Forwards Safety Evaluation Re Util 870112 Proposed Plans to Inspect Two Overlay Repaired Core Spray safe-ends in Lieu of Replacement During Upcoming 1987 Refueling Outage.Plans Acceptable,Providing That Insp Results Satisfactory
ML20214T981
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 05/28/1987
From: Rooney V
Office of Nuclear Reactor Regulation
To: Capstick R
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML20214T984 List:
References
NUDOCS 8706100506
Download: ML20214T981 (2)


Text

__ _

T MAY 8 s Igg 7 Docket No.: 50-271 Mr. R. W. Capstick Licensing Engineer Vermont Yankee Nuclear Power Corporation 1617 Worcester Road Framingham, Massachusetts 01701

Dear Mr. Capstick:

Subject:

CORE SPRAY SAFE - END INSPECTION Re: Vermont Yankee Nuclear Power Station By letter dated lanuary 12, 1987, Vermont Yankee Nuclear Power Corporation (VYNPC) infonred us of their plans to inspect the two overlay repaired core spray safe-ends instead of replacing them during the upcoming 1987 refueling outage. We have reviewed VYNPC's analysis and proposed plans. We find VYNPC's proposed plan to inspect the repaired safe-ends, instead of replace them, acceptable for the next fuel cycle, providing that inspection results are satisfactory.

By letter dated May 7,1987, VYNPC provided us with inspection plans for the core spray safe-ends. We also reouest that the results of the inspection be provided to us as soon as possible, but no later than three weeks after plant startup following the 1987 refueling outage.

A copy of our Safety Evaluation is enclosed.

Sincerely,

/d Vernon L. Rooney, Project Manager Project Directorate I-3 Division of Reactor Projects I/II

Enclosure:

As stated cc w/ encl: See next page DISTRIBUTION:

Docket File local PDR NRC PDR FRushbrook VNerses PDI-3 Reading 0GC-Bethesda ACPS(10)

BBoger SVarga EJordan JPartlow

  • SEE PREVIOUS CONCURRENCE I

PDI-3/DRPI/II PDI-3/DRPI/II PpI)J(pRPI/II

  • MRushbrook/ rad *VRooney M Vries 05/ /87 05/ /87 05/,26/87 8706100506 870528 PDR ADOCK 05000271 q PDR

Mr. R. W. Capstick Vermont Yankee Nuclear Power Corporation Vemmont Yankee Nuclear Power Station CC:

Mr. W. G. Weigand W. P. Murphy, Vice President President & Chief Executive Officer and Manager of Operations Vermont Yankee Nuclear Power Corp. Vemont Yankee Nuclear Power Corp.

R.D. 5, Box 169 R.D. 5, Box 169 Ferry Road Ferry Road Brattleboro, Vermont 05301 Brattleboro, Vermont 05301 Mr. Donald Hunter, Vice President Mr. Gerald Tarrant, Comissioner Vermont Yankee Nuclear Power Corp. Vemont Department of Public Service 1671 Worcester Road 120 State Street Framingham, Massachusetts 01701 Montpelier, Vermont 05602 New England Coalition on Nuclear Public Service Board Pollution State of Vermont Hill and Dale Fam 120 State Street R.D. 2, Boy 223 Montpelier, Yement 05602 Putney, Vemont 05346 Mr. Walter Zaluzny Vemont Yankee Decomissioning Chaiman, Board of Selectman Alliance Post Office Box 116 Box 53 Vernen, Vement 05354 Montpelier, Yemont 05602-0053 J. P. Pelletier, Plant Manager Resident Inspector Vemont Yankee Nuclear Power Corp. U.S. Nuclear Regulatory Comission Post Office Box 157 Post Office Box 176 Vernon, Vermont 05354 Vernon, Vemont 05354 Raymond N. McCandless Vemont Public Interest Research Vermont Division of Occupational Group, Inc.

and Radiological Health 43 State Street Administration Building Montpelier, Vemont 05602 10 Baldwin Street Montpelier, Vemont 05602 Acting Regional Administrator Region I Office Honorable John J. Easton U.S. Nuclear Regulatory Comission Attorney General 631 Park Avenue State of Vermont King of Prussia, Pennsylvania 19406 109 State Street Montpelier, Vermont 05602 Mr. R. W. Capstick Vemont Yankee Nuclear John A. Ritscher, Esquire Power Corporation Ropes & Gray 1671 Worcester Road 225 Franklin Street Framingham, Massachusetts 01701 Boston, Massachusetts 02110