Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- TXX-6467, Interim Deficiency Rept CP-86-10 Re Electrical Penetration Assemblies Supplied by Bunker Ramo.Initially Reported on 860424.EPA Modules Replaced by Modules Supplied by Conax. Unit 1 Completion Expected by 870730 & Unit 2 by 871130 + (05:21:18, 4 December 2024)
- 05000219/LER-1986-023, :on 861030,single Failure of Either 125-V Dc Panel D or F Rendered Automatic Initiation of Both Spray Containment Sys Inoperable.Caused by Design Error.Amend Will Be Submitted to Remove Automatic Start Feature + (05:21:23, 4 December 2024)
- SNRC-1330, Forwards Proposed Change to Licensed Operator Requalification Program Schedule to Reflect Use of Plant Simulator in Second Half 1987 Requalification Program (During Modules 87-6 & 87-7).Fee Paid + (05:21:24, 4 December 2024)
- ML20214U056 + (05:21:24, 4 December 2024)
- ML20214U055 + (05:21:25, 4 December 2024)
- ML20214U054 + (05:21:26, 4 December 2024)
- ML20214U053 + (05:21:26, 4 December 2024)
- ML20214U052 + (05:21:27, 4 December 2024)
- ML20214U051 + (05:21:27, 4 December 2024)
- ML20214U049 + (05:21:28, 4 December 2024)
- ML20214U047 + (05:21:29, 4 December 2024)
- ML20214U046 + (05:21:29, 4 December 2024)
- ML20214U039 + (05:21:30, 4 December 2024)
- ML20214U040 + (05:21:30, 4 December 2024)
- ML20214U038 + (05:21:31, 4 December 2024)
- 05000327/LER-1987-021, :on 870417,inoperable Fire Barrier Not Brought to Attention of Shift Engineer for One Day in Violation of Tech Spec.Caused by Personnel Error.Continuous Fire Watch Established.Training Session Will Be Modified + (05:21:33, 4 December 2024)
- IR 05000312/1986032 + (05:21:35, 4 December 2024)
- ML20214U034 + (05:21:35, 4 December 2024)
- ML20214U030 + (05:21:36, 4 December 2024)
- ML20214U029 + (05:21:37, 4 December 2024)
- ML20214U028 + (05:21:37, 4 December 2024)
- ML20214U027 + (05:21:38, 4 December 2024)
- ML20214U026 + (05:21:38, 4 December 2024)
- 05000395/LER-1987-010, :on 870512,svc Water Screen Pump Failed to Start During ESF Loading Sequencer (Esfls) Testing.Caused by Defective Lug Crimp on Internal Vendor Wiring in Esfls Panel.Internal Wiring of Esfls Panels Reworked + (05:21:40, 4 December 2024)
- ML20214U020 + (05:21:41, 4 December 2024)
- ML20214U019 + (05:21:41, 4 December 2024)
- ML20214U017 + (05:21:42, 4 December 2024)
- ML20214U015 + (05:21:42, 4 December 2024)
- ML20214U012 + (05:21:43, 4 December 2024)
- ML20214U009 + (05:21:44, 4 December 2024)
- ML20214U005 + (05:21:45, 4 December 2024)
- ML20214U007 + (05:21:45, 4 December 2024)
- ML20214U004 + (05:21:46, 4 December 2024)
- ML20214U001 + (05:21:47, 4 December 2024)
- ML20214U002 + (05:21:47, 4 December 2024)
- BSEP-86-1657, Responds to Violations Noted in Insp Repts 50-324/86-25 & 50-325/86-24.Corrective Actions:Auxiliary Operator Involved Counseled to Ensure Understanding of Mandatory Procedure Compliance & Operating Procedure 39 Revised + (05:21:48, 4 December 2024)
- ML20214T998 + (05:21:49, 4 December 2024)
- ML20214T995 + (05:21:50, 4 December 2024)
- ML20214T994 + (05:21:50, 4 December 2024)
- ML20214T991 + (05:21:51, 4 December 2024)
- IR 05000263/1986009 + (05:21:52, 4 December 2024)
- ML20214T989 + (05:21:52, 4 December 2024)
- ML20214T986 + (05:21:53, 4 December 2024)
- 05000255/LER-1986-033, :on 860825,discovered That LPSI Pump P-67B Flow Did Not Meet FSAR Specs.Caused by Impeller Installed in Pump in 1983.Impeller Replaced.Performance Tests Indicate That Pump Now Satisfies FSAR Specs + (05:21:55, 4 December 2024)
- ML20214T981 + (05:21:55, 4 December 2024)
- ML20214T978 + (05:21:56, 4 December 2024)
- ML20214T976 + (05:21:57, 4 December 2024)
- ML20214T977 + (05:21:57, 4 December 2024)
- ML20214T974 + (05:21:58, 4 December 2024)
- ML20214T972 + (05:21:58, 4 December 2024)
- ML20214T971 + (05:21:59, 4 December 2024)
- ML20214T966 + (05:22:01, 4 December 2024)