ML20214U007

From kanterella
Jump to navigation Jump to search

Identifies Listed Discrepancies Between FSAR (Up to Amend 17) & Tech Specs,Including FSAR Equations for Overtemp Delta Temp & Overpower Delta Temp Conflicting W/Tech Specs Table 2.2-1,Notes 1 & 3.Discrepancies Need to Be Corrected
ML20214U007
Person / Time
Site: Beaver Valley
Issue date: 06/04/1987
From: Tam P
Office of Nuclear Reactor Regulation
To: Carey J
DUQUESNE LIGHT CO.
References
TAC-65288, NUDOCS 8706110003
Download: ML20214U007 (2)


Text

_

s June 4, 1987 Docket No. 50-412 Mr. J. J. Carey, Senior Vice President Duquesne Light Company Nuclear Group Post Office Box 4 Shippingport, Pennsylvania 15077

Dear Mr. Carey:

SUBJECT:

BEAVER VALLEY UNIT 2 - DISCREPANCIES BETWEEN THE TECHNICAL SPECIFICATIONS AND THE FSAR (TAC #65288)

Comparison of the FSAR (up to Amendment No. 17) and the Technical Specifications reveals the following discrepancies:

FSAR equations for Overtemperature AT (see page 7.2-4), and Overpower AT (see page 7.2-6) conflict with Table 2.2-1, Note I and Note 3, of the Technical Specifications.

We call these discrepancies to your attention so they can be corrected in your next FSAR Amendment.

The reporting /recordkeeping requirement of this request affects fewer than ten respondents; therefore, OMB clearance is not required under P.L. 96-J11.

Sincerely,

/s/

Peter S. Tam, Project Manager Project Directorate I 4 Division of Reactor Projects I/II DISTRIBUTION Docket F11e7 NRC & Local PDRs PDI-4 Reading S. Varga B. Boger S. Norris P. Tam OGC-Bethesda E. Jordan J. Partlow ACRJ (10)

[ Gray File)

LA PDI-4 P

C PTam;sk SN JS FB rows 6/J /87 6/3 /87 6/j /

7 B706110003 870604 PDR ADOCK 05000412 A

PDR

e Mr. J. J. Carey Duquesne Light Company Beaver Valley 2 Power. Station cc:

Gerald Charnoff, Esq.

Mr. R. E. Martin, Manager Jay E. Silberg, Esq.

Regulatory Affairs Shaw, Pittman, Potts & Trowbridge Duquesne Light Company 2300 N Street, N.W.

Beaver Valley Two Project Washington, DC 20037 P. O. Bcx 328 l

Shippingport, Pennsylvania 15077 Mr. C. W. Ewing, Quality Assurance Pennsylvania Office of Consumer Manager Advocate i

Quality Assurance Department ATTN: Michael Bardee Duquesne Light Company 1425 Strawberry Square P. O. Box 186 Harrisburg, Pennsylvania 17120 1

i Shippingport, Pennsylvania 15077 John D. Burrows, P.E.

Director, Pennsylvanis Emergency Director of Utilities Management Agency State of Ohio Room B-151 Public Utilities Commission Transportation & Safety Building 180 East Broad Street

-Harrisburg, Pennsylvania 17120 Columbus, Ohio 43266-0573 Mr. T. J. Lex Bureau of Radiation Protection Westinghcuse Electric Corpcration PA Department of Environmental Power Systems Resources P. O. Box 355 ATTN:

R. Janati i

Pittsburgh, Pennsylvania 15230 P.O. Box 2063 Harrisburg, Pennsylvania 17120 Stone & Webster Engineering Corporation BVPS-2 Records Management Supervisor P. O. Box 2325 Duquesne Light Company Boston, Massachusetts 02107 Post Office Box 4 Shippingport, Pennsylvania 15077 Mr. J. Beall U. S. NRC John A. Lee, Esq.

j P. O. 181 Duquesne Light Company 1

Shippingport, Pennsylvania 15077 1 0xford Centre 301 Grant Street Regional Administrator, Region I Pittsburgh, Pennsylvania 15279 i

U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 1

1 1

+

i

. _. _,, _ _....