Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215N688 + (02:17:31, 4 December 2024)
- ST-HL-AE-1795, Forwards Annotated Pages of FSAR Section 7.5.6 Re Channel Independence,Per Qualified Display Processing Sys Third Audit on 860715-16.Changes Will Be Incorporated Into Future FSAR Amend.Related Correspondence + (02:17:31, 4 December 2024)
- ML20215N686 + (02:17:32, 4 December 2024)
- PNO-V-86-076, on 861031,55-gallon Waste Drum Washed Ashore at Fort Stephens State Park.Us Naval Shipyard at Bremerton,Wa Claims Responsibility & Personnel Sent to Retrieve Drum. Radiological Survey Performed & No Contamination Present + (02:17:33, 4 December 2024)
- ML20215N680 + (02:17:37, 4 December 2024)
- ML20215N679 + (02:17:37, 4 December 2024)
- ML20215N677 + (02:17:38, 4 December 2024)
- ML20215N678 + (02:17:38, 4 December 2024)
- ML20215N675 + (02:17:39, 4 December 2024)
- PNO-IV-86-033, on 861104,power Reduced from 100% to Go to Cold Shutdown to Repair body-to-bonnet Seal Ring Leak on Check Valve a in Main Feed Header to Steam Generator B.Leak Rate Estimated to Be Approx 2 to 3 Gpm + (02:17:39, 4 December 2024)
- ML20215N670 + (02:17:40, 4 December 2024)
- ML20215N672 + (02:17:40, 4 December 2024)
- B12248, Forwards Reviews for Isap 1.04, Seismic Qualification of Safety-Related Piping, Isap 1.50, Fracture Toughness of Supports & Isap 1.56, Bolting Degradation, in Accordance W/Jf Opeka + (02:17:41, 4 December 2024)
- ML20215N668 + (02:17:42, 4 December 2024)
- ML20215N665 + (02:17:43, 4 December 2024)
- IR 05000271/1986020 + (02:17:45, 4 December 2024)
- ML20215N663 + (02:17:45, 4 December 2024)
- ML20215N660 + (02:17:46, 4 December 2024)
- ML20215N661 + (02:17:46, 4 December 2024)
- B12295, Forwards Review for Isap 2.17, Zircaloy Clad Conversion, Per 850731 Request + (02:17:47, 4 December 2024)
- ML20215N658 + (02:17:47, 4 December 2024)
- ML20215N656 + (02:17:48, 4 December 2024)
- ML20215N651 + (02:17:49, 4 December 2024)
- ML20215N647 + (02:17:50, 4 December 2024)
- ML20215N649 + (02:17:50, 4 December 2024)
- CLI-86-21, Order CLI-86-21,denying Applicant Petition for Review of Aslab Decision ALAB-817,dismissing Motion for Directed Certification.No Further Filing on Subj Will Be Entertained. Served on 861106 + (02:17:51, 4 December 2024)
- ST-HL-AE-1790, Forwards Responses to SER Open Item 7 Re Isolation Device Test Rept for Electrical Devices.Related Correspondence + (02:17:52, 4 December 2024)
- ML20215N644 + (02:17:52, 4 December 2024)
- ML20215N641 + (02:17:53, 4 December 2024)
- B12250, Forwards Reviews for Isap Topics 1.24, Tech Spec Surveillance for Hydraulic Snubbers, 1.25, Tech Spec Surveillance for Mechanical Snubbers & 1.46, Inservice Testing for Diesel Generator Auxiliaries + (02:17:54, 4 December 2024)
- ML20215N639 + (02:17:54, 4 December 2024)
- ML20215N636 + (02:17:55, 4 December 2024)
- ML20215N637 + (02:17:55, 4 December 2024)
- ML20215N633 + (02:17:56, 4 December 2024)
- L-86-446, Informs That plant-specific ATWS Submittal Will Be Prepared by 870715.Implementation Schedule Will Be Developed After NRC Review + (02:17:57, 4 December 2024)
- ST-HL-AE-1793, Forwards WCAP-11327 & WCAP-11328, Cumulative Usage Factor Criterion for Break Postulation for South Texas Units 1 & 2, Per NRC Request.Repts Withheld (Ref 10CFR2.790).Related Correspondence + (02:17:57, 4 December 2024)
- ST-HL-AE-1796, Forwards Annotated Changes to FSAR & Revised Responses to NRC Questions Providing Results of Internal Flooding Analysis/Evaluation.Consequences of Flooding Inside Reactor Makeup Water Sys Acceptable.Related Correspondence + (02:17:58, 4 December 2024)
- ML20215N628 + (02:17:59, 4 December 2024)
- B12306, Forwards Addl Info on SPDS Isolation Devices,Per NRC 860211 Request.Encl Info Describes Addl Testing Performed + (02:18:00, 4 December 2024)
- ML20215N625 + (02:18:04, 4 December 2024)
- ML20215N623 + (02:18:04, 4 December 2024)
- ML20215N621 + (02:18:05, 4 December 2024)
- ML20215N622 + (02:18:05, 4 December 2024)
- IR 05000456/1986053 + (02:18:06, 4 December 2024)
- ML20215N620 + (02:18:06, 4 December 2024)
- B12300, Requests NRC Provide Written Statement of Concurrence Re Util Conclusion That One Insp Port Upstream of Venturi Adequate for Insp & Cleaning to Prevent Deposits Over Svc Lifetime.Fee Paid + (02:18:07, 4 December 2024)
- ML20215N617 + (02:18:07, 4 December 2024)
- ML20215N616 + (02:18:08, 4 December 2024)
- ML20215N614 + (02:18:09, 4 December 2024)
- ML20215N612 + (02:18:09, 4 December 2024)
- ML20215N608 + (02:18:10, 4 December 2024)
- ML20215N606 + (02:18:11, 4 December 2024)