Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19327A331 + (13:13:36, 31 December 2024)
- TXX-3153, Suppls 791219 Response to IE Bulletin 79-25, Failures of Westinghouse Bfd Relays in Safety-Related Sys. All 22 Vendors Contacted.Nine Stated That Relays Are Not Supplied for Use at Facility.Final Response to Be Sent by 800915 + (13:13:37, 31 December 2024)
- ML19327A330 + (13:13:37, 31 December 2024)
- ML19327A327 + (13:13:39, 31 December 2024)
- ML19327A325 + (13:13:40, 31 December 2024)
- ML19327A326 + (13:13:40, 31 December 2024)
- ML19327A324 + (13:13:41, 31 December 2024)
- ML19327A323 + (13:13:42, 31 December 2024)
- ML19327A322 + (13:13:43, 31 December 2024)
- IR 05000334/1980003 + (13:13:47, 31 December 2024)
- ML19327A320 + (13:13:48, 31 December 2024)
- ML19327A319 + (13:13:49, 31 December 2024)
- ML19327A316 + (13:13:50, 31 December 2024)
- ML19327A315 + (13:13:51, 31 December 2024)
- IR 05000454/1980009 + (13:13:52, 31 December 2024)
- ML19327A313 + (13:13:54, 31 December 2024)
- ML19327A311 + (13:13:55, 31 December 2024)
- ML19327A310 + (13:13:56, 31 December 2024)
- ML19327A308 + (13:13:57, 31 December 2024)
- ML19327A307 + (13:13:58, 31 December 2024)
- ML19327A305 + (13:13:59, 31 December 2024)
- ML19327A304 + (13:14:00, 31 December 2024)
- ML19327A301 + (13:14:01, 31 December 2024)
- ML19327A302 + (13:14:01, 31 December 2024)
- ML19327A299 + (13:14:02, 31 December 2024)
- ML19327A300 + (13:14:02, 31 December 2024)
- ML19327A295 + (13:14:03, 31 December 2024)
- ML19327A296 + (13:14:03, 31 December 2024)
- ML19327A293 + (13:14:04, 31 December 2024)
- ML19327A292 + (13:14:05, 31 December 2024)
- ML19327A291 + (13:14:05, 31 December 2024)
- 05000259/LER-1980-053-03, /03L-0:on 800704,during Normal Operation,Linear Heat Generation Rate Tech Specs Exceeded in Three Nodes. Caused by Operator Raising Reactor Pressure to Clear One Steam Line Low Pressure Isolation.Power Reduced to Conform + (13:14:07, 31 December 2024)
- ML19327A288 + (13:14:08, 31 December 2024)
- A01125, Informs That Evacuation Time Estimates Submitted for Units 1 & 2 in Are Applicable for Unit 3,in Response to NRC + (13:14:09, 31 December 2024)
- 05000259/LER-1980-053, Forwards LER 80-053/03L-0 + (13:14:11, 31 December 2024)
- ML19327A284 + (13:14:12, 31 December 2024)
- 05000327/LER-1980-105-03, /03L-0:on 800627,w/unit in Mode 3,pressure Indication from Pressurizer Pressure Loop P-68-323 Declared Inoperable.Caused by Trapped Air from Repair of Transmitter Sense Line.Line Backfilled & Transmitter Returned to Svc + (13:14:13, 31 December 2024)
- ML19327A282 + (13:14:14, 31 December 2024)
- ML19327A280 + (13:14:15, 31 December 2024)
- 05000327/LER-1980-105, Forwards LER 80-105/03L-0 + (13:14:16, 31 December 2024)
- 05000327/LER-1980-103-03, /03L-0:on 800627,containment Relief Switches 1-PS-30-46 A&B, 47 A&B,48 A&B Did Not Continue to Operate Throughout Loca.Caused by Switches Not Being Tested to Potential LOCA Radiation Levels.Switches Will Be Evaluated + (13:14:18, 31 December 2024)
- 05000327/LER-1980-103, Forwards LER 80-103/03L-0 + (13:14:19, 31 December 2024)
- ML19327A274 + (13:14:20, 31 December 2024)
- ML19327A272 + (13:14:21, 31 December 2024)
- ML19327A273 + (13:14:21, 31 December 2024)
- ML19327A270 + (13:14:22, 31 December 2024)
- ML19327A268 + (13:14:23, 31 December 2024)
- ML19327A269 + (13:14:23, 31 December 2024)
- ML19327A267 + (13:14:24, 31 December 2024)
- IR 05000322/1980008 + (13:14:26, 31 December 2024)
- ML19327A264 + (13:14:27, 31 December 2024)
- ML19327A263 + (13:14:28, 31 December 2024)