the importance of proper tracking of commitments to ensure required submittals are made in a timely manner.

,~,rg. .w u

u 5 huCLEAA KEGULATOST C08 8M'$$+C4

':sc reese 3 sea

'"" ==oveo owe so usam. I LICENSEE EVENT REPORT (LER) TEXT CONTINUATION E m8<*ts 4-31 el l pacauty asaast ste DoCast wwweta 2s Lee huweta v6s esce i31 eaa "t',1; "%'.?:

Hopo Creek Generating Station o95 gogo lo!3l514 81 6 -

NIAl -

l O I ~4 0' nh r.n,,- . - 4.c m, - .,nn CORRECTIVE ACTIONS CONT'D The event posed no threat to the health and safety of the public.

This report is being submitted in accordance with Hope Creek License Section 2.F.

Sincerely, q,$, sat.06560 R. S. Salvesen General Manager -