Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20214T788 + (05:23:18, 4 December 2024)
- TXX-6082, Forwards Response to Violations Noted in Insp Repts 50-445/86-17 & 50-446/86-14.Corrective Actions:Maint of QA Corrective Action & Design Assurance Program General & Discipline Files Improved + (05:23:19, 4 December 2024)
- ML20214T784 + (05:23:21, 4 December 2024)
- ML20214T783 + (05:23:22, 4 December 2024)
- RBG-24850, Special Rept:On 861025,invalid Failure Occurred on Div II Diesel Generator During Surveillance Testing.Caused by Loose Particle in Relay Inside Voltage Regulator motor-operated Potentiometer.Div I Relay Placed in Div II Generator + (05:23:22, 4 December 2024)
- ST-HL-AE-2221, Forwards Annotated Revs to FSAR Chapters 13 & 14.Revs Update Description of Facilities Electric Generating Station Organization & Provide Editorial Changes.Changes Will Be Incorporated in Future FSAR Amend + (05:23:23, 4 December 2024)
- ML20214T779 + (05:23:24, 4 December 2024)
- ST-HL-AE-2224, Third Interim Deficiency Rept Re Failure of Reactor Vessel Temporary Full Flow Filters.Initially Reported on 870406. Detailed Insp of RCS & Interfacing Sys for Failed Screen Matl Underway.Next Rept Will Be Submitted by 870612 + (05:23:25, 4 December 2024)
- ML20214T776 + (05:23:26, 4 December 2024)
- ML20214T773 + (05:23:26, 4 December 2024)
- ML20214T772 + (05:23:27, 4 December 2024)
- ML20214T769 + (05:23:31, 4 December 2024)
- ML20214T765 + (05:23:32, 4 December 2024)
- ML20214T766 + (05:23:32, 4 December 2024)
- ML20214T761 + (05:23:33, 4 December 2024)
- ML20214T758 + (05:23:34, 4 December 2024)
- ML20214T760 + (05:23:34, 4 December 2024)
- ML20214T753 + (05:23:35, 4 December 2024)
- ML20214T752 + (05:23:36, 4 December 2024)
- ML20214T750 + (05:23:37, 4 December 2024)
- ML20214T747 + (05:23:40, 4 December 2024)
- ML20214T744 + (05:23:41, 4 December 2024)
- B12539, Proposed Tech Specs,Authorizing Storage of Up to 10 Consolidated Spent Fuel Assemblies in Spent Fuel Pool + (05:23:42, 4 December 2024)
- ML20214T743 + (05:23:42, 4 December 2024)
- ML20214T739 + (05:23:43, 4 December 2024)
- 05000285/LER-1987-016, :on 870504 & 05,discovered That Surveillance Test ST-FP-10,scheduled for 861111 Not Performed.Caused by Inadequate Responsibility Assignment.Procedure Change Incorporated Into ST-FP-10 + (05:23:45, 4 December 2024)
- ML20214T736 + (05:23:46, 4 December 2024)
- ML20214T737 + (05:23:46, 4 December 2024)
- ML20214T734 + (05:23:47, 4 December 2024)
- ML20214T730 + (05:23:47, 4 December 2024)
- ML20214T728 + (05:23:48, 4 December 2024)
- ML20214T727 + (05:23:49, 4 December 2024)
- ML20214T723 + (05:23:50, 4 December 2024)
- ML20214T725 + (05:23:50, 4 December 2024)
- ML20214T722 + (05:23:51, 4 December 2024)
- 0CAN058703, Responds to Violation B Noted in Insp Repts 50-313/87-08 & 50-368/87-08.Corrective Actions:Programmatic Approach to Resolution of Inconsistencies in Indicated Status of Valves Underway.Addl Time Required for Response to Violation a + (05:23:52, 4 December 2024)
- 05000334/LER-1987-010, :on 870504,discovered That Control Room Chlorine Detection Sys Incapable of Drawing Sample Flow from Intake Air Duct.Caused by Inadequate Acceptance Testing of Design Change.Testing Requirements Upgraded + (05:23:53, 4 December 2024)
- ML20214T717 + (05:23:54, 4 December 2024)
- ML20214T716 + (05:23:55, 4 December 2024)
- ML20214T715 + (05:23:55, 4 December 2024)
- ML20214T711 + (05:23:56, 4 December 2024)
- ML20214T710 + (05:23:56, 4 December 2024)
- ML20214T707 + (05:23:57, 4 December 2024)
- 05000295/LER-1987-010-06, :on 870504,discovered That No Filters Saved from Two Gas Decay Tank Releases in Violation of Tech Spec 4.12.Caused by Inadequate Communication Between Chemistry Supervisors & Technicians.Procedures Changed + (05:23:59, 4 December 2024)
- ML20214T703 + (05:23:59, 4 December 2024)
- TXX-6472, Responds to NRC Re Violations Noted in Insp Repts 50-445/86-26 & 5-446/86-22.Corrective Actions:Nonconformance Repts Written to Document Specific Welder Qualification Deficiencies & Corrective Action Request Issued + (05:24:00, 4 December 2024)
- ML20214T700 + (05:24:01, 4 December 2024)
- ML20214T695 + (05:24:02, 4 December 2024)
- ML20214T694 + (05:24:02, 4 December 2024)
- ML20214T692 + (05:24:03, 4 December 2024)
- ML20214T693 + (05:24:03, 4 December 2024)