ML20215G526
From kanterella
Jump to navigation
Jump to search
Similar Documents at Diablo Canyon | |
---|---|
Category:MEETING MINUTES & NOTES--CORRESPONDENCE
MONTHYEARML20129J5741996-11-0505 November 1996
[Table view]Trip Rept of 961001-03 Visit to Omega Point Labs in San Antonio,Tx to Witness Three Fire Endurance Tests Conducted for PG&E ML20035B4531993-03-18018 March 1993 Summary of Operator Reactors Events Briefing 93-10 on 930317.List of Attendees Encl ML20245F9261989-08-0707 August 1989 Summary of 890613-15 Meetings W/Util in San Francisco,Ca Re PRA long-term Seismic Program.List of Attendees & Agenda Encl ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML20246N9201989-03-16016 March 1989 Summary of Operating Reactors Events Meeting 89-010 on 890308.List of Attendees,Significant Events Identified for Input to NRC Performance Indicator Program & Summary of Reactor Scrams for Wk Ending 890305 Encl ML20205H7521988-10-18018 October 1988 Summary of Operating Reactors Events Meeting 88-41 on 881018.No Significant Events Identified for Input to NRC Performance Indicator Program ML20151D3481988-04-0707 April 1988 Summary of ACRS Subcommittee on Diablo Canyon Meeting on 880223-24 in Burlingame,Ca Re Review of Diablo Canyon Long Term Seismic Program ML20148H6621988-01-15015 January 1988 Summary of Operating Reactors Events Meeting 88-02 on 880112 Re Events Which Occurred Since Last Meeting on 880105.List of Attendees,Significant Elements of Events & Tabulation of long-term Followup Assignments to Be Completed Encl ML20148H6031987-12-15015 December 1987 Summary of ACRS DHR Sys Subcommittee 871117 Meeting in Washington,Dc Re Util Decision Not to Install Dedicated Blowdown Sys at Davis Besse & Implications of Diablo Canyon Loss of Shutdown Cooling Event.Viewgraphs Encl ML20245C2601987-08-0707 August 1987 Summary of CRGR Meeting 116 on 870610 Re Final Rule Amends to 10CFR30,40,50,51,70 & 72 Concerning Requirements for Decommissioning Facility.List of Attendees Encl ML20195G3651987-08-0707 August 1987 Summary of CRGR Meeting 116 on 870610 Re Final Rule Amends to 10CFR30,40,50,51,70 & 72 Concerning Requirements for Decommissioning Facility.List of Attendees Encl ML20215C8721987-06-0808 June 1987 Summary of Operating Reactors Events Meeting 87-10 on 870406 Re Events Which Occurred Since 870330 Meeting.List of Attendees,Events Discussed & Significant Elements of Events & Summary of Reactor Scrams & Significant Events Encl ML20214P6121987-05-27027 May 1987 Summary of Operating Reactors Events Meeting 87-14 on 870512 W/Nrr,Res,Aeod & Regional Ofcs Re Events Which Occurred Since 870507 Meeting.List of Attendees & Viewgraphs Encl ML20215L3281987-05-0505 May 1987 Summary of Operating Reactors Events Meeting 87-11 on 870420.List of Attendees,Viewgraphs & Input to NRC Performance Indicator Program Encl ML20210T4031987-01-28028 January 1987 Summary of Operating Reactors Events Meeting 87-02 on 870112 of Events Which Occurred Since 870105.List of Attendees,Events Discussed & Summary of Events Encl ML20210T3641987-01-16016 January 1987 Summary of Operating Reactors Events Meeting 87-02 on 870112 Re Events Which Occurred Since 870105.List of Attendees,Events Discussed & Summary of Events Encl ML20205K7591986-12-31031 December 1986 Summary of ACRS 320th Meeting on 861211-13 in Washington,Dc Re New Requirements for BWR Mark I Containments in Regard to Severe Accidents & Proposal for Commission Policy Statement on Deferred Plants (SECY-86-359) ML20211Q6161986-07-23023 July 1986 Summary of Operating Reactor Events Meeting 86-25 on 860721 Re Events Since 860714 Meeting.List of Attendees,Discussion of Events & Status of Assignments Encl.Response Requested for Incomplete Assignments ML20211P1361986-07-16016 July 1986 Summary of 860707 Operating Reactor Events Meeting 86-23 W/ Div Directors & Representatives Re Events Since Last Meeting on 860630.Notification of Inability to Meet Assigned Target Completion Dates for Actions Requested.Viewgraphs Encl ML20206J6561986-06-23023 June 1986 Trip Rept of 860612 Training Session in Lacey,Wa Re Federal Radiological Emergency Response Plans & Meeting W/Utils & State of Wa Concerning Potential Emergency Preparedness Issues.Attendees Listed & Training Agenda Encl ML20141F4091986-04-10010 April 1986 Summary of Operating Reactors Events Meeting 86-10 W/Ofc Director,Div Directors & Representatives Re Events Since 860324.Viewgraphs & Supporting Documentation Encl ML20210J0261986-03-24024 March 1986 Summary of Operating Reactor Events Meeting 86-08 on 860317 to Discuss Events Occurring Since Last Meeting on 860310 ML20214E6961986-03-14014 March 1986 Summary of Allegation Review Board 860313 Meeting Re Disposition of Listed Items,Including Case 5-85-042, Allegation 1717 Re Discrimination Against Former Document QA Reviewer for Pullman Power Products ML20154N8751986-03-12012 March 1986 Summary of Operating Reactor Events 860310 Meeting 86-07 W/Ornl Re Events Occurring Since 860303 Meeting.Followup Review Assignments,Status of Previous Assignments,List of Attendees & Viewgraphs Encl ML20141F0461985-12-30030 December 1985 Summary of Operating Reactors Events Meeting 85-28 on 851223.List of Attendees & Viewgraphs Encl ML20138M9281985-12-12012 December 1985 Summary of Operating Reactor Events Meeting 85-25 on 851202 Re Listed Events.Attendee List,Summary of Events Discussed & Viewgraphs Encl ML20134L0291985-07-30030 July 1985 Summary of ACRS Subcommittee on Diablo Canyon 850710 Meeting W/Pg&E in Washington,Dc Re NRC Evaluation of Util long-range Seismic Program for Plant.Fr Notice,Meeting Agenda & List of Handouts Encl ML20127E1361985-05-25025 May 1985 Trip Rept of ACRS Subcommittees on Extreme External Phenomena & Diablo Canyon 850321-22 Meetings in Los Angeles,Ca Re NRC Seismic Margins Program & Long-Term Seismic Program of Diablo Canyon Power Plant ML20128L6941985-05-24024 May 1985 Summary of ACRS Subcommittees on Extreme External Phenomena & Diablo Canyon Units 1 & 2 840524 Meeting in Los Angeles,Ca Re Chairman Palladino 840413 Request for Comments on Technical Paper Which Recharacterizes Hosgri Fault ML20209D8361985-01-0707 January 1985 Summary of 841211 Meeting W/Util,Plg,Risk Engineers,Inc, Westinghouse,Cac & SMA in Bethesda,Md Re Reevaluation Program of Seismic Design Basis.Viewgraphs Encl ML20209D7061984-12-0707 December 1984 Summary of 841115 & 16 Meetings W/Util in Bethesda,Md Re Elements 2 & 3 of Seismic Reevaluation Program ML20209D4431984-10-17017 October 1984 Summary of 841004 Meeting W/Util in Bethesda,Md Re Geology & Tectonics of Site.Attendance List & Viewgraphs Encl.W/O Encls ML20209D3321984-09-21021 September 1984 Trip Rept of 840816-22 Visits to Lasl & Plant Re DHR & Unresolved Safety Issue A-45 ML20209C9211984-09-21021 September 1984 Summary of 830913 Meeting W/Util in Bethesda,Md Re Facility. Internal Review & QA Programs,Allegations,Design Activities & Schedules Addressed.Meeting Notification,List of Attendees,Viewgraphs & Related Info Encl ML20210E6611984-08-22022 August 1984 Summary of 840424 Meeting W/R Kranzdorf,M Mcgee,D Jeter & J Carsel in San Luis Obispo,Ca Re Roles of Federal,State & Local Agencies in Development of Emergency Plans.Allegation Task 80 Closed.Supporting Documentation Encl ML20215G5261983-12-22022 December 1983 Summary of 831222 Meeting Re Clarification of Lockert Termination & Subsequent Grievance Which Originally Presented & Denied by Pullman Power Products on 831219. Attendee List Encl.Partially Withheld Related Info Encl ML20215G5011983-12-19019 December 1983 Summary of 831219 Meeting Re Submittal of Grievance to Pullman Power Products Concerning Termination of Lockert, QA Inspector,On 831215.List of Attendees Encl ML20210E6861983-10-14014 October 1983 Summary of Review Panel 831012 Meeting Re Reinstatement of License.Knighton Aware of Licensee Request for Exemption from Requirements of 10CFR50,App R & Will Determine Required Licensee Action & Schedule.Related Info Encl ML20209C3391983-08-0808 August 1983 Trip Rept of Attendance at 830727 Meeting in San Francisco, CA Between Idvp & Util Re Status of Closure Efforts on Open Items in Idvp Final Rept.Projected Date for Issuance of Idvp Final Rept Suppl Is mid-Sept 1983 ML20209C3101983-07-25025 July 1983 Trip Rept of 830607 Visit to San Francisco,Ca to Observe Test Program Developed by Util & Bechtel.Program Was to Determine Statistically Spot Weld Capacity of Superstrut Matl Installed at Plant ML20209C2311983-06-30030 June 1983 Trip Rept of Attendance at 830512 Technical Interchange Meeting W/Util & Independent Verification Program Staff Re Containment & Turbine Bldgs & Control Room.Attendee List Encl ML20210B2461983-06-23023 June 1983 Trip Rept of 830608-10 Visit Re Idvp Technical Interchange Meetings W/Idvp Staff & Util/Bechtel Facility Project Staff ML20023D5711983-05-13013 May 1983 Trip Rept of 830406-07 Visit to Site & Bechtel Ofcs in San Francisco,Ca Re Insp of Technical Calculations Supporting Diablo Canyon Project Internal Technical Program ML20209C1171983-04-29029 April 1983 Trip Rept of 830425 Visit to Bechtel in Gaithersburg,Md to Review Grand Gulf Cable Tray Support Calculations for Use in Resolution of Allegation Concerning Superstrut Spot Welds at Diablo Canyon ML20209C1291983-04-27027 April 1983 Summarizes 830418 Meeting W/J Wermiel,A Vietti & B Buckley & J Smith Re Status of NRC Reevaluation of Component Cooling Water Sys.Comments Solicited from J Smith on Draft SER in Area of Surge Tank Level Instrumentation Seismic Design ML20209C0961983-04-20020 April 1983 Summary of 830408 Meeting W/Ofc of State of CA Atty General & Seismic Safety Commission & Representatives from Univs of Il & Tx in Los Angeles,Ca Re Assumptions Used in Deriving Facility Reanalysis Spectrum ML20209B9181983-02-18018 February 1983 Summary of 830204 Meeting W/Util,Teledyne Engineering Svc & Consultants in San Francisco,Ca Re Status of Analyses for Containment Annulus Steel Structure & Auxiliary Bldg Floor & Wall Loadings ML20209B9941983-02-14014 February 1983 Trip Rept of 830126 Meeting W/Rl Cloud & Assoc in Berkeley, CA to Clarify Items Re Interim Technical Rept (Itr) 12, Independent Design Verification Program (Idvp) - Piping & Itr 17, Idvp - Piping,Addl Samples ML20209B8411983-01-10010 January 1983 Trip Rept of 821202 Meeting W/Teledyne Engineering Svcs, Bechtel,Bnwl,Norton,Burke,Berry & French,Util,State of CA, Hhb & Urs/Blume to Discuss Listed Portions of Independent Design Verification Program 1996-11-05 Category:MEETING MINUTES-INTERNAL (NON-TRANSCRIPT) MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT) MONTHYEARML20215G5261983-12-22022 December 1983
[Table view]Summary of 831222 Meeting Re Clarification of Lockert Termination & Subsequent Grievance Which Originally Presented & Denied by Pullman Power Products on 831219. Attendee List Encl.Partially Withheld Related Info Encl ML20215G5011983-12-19019 December 1983 Summary of 831219 Meeting Re Submittal of Grievance to Pullman Power Products Concerning Termination of Lockert, QA Inspector,On 831215.List of Attendees Encl 1983-12-22 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20215G526&oldid=3976944"