Ack Receipt of 891027 Response to Generic Ltr 88-20,Suppl 1, Individual Plant Exams. NRC Will Review Util Proposed Individual Plant Exam Plan for Conformance to Requirements & Document Acceptability in Ltr by 891211
ML19325E878
Person / Time
Site: Pilgrim
Issue date: 10/31/1989
From: Mcdonald D
Office of Nuclear Reactor Regulation
To: Bird R
BOSTON EDISON CO.
References
GL-88-20, TAC-74451, NUDOCS 8911090277
Download: ML19325E878 (3)


Text

~

' 7;

[yg' mo ;

e p

October 31, 1989 y: '

3 M'

' Docket No. 50-293 p,

Mr.. Ralph G.' Bird l Senior.Vice President - Nuc1?ar l

Boston' Edison Company l

, Pilgrim Nuclear Power Station

/

RFD #1 Rocky Hill. Road.

3 k.

Plymouth, Massachusetts '02360L T

Dehr Mr. Bird:.

SUBJECT:

RECEIPT OF CO-DAY RESPONSE TO GENERIC LETTER 88-20, SUPPLEMENT 1, '

INDIVIDUAL PLANT EXAMINATIONS (IPE) (TAC NO. 74451)

.Re:

Pilgrim Nuclear Power Station I

'We have received your' letter dated October 27, 1989, in response to.

the 60-day reporting requirements of Generic Letter 88-20, Supplement 1.

s

, The staff will. review your proposed IPE plan for conformance to the requirements of.the generic letter and will review all. of your proposed schedules together for reasonableness and to' determine the impact on.your staff and the NRC. staff resources.

If your proposed plan and/or.. schedule E

are not acceptable, the IPE review team and I-will contact you'as soon as

.possible to' explain the NRC staff's position. Otherwise, the NRC staff will

' document the acceptability of your plan and schedule in a letter by December '1,

- e

.1989 4

.j.

Should you have any questions concerning the generic letter, please contact-Michael L..Boyle NRR at (301) 492-1308 or John H. Flack, RES at 1

(301) 492-3979.

Sincerely, a +

Dan!e G. Mcdonald, Senior Project Manager Project Directorate-I-3 4

Division of Reactors Projects I/II i

Office of Nuclear Reactor Regulation cc: See next page l

)ISTRIBUTION f5 mcket,FU e ll,I NRC & Local PDRs PD # I-3 Reading SVarga r.

BBoger MRushbrook DMcDonald OGC EJordan I< r

' BGy s

ACRS (10)

MBoyle

.Jrla,p PM PDI-3 c onald RWess an VF*1 m

L@/f/89 LP/P /89

, i 0FFICIAL RECORD COPY Document Name: IPE TAC 74451

.e 8911090277 891031 n

,e PDR ADOCK 05000293

'1 P

PNV

"e

/ $ ttog"o o

s UNITED STATES 1

.8 "

',t.

NUCLEAR REGULATORY COMMISSION h

k

,%,,,, s.**},^

WASHINGTON, D. C. 20555 October 31, 1989 ic rocket No 293

)

'Mr. Ralpn G. Bird Senior Vice President - Nuclear

-Boston' Edison Company Pilgrim Nuclear Power Statfor RFD #1 Rocky Hill Road Plymouth, Massachusetts 02360

Dear Mr. Bird:

SUBJECT:

RECEIPT OF 60-DAY RESPONSE TO GENERIC LETTER 88-20, SUPPLEMENT 1, INDIVIDUAL PLANT EXAMINATIONS'(IPE) (TAC NO. 74451)

Re:

Pilgrim Nuclear Power Station We have received.your letter dated October 27, 1989, in response to

'the 60-day reporting requirements of Generic Letter.SP-20 Supplement ~1.

The staff will review your proposed IPE plan for. conformance to the 4

~

requirements of the generic letter and will review all of your proposed schedules together for reasonableness and to determine the impact on your staff and'the NRC. staff resources.

If your proposed plan and/or schedule are not acceptable, the IPE review team and I will contact you as soon as possible to explain the NRC staff's position.

Otherwise, the NRC staff will document the acceptability of your plan and schedule in a letter by December I, 1989.

.Should you have any questions concerning the generic letter, please contact Michael L. Boyle, NRR at (301) 492-1308 or' John H. Flack, RES at (301) 492-3979.

Sincerely, I

jw

flh bY()l Daniel G. Mcdonald, Senior Project Ma Project Directorate I-3 Division of Reactors Projects I/II Office of Nuclear Reactor Regulation cc
See next page

~

, t s.

j'?

Mr. Ralph G. Bird cc:

Mr. K. L. Highf111 Mr. Richard N. Swanson, Manager Vice President of Operations /

Nuclear Engineering Department Station Station Boston Edison Company Pilgrim Nuclear Power Station 2S Braintree Hill Park hNtb0 ksNbu!0$0s an e,

assachsM ts 02184 02360 Resident Inspector Ms. Elaine D. Robinson

11. S. Nuclear Regulatory Commission Nuclear. Information Manager Pilgrim Nuclear Power Station Pilgrim Nuclear Power Station Post Office Box 867 RF0 #1, Rocky Hill Road Plymouth, Massachusetts 02360 Plymouth, Massachusetts 02360 Chairman, Board of Selectmen Mr. Charles V. Barry 11 Lincoln Street Secretary of Public Safety Plymouth, Massachusetts 02360 Executive Office of Public Safety One Ashburton Place Office of the Comissioner Bostor., Massachusetts 02108 Massachusetts Departr>ent of Environmental-Quality Engineering One Winter Street Boston, Massachusetts 02108

~

Office of the Attorney General One Ashburton Place 20th Floor Poston, Massachusetts 02108 Mr. Robert M. Hallisey, Director Radiation Control Program Massachusetts Department of Public Health 150 Tremont Street, 2nd Floor Boston, Massachusetts 02111 Pegional Administrator, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406 Mr. John Dietrich Licensino Division Manager Boston. Edison Company 25 Braintree Hill Park Braintree, Massachusetts 02104

~

,n--

-