Forwards Physical Security Insp Repts 50-245/87-02, 50-336/87-02 & 50-423/87-03 on 870127-29 & Notice of Violation
ML20215H388
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 04/10/1987
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20215H393 List:
References
NUDOCS 8704200300
Download: ML20215H388 (2)


See also: IR 05000245/1987002

Text

'.

f

.

APR 10 1987

Docket Nos. 50-245

License Nos. DPR-21

50-336

DPR-65

50-423

NPF-49

Northeast Nuclear Energy Company

ATTN: Mr. E. J. Mroczka

Senior Vice President - Nuclear

Engineering and Operations Group

P. O. Box 270

Hartford, Connecticut 06141-0270

Gentlemen:

Subject: Combined Inspection Nos. 50-245/87-02, 50-336/87-02 and

50-423/87-03

This refers to the routine physical security inspection conducted by

Mr. W. Madden of this office on January 27 and January 29, 1987 at Millstone

Nuclear Power Station, Waterford, Connecticut, and at the Northeast Utilities

Service Company Offices in Berlin, Connecticut, of activities authorized by NRC

License Nos. DPR-21, DPR-65 and NPF-49 and to the discussions of our findings

held by Mr. Madden with Mr. N. Tasker, Director, Systems Security of your staff

at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in the

Notice of Violation, enclosed herewith as Appendix A.

This violation has been

categorized by severity level in accordance with the " General Statement of

Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C

(Enforcement Policy). You are required to respond to'this letter and in

preparing your response, you should follow the instructions in Appendix A.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures

will be placed in the NRC Public Document Room.

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget

as required by the Paperwork Reduction Act of 1980, PL 96-511.

t

G

OFFICIAL RECORD COPY

CIR MILL 87/02 - 0001.0.0

03/31/87

l

gg

l

Tg'O

. . _ .

.

-

- -

-

.

.

.

.

.

_ _ _ .

. .-

,

2

Northeast Nuclear Energy Company

2

APR 10 G87

Your cooperation with us in this matter is appreciated.

Sincerely,

Original Signed By:

Jan:es H..Joyner

Thomas T. Martin, Director

Division of Radiation Safety

and Safeguards

Enclosures:

1.

Appendix A, Notice of Violation

2.

Combined NRC Region I Inspection Report Nos. 50-245/87-02, 50-336/87-02

and 50-423/87-03

cc w/ enc 1:

W. D. Romberg, Vice President, Nuclear Operations

S. E. Scace, Station Superintendent

D. O. Nordquist, Manager of Quality Assurance

R. M. Kacich, Manager, Generation Facilities Licensing

Gerald Garfield, Esquire

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector, Millstone 1

,

NRC Resident Inspector, Millstone 2

l

NRC Senior Resident Inspector, Millstone 3

State of Connecticut

bec w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

DRP Section Chief

M. McBride, RI, Pilgrim

P. Swetland, SRI, Haddam Neck

J. Shea, LPM, NRR

D. Jaffe, LPM, NRR

L. Prividy, RI, Beaver Valley Unit 2

T. Rebelowski, SRI, Millstone 1&2

B. Doolittle, LPM, NRR

R. Bores, DRSS

RI:DRSS

RI:

SS

S

Madden /ms

Kei

toyner

[

7

4/S/87

M/87

Cf

0FFICIAL RECORD COPY

CIR MILL 87/02 - 0002.0.0

03/3I/87