Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215L684 + (02:39:02, 4 December 2024)
- ML20215L683 + (02:39:03, 4 December 2024)
- ML20215L682 + (02:39:04, 4 December 2024)
- ML20215L681 + (02:39:04, 4 December 2024)
- ML20215L679 + (02:39:05, 4 December 2024)
- ML20215L677 + (02:39:06, 4 December 2024)
- NLS8700233, Forwards Revised Page 2 of Util Re Adequacy of Scheduled ATWS Mods Meeting Requirements of 10CFR50.62.Encl Corrects Size of Suction Lines for Standby Liquid Control Sys + (02:39:06, 4 December 2024)
- ML20215L675 + (02:39:07, 4 December 2024)
- ML20215L674 + (02:39:08, 4 December 2024)
- NRC-87-0036, Responds to Generic Ltr 87-06, Periodic Verification of Leak Tight Integrity of Pressure Isolation Valves. Facility Tech Specs Provide Requirements for Leak Rate Testing of All Pressure Isolation Valves + (02:39:09, 4 December 2024)
- ML20215L673 + (02:39:09, 4 December 2024)
- ML20215L668 + (02:39:10, 4 December 2024)
- ML20215L666 + (02:39:11, 4 December 2024)
- ST-HL-AE-2140, Forwards Revised Offsite Dose Calculations Manual & Revised Tech Spec Figure 5.1-4,per Recent Agreements W/Nrc & Util Re Radiological Effluent Monitoring + (02:39:11, 4 December 2024)
- ST-HL-AE-2158, Understands That NRC Finds Meteorological Measurement Sys Acceptable.Item Considered Closed.Addl 6 Months of Data from Nov 1986 - Apr 1987 Will Be Provided.Comparison of Data from Primary & Backup Towers Will Also Be Provided by Aug 19 + (02:39:15, 4 December 2024)
- ML20215L663 + (02:39:16, 4 December 2024)
- ML20215L660 + (02:39:18, 4 December 2024)
- IR 05000455/1987017 + (02:39:19, 4 December 2024)
- ML20215L658 + (02:39:20, 4 December 2024)
- ML20215L655 + (02:39:20, 4 December 2024)
- ML20215L654 + (02:39:21, 4 December 2024)
- 3F0587-05, Forwards Description of Util Nuclear Security Mgt Improvement Program,Per NRC Request During 870210 SALP Meeting.Util Will Be Prepared to Update NRC on Status of Mgt Improvements at 870520 SALP Meeting + (02:39:24, 4 December 2024)
- ML20215L648 + (02:39:24, 4 December 2024)
- ML20215L647 + (02:39:25, 4 December 2024)
- TXX-6434, Interim Deficiency Rept CP-86-60 Re Gaps Between Polar Crane Girder Support Brackets.Initially Reported on 860904. Calculation Review Involving Resolution of Third Party Comments Still in Process.Next Rept Expected by 870617 + (02:39:26, 4 December 2024)
- 05000298/LER-1987-015, :on 870521,unplanned Group 1 Isolation & Reactor Scram Occurred Due to Overtravel of Reactor Mode Switch When Operated.Caused by Personnel Error.Mode Returned to Refuel Position & Group 1 Isolation Reset + (02:39:27, 4 December 2024)
- ML20215L638 + (02:39:28, 4 December 2024)
- ML20215L637 + (02:39:28, 4 December 2024)
- 05000339/LER-1986-001-01, :on 860221,eight Main Steam Line Code Safety Valves on Unit 2 Declared Inoperable After Failing Functional Testing.Cause Unknown.All Main Steam Safety Valves Returned to Operable Status + (02:39:30, 4 December 2024)
- ML20215L634 + (02:39:31, 4 December 2024)
- ML20215L631 + (02:39:31, 4 December 2024)
- ML20215L630 + (02:39:32, 4 December 2024)
- IR 05000016/1987001 + (02:39:34, 4 December 2024)
- ML20215L624 + (02:39:35, 4 December 2024)
- ML20215L623 + (02:39:35, 4 December 2024)
- ML20215L622 + (02:39:36, 4 December 2024)
- ML20215L621 + (02:39:36, 4 December 2024)
- PNO-III-87-084, on 870619,approx 235 Gallons of Reactor Cooling Water Discharged Into Lake Michigan.Caused by Inadequate Opening of Valve in Letdown Sys.Circumstance of Release Under Review + (02:39:37, 4 December 2024)
- ML20215L619 + (02:39:38, 4 December 2024)
- 05000440/LER-1987-026, :on 870411,unexpected RWCU Containment Isolation Occurred.Caused by Inaccurate Differential Flow Indication at Low RWCU Flow & Low Reactor Pressure Conditions.Bias Signal to Flow Summer Changed + (02:39:40, 4 December 2024)
- TXX-6424, Revised Response Re Violations Noted in Insp Repts 50-445/85-13 & 50-446/85-09.Corrective Actions Substantially Expanded & Require More Time than Originally Anticipated + (02:39:41, 4 December 2024)
- ML20215L616 + (02:39:41, 4 December 2024)
- ML20215L613 + (02:39:42, 4 December 2024)
- ML20215L612 + (02:39:43, 4 December 2024)
- 05000339/LER-1986-010, :on 860804,while Performing Periodic Test, Discovered Unidentified RCS Leakage & Rampdown Initiated on 860805.Unit 2 Entered Mode 4 from Mode 5 on 860811 Following Shutdown Due to High RCS Unidentified Leakage + (02:39:44, 4 December 2024)
- ML20215L606 + (02:39:45, 4 December 2024)
- ML20215L608 + (02:39:45, 4 December 2024)
- ML20215L602 + (02:39:47, 4 December 2024)
- ML20215L603 + (02:39:47, 4 December 2024)
- ML20215L599 + (02:39:48, 4 December 2024)
- ML20215L597 + (02:39:48, 4 December 2024)