Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19325E898 + (22:05:39, 31 December 2024)
- ML19325E896 + (22:05:45, 31 December 2024)
- ML19325E895 + (22:05:47, 31 December 2024)
- NRC-89-0187, Submits Justification for RHR HX Tube Leakage Test Commitment Clarification.Commitment to Perform Periodic Leakage Test on RHR HX Tubes Necessary + (22:05:47, 31 December 2024)
- ML19325E893 + (22:05:49, 31 December 2024)
- ML19325E892 + (22:05:50, 31 December 2024)
- ML19325E891 + (22:05:51, 31 December 2024)
- ML19325E889 + (22:05:53, 31 December 2024)
- ML19325E888 + (22:05:57, 31 December 2024)
- ML19325E887 + (22:05:58, 31 December 2024)
- 3F1089-28, Application for Amend to License DPR-72,consisting of Tech Spec Change Request 175,increasing Spent Fuel Pool Storage Capacity & Allowable Fuel Enrichment to 4.2% in Fuel Pool B + (22:06:00, 31 December 2024)
- ML19325E884 + (22:06:03, 31 December 2024)
- ML19325E883 + (22:06:04, 31 December 2024)
- ML19325E882 + (22:06:05, 31 December 2024)
- 05000354/LER-1989-018-01, :on 891003,determined That Two Tech Spec Required Readings Not Taken as Required When Vent Monitoring Sys Inoperable on 890929.Caused by Lack of Adequate Communication.Personnel Involved Counseled + (22:06:07, 31 December 2024)
- ML19325E880 + (22:06:09, 31 December 2024)
- ML19325E879 + (22:06:10, 31 December 2024)
- ML19325E878 + (22:06:11, 31 December 2024)
- 05000336/LER-1989-008-01, :on 891002,determined That Unit Not Performing Functional Check of Control Board Annunciators During Channel Function Tests.Caused by Personnel Error.Review of Instrumentation & Control Dept Procedures Done + (22:06:13, 31 December 2024)
- 05000245/LER-1989-019-01, :on 891003,determined That Surveillance Test for Isolation Condenser Isolation Instrument Functional & Calibr Test Done Beyond Required Time Interval.Caused by Personnel Error.Dept Procedure Revised + (22:06:16, 31 December 2024)
- ML19325E874 + (22:06:18, 31 December 2024)
- ML19325E873 + (22:06:19, 31 December 2024)
- ML19325E871 + (22:06:20, 31 December 2024)
- ML19325E868 + (22:06:21, 31 December 2024)
- ML19325E867 + (22:06:22, 31 December 2024)
- ML19325E866 + (22:06:23, 31 December 2024)
- 0CAN108915, Responds to NRC 890829 Request for Addl Info Re Violations Noted in Insp Repts 50-313/89-16 & 50-368/89-16.Corrective Actions:Util Currently in Process of Enhancing Existing Matls Mgt Program to Meet Guidelines of NCIG-07 + (22:06:24, 31 December 2024)
- ML19325E864 + (22:06:24, 31 December 2024)
- ML19325E862 + (22:06:27, 31 December 2024)
- ML19325E861 + (22:06:29, 31 December 2024)
- ML19325E860 + (22:06:30, 31 December 2024)
- ML19325E859 + (22:06:35, 31 December 2024)
- ML19325E858 + (22:06:36, 31 December 2024)
- TXX-8976, Forwards Endorsement 6 to Nelia Certificate NW-167 & Endorsement 7 to Maelu Certificate MW-190,for Info Re Financial Protection Requirements of 10CFR140.13 + (22:06:37, 31 December 2024)
- ML19325E857 + (22:06:37, 31 December 2024)
- ML19325E854 + (22:06:40, 31 December 2024)
- ML19325E848 + (22:06:41, 31 December 2024)
- ML19325E851 + (22:06:41, 31 December 2024)
- ML19325E846 + (22:06:42, 31 December 2024)
- 0CAN108913, Responds to 890509 Generic Ltr 89-07, Power Reactor Safeguards Contingency Planning for Surface Vehicle Bombs. Short-term Actions Incorporated Into Safeguards Contingency Planning to Protect Against Sabotage + (22:06:43, 31 December 2024)
- ML19325E843 + (22:06:46, 31 December 2024)
- ML19325E841 + (22:06:47, 31 December 2024)
- ML19325E842 + (22:06:47, 31 December 2024)
- ML19325E840 + (22:06:48, 31 December 2024)
- ML19325E838 + (22:06:49, 31 December 2024)
- ML19325E837 + (22:06:53, 31 December 2024)
- ML19325E836 + (22:06:54, 31 December 2024)
- ML19325E834 + (22:06:54, 31 December 2024)
- ML19325E833 + (22:06:56, 31 December 2024)
- 05000352/LER-1988-027-01, :on 880721,main Control Room Ventilation Sys Isolated on Channel D High Chlorine Concentration Signal. Caused by Rainwater Coming in Contact W/Chlorine Analyzer Probe.Special Event Procedure SE-2 Implemented + (22:06:57, 31 December 2024)
- ML19325E829 + (22:07:01, 31 December 2024)
- ML19325E827 + (22:07:05, 31 December 2024)