Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215H447 + (03:14:47, 4 December 2024)
- ML20215H443 + (03:14:48, 4 December 2024)
- ML20215H446 + (03:14:48, 4 December 2024)
- PNO-V-87-029, on 870409,while Installing Reactor Stud Plugs, Release of Radioactivity Occurred Resulting in 21 Workers Experiencing Personal Contamination.Work in Reactor Cavity Stopped Until Source of Problem Identified + (03:14:49, 4 December 2024)
- ML20215H438 + (03:14:50, 4 December 2024)
- ML20215H439 + (03:14:50, 4 December 2024)
- ML20215H436 + (03:14:51, 4 December 2024)
- ML20215H435 + (03:14:52, 4 December 2024)
- ML20215H434 + (03:14:52, 4 December 2024)
- ML20215H425 + (03:14:54, 4 December 2024)
- ML20215H424 + (03:14:55, 4 December 2024)
- ML20215H419 + (03:14:56, 4 December 2024)
- ML20215H423 + (03:14:56, 4 December 2024)
- ML20215H418 + (03:14:57, 4 December 2024)
- 05000282/LER-1987-006-01, :on 870520,inadvertent Automatic Start of Auxiliary Feedwater Pump Occurred While Steam Generator 12 Being Drained in Preparation for Plugging One Tube.Caused by Personnel Error.Personnel Counseled + (03:14:59, 4 December 2024)
- ML20215H411 + (03:14:59, 4 December 2024)
- ML20215H407 + (03:15:00, 4 December 2024)
- ST-HL-AE-2059, Forwards Revised FSAR Section 6.2.2.5.2, Reactor Containment Fan Cooler, Reflecting Deletion of Vibration Sensing Equipment for Each Reactor Containment Fan Cooler Motor Assembly.Subj Equipment Deemed Unnecessary + (03:15:01, 4 December 2024)
- ML20215H405 + (03:15:01, 4 December 2024)
- PLA-2736, Forwards Response to IE Bulletin 85-003 Re motor-operated Valves,Per 860829 request.Motor-operated Valves in HPCI & RCIC Sys Requiring Testing for Operational Readiness Listed + (03:15:02, 4 December 2024)
- ML20215H403 + (03:15:03, 4 December 2024)
- ML20215H402 + (03:15:03, 4 December 2024)
- ML20215H399 + (03:15:04, 4 December 2024)
- ML20215H400 + (03:15:04, 4 December 2024)
- ML20215H397 + (03:15:05, 4 December 2024)
- ML20215H391 + (03:15:06, 4 December 2024)
- JAFP-86-0833, Forwards Suppl to Response to IE Bulletin 85-003, Motor- Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings, Per 860729 Request.Util Waiting for Sept 1986 BWR Owners Group Rept Re Valves + (03:15:07, 4 December 2024)
- ML20215H389 + (03:15:07, 4 December 2024)
- ML20215H388 + (03:15:08, 4 December 2024)
- ML20215H386 + (03:15:08, 4 December 2024)
- ML20215H385 + (03:15:09, 4 December 2024)
- ML20215H383 + (03:15:10, 4 December 2024)
- ML20215H382 + (03:15:11, 4 December 2024)
- ST-HL-AE-2050, Forwards Revised FSAR Section 9.2.1.1, Auxiliary Cooling Water Sys, Updating FSAR for Consistency W/Design Documents.Rev Does Not Affect SER Conclusions + (03:15:11, 4 December 2024)
- ML20215H379 + (03:15:12, 4 December 2024)
- ML20215H373 + (03:15:13, 4 December 2024)
- ML20215H369 + (03:15:14, 4 December 2024)
- ML20215H371 + (03:15:14, 4 December 2024)
- ML20215H366 + (03:15:15, 4 December 2024)
- ML20215H365 + (03:15:16, 4 December 2024)
- TXX-6023, Interim Deficiency Rept CP-86-37 Re Firing Board Assemblies & Amplifier Boards Used in Class 1E Battery Chargers Not Conforming to Vendor Assembly Drawings.Initially Reported on 860514.Next Rept Will Be Submitted on 861217 + (03:15:16, 4 December 2024)
- PY-CEI-NRR-0637, Monthly Operating Rept for Mar 1987 + (03:15:17, 4 December 2024)
- ML20215H362 + (03:15:17, 4 December 2024)
- ML20215H358 + (03:15:18, 4 December 2024)
- 05000413/LER-1987-013, :on 870316,manual Reactor Trip Occurred After Main Feedwater Control Valve Failed Closed.Cause Unknown. Control Circuit Components Replaced & Tested & Reactor Trip Response Procedure Revised + (03:15:20, 4 December 2024)
- ML20215H353 + (03:15:21, 4 December 2024)
- BECO-87-093, Notifies That Claim by M Teague Has Been Filed Against Util for Operation of Facility,Per 10CFR140.6.Legal Documents, Including Summons Encl + (03:15:25, 4 December 2024)
- ML20215H343 + (03:15:25, 4 December 2024)
- ML20215H341 + (03:15:26, 4 December 2024)
- ML20215H337 + (03:15:27, 4 December 2024)
- TXX-6530, Interim Deficiency Rept CP-86-71 Re Electrical Cable Pulling.Initially Reported on 861002.Calculation for Allowable Tension for Vertical Cable Pulls in Final Stages of Review.Next Report Will Be Submitted by 870821 + (03:15:28, 4 December 2024)