Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215G598 + (03:21:37, 4 December 2024)
- ML20215G597 + (03:21:37, 4 December 2024)
- ML20215G594 + (03:21:38, 4 December 2024)
- ML20215G591 + (03:21:39, 4 December 2024)
- IR 05000382/1986015 + (03:21:40, 4 December 2024)
- ML20215G586 + (03:21:41, 4 December 2024)
- ML20215G584 + (03:21:41, 4 December 2024)
- IR 05000454/1987021 + (03:21:43, 4 December 2024)
- ML20215G569 + (03:21:44, 4 December 2024)
- ML20215G567 + (03:21:45, 4 December 2024)
- ML20215G562 + (03:21:47, 4 December 2024)
- ML20215G560 + (03:21:48, 4 December 2024)
- ML20215G555 + (03:21:49, 4 December 2024)
- ML20215G557 + (03:21:49, 4 December 2024)
- ML20215G554 + (03:21:50, 4 December 2024)
- ML20215G552 + (03:21:51, 4 December 2024)
- ML20215G550 + (03:21:51, 4 December 2024)
- ML20215G549 + (03:21:52, 4 December 2024)
- ML20215G547 + (03:21:53, 4 December 2024)
- ML20215G546 + (03:21:53, 4 December 2024)
- ML20215G543 + (03:21:54, 4 December 2024)
- ML20215G544 + (03:21:54, 4 December 2024)
- ML20215G539 + (03:21:58, 4 December 2024)
- ML20215G535 + (03:21:58, 4 December 2024)
- ML20215G534 + (03:21:59, 4 December 2024)
- ML20215G533 + (03:21:59, 4 December 2024)
- IR 05000412/1987019 + (03:22:01, 4 December 2024)
- ST-HL-AE-2077, Forwards Revised FSAR Section 3.8.1.4, Design & Analysis Procedures (Concrete Containment), to Incorporate Editorial Corrections & Clarifications of Basis of Initial Compressive Stress + (03:22:01, 4 December 2024)
- ML20215G526 + (03:22:02, 4 December 2024)
- ML20215G522 + (03:22:03, 4 December 2024)
- ML20215G519 + (03:22:03, 4 December 2024)
- ML20215G506 + (03:22:05, 4 December 2024)
- ML20215G501 + (03:22:06, 4 December 2024)
- ML20215G499 + (03:22:07, 4 December 2024)
- ML20215G497 + (03:22:08, 4 December 2024)
- ML20215G498 + (03:22:08, 4 December 2024)
- ML20215G492 + (03:22:09, 4 December 2024)
- ML20215G495 + (03:22:09, 4 December 2024)
- IR 05000440/1987010 + (03:22:10, 4 December 2024)
- ML20215G488 + (03:22:11, 4 December 2024)
- ST-HL-AE-2062, Forwards FSAR Revs for Sections 7.4.1,10.4.9,App 10A,Tables 10.4-3,7.3-15 & Figure 6.2.4-1 Re Starting Turbine Driven Auxiliary Feedwater Pump W/Trip & Throttle Valve,Not Steam Inlet Valve as Previously Indicated + (03:22:11, 4 December 2024)
- ML20215G486 + (03:22:12, 4 December 2024)
- ML20215G487 + (03:22:12, 4 December 2024)
- ML20215G484 + (03:22:13, 4 December 2024)
- ML20215G482 + (03:22:14, 4 December 2024)
- 3F1086-09, Forwards BAW-1976, Small Break LOCA for B&W 177FA Lowered Loop Plant in Response to NUREG-0737,Item II.K.3.31 + (03:22:15, 4 December 2024)
- ST-HL-AE-2074, Forwards General Revs to FSAR Section 15.0, Accident Analysis, Incorporating Editorial Corrections & Minor Technical Clarifications & Changing Figures 15.0-10,13,14,15 & 19.Conclusions Previously Reached in SER Remain Valid + (03:22:16, 4 December 2024)
- ML20215G476 + (03:22:16, 4 December 2024)
- 05000295/LER-1986-036, :on 860922,discovered That Snubber Had Not Been Declared Inoperable at Time of Removal & Not Reinstalled within 72 H Limit.Caused by Procedural Error.List of safety- Related Snubbers Required Operable Compiled + (03:22:19, 4 December 2024)
- NRC-87-3216, Forwards Proprietary Vol 2 to WCAP-10924, Westinghouse Large-Break LOCA Best-Estimate Methodology:Application to Two-Loop PWRs Equipped W/Upper Plenum Injection, to Support Early 1988 Facility Startup.Rept Withheld (Ref 10CFR9.5(4)) + (03:22:20, 4 December 2024)
- ML20215G472 + (03:22:20, 4 December 2024)
- ML20215G469 + (03:22:21, 4 December 2024)