. OPERATIONS SUPMARY SEPTEMBER, 1986 The unit entered September at 100% Reactor power producing approximately 830 MWe gross electrical generation. On September 13, 1986 at 0800 hours0.00926 days <br />0.222 hours <br />0.00132 weeks <br />3.044e-4 months <br /> Reactor power was reduced to 60%. The APSRs (axial power shaping rods) were removed from the core to provide extended core life.

On the return power escalation Turbine Valve Testing was successfully completed at 85% Reactor power. On September 14,1986 at 0200 Reactor power was returned to 100% The plant then continued to operate at 100% power the remainder of the month.

MAJOR SAFETY RELATED MAINTENANCE During the month of September, THI-1 performed the following major maintenance:

Air Handling System Purge Valve AH-V-1B - During preparation for ES testing it was discovered AH-Y-1B would not stroke.

Investigation revealed damage to the motor operator pinion gear and shaf t clutch gear.

The gears were replaced and the valve satisfactorily tested.

Testing included Local Leak Rate Test (LLRT), stroke test, and 30* open checks. All work is complete.

gcp I

I

~

p.-.

OPERATING DATA REPORT DOCKET NO.

50-289 DATE 09/30/86 COMPLETED BY C.W. Smyth-TELEPHONE (717) 948-8551 OPERATING STATUS NOTES

1. UNIT NAME:

THREE MILE ISLAND UNIT 1

2. REPORTING PERIOD:

SEPT

,1986.

3. LICENSED THERMAL POWER (MWT) :

2535.

4. NAMEPLATE RATING (GROSS MWE) :

871.

5. DESIGN ELECTRICAL RATING (NET MWE) :

819.

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) :

824.

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE) :

776.

8. IF CHANGES OCCUR IN (ITEMS 3-7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

THIS MONTH YR-TO-DATE CUMMULATIVE

11. HOURS IN REPORTING PERIOD 720.

6551.

105888.

12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 5525.7 39342.3
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 990.8 1874.1
14. HOURS GENERATOR ON-LINE 720.0 5469.6 38503.5
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1813032.

13706035.

93056432.

17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 593506.

4510088.

30902241.

18. NET-ELECTRICAL ENERGY GENERATED (MWH) 559739.

4236848.

28888560.

19. UNIT SERVICE FACTOR 100.0 83.5 36.4
20. UNIT AVAILABILITY FACTOR 100.0 83.5 36.4
21. UNIT CAPACITY FACTOR (USING MDC NET) 100.2 83.3 34.9
22. UNIT CAPACITY FACTOR (USING DER NET) 94.9 79.0 33.3
23. UNIT FORCED OUTAGE RATE 0.0 4.5 60.6
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH Refuelinq Outaqe. November 1, 1936 - 4 to 5 months
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

=

. =..-

.gai.,; g..~-;-._r.:w.

..--.-p_-

,.. ~.-

,.g..

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-289 i

-UNIT

.TMI-1

~

DATE 09/30/86 COMPLETED BY C.W. Smyth TELEPHONE (717) 948-8551 MONTH:

SEPT DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)

(MWE-NET) 1 785.

17 794.

2 785.

18 791.

3 781.

19 787.

4 780.

20 783.

5 777.

21 781.

6 779.

22 783.

7 785.-

23 776.

8 789.

24 774.

9 788.

25 777.

I 10 785.

26 774.

11 776.

27 776.

12 774..

28 784.

13

658, 29 777.

14 782.

30 769.

15 786.

31 N/A 16 786.

h t

i.

50-289 DOCKET NO.

UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME TMI-I DATE 09-30-86 i

SEPTEMBER COMPLETED BY C.W. Smyth REPORT MONTH TELEPHONE (7171948-8551 i

i w.

c, re 3 seE '4 L icensee g-7, g4 Cause & Corrective Ee E

7 Date S.

5?

4 2sE Event s?

q Aceite to

$E E

jgg Report a

<E C Prevent Recurrence 6

1 9/13/86 S

17 H

I N/A RB Ccnrod Reduced power to 60% FP to withdraw Axial Power Shaping Rods.

2 9/13/86 S

1 B

1 N/A HB Valvex,D Held at 85% FP for turbine stop valve testing.

I 2

3 4

F Fos ted Reasim:

Method:

Exlubit G-Instructiims.

S Ss heduled A-Fquipment FailureILxplain) 1-Manual for Preparaison ol' Data B-Maintenanceof Tes 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 1-Autunuine Scram.

Event Repini ILE RI File INUREG-D-Regulatory Restricium 40tlwr Iliptaml O t t>l l 1 -Operator Training & I sunw I ununatum F-AJnumst rat r,c 5

E stubai I - Sanw Source G Operangonal 1: rus IITplaint ll Other IE splain t 6

Actually used Exhibits F & 11 UUREC 0161

REFUELING IWORMATION PEQUEST 1.

Name of Facility: Three Mile Island Nuclear Station, Unit 1 2.

Scheduled date for next refueling shutdown:

November 1,1986 3.

Scheduled date for restart following refueling:

March 20, 1987 4.

Will refueling or resumption of operation thereaf ter require a technical specification change or other license amendment?

Yes If answer is yes, in general, what will these be?

Conversion to 18 month fuel cycle with associated changes to Power Imbalance, Quadrant Tilt and Rod Insertion Limits.

If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref.10 CFR Section 50.59)?

No If no such review has taken place, when is it scheduled?

To be determined.

5.

Scheduled date(s) for submitting proposed licensing action and supporting i nformation:

November,1986 6.

Important licensing considerations associated with refueling, e.g. new or different fuel design or supplier, unreviewed design or performanco analysis methods, significant changes in fuel design, new operating procedures:

None 7

The number of fuel assemblies (a) in the core, and (b) in the spent fuel storage pool:

(a) 177 (b) 208 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The present licensed capacity is 752.

There are no planned increases at this time, 9.

The projected date of the last refueling that can be discharged to the i

spent fuel pool assuming the present licensed capacity:

1991 is the last refueling discharge which allows full core off-load capacity (177 fuel assemblies).

l l

l

1 U

e GPU Nuclear Corporation NggIgf Post Office Box 480 Route 441 South Middletown, Pennsylvania 17057 0191 717 944 7621 1

TELEX 84 2386 Writer's Direct Dial Number:

October 13, 1986 s

5211-86-2179 Director, Office of Inspection and Eittorcement U. S. Nuclear Regulatory Commission i

Washington, D.C. 20555 Attn: Document Control Desk

Dear Sir:

Three Mile Island Nuclear Station, Unit I (TMI-1)

Operating License No. DPR-50 Docket No. 50-289 Monthly Operating Report September,1986 Enclosed please find two (2) copies of the September,1986 Monthly Operating Report for Three Mile Island Nuclear Station, Unit-1.

i Sincerely,

l. D.

u ill Vice President & Director, THI-l HDH:DVH:spb cc: Dr. T. E. Murley Attachments 0015C ffII GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation

.