ML19327A316
| ML19327A316 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 07/14/1980 |
| From: | Robert Carlson NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Dunn C DUQUESNE LIGHT CO. |
| Shared Package | |
| ML19327A317 | List: |
| References | |
| NUDOCS 8008060001 | |
| Download: ML19327A316 (1) | |
See also: IR 05000334/1980003
Text
,
l
!
4-
' ' *
- p5sig'4 *
8
UNITED STATES
~
8
NUCLEAR REGULATORY COMMISSION
o
$
E
REGION I
%
631 PARK AVENUE
%, + . . . + ,o',&
KING OF PRUSSIA, PENNSYLVANIA 19406
Docket No. 50-334
JE Af E
Duquesne Light Company
ATTN: Mr. C. N. Dunn
Vice President
Operations Division
435 Sixth Avenue
Pittsburgh, Pennsylvania 15219
Gentlemen:
Subject:
Inspection 50-334/80-03
This refers to your letter dated July 2,1980, in response to our letter
dated April 2, 1980.
Thank you for informing us of the corrective and preventive actions documented
in your letter.
These actions will be examined during a subsequent inspection
of your licensed program.
Your cooperation with us is appreciated.
Sincerely,
_ 3 -
kW,
A?!e=
Ro ert T. Carlson, Chief
Reactor Construction and
Engineering Support Branch
cc:
F. Bissert, Technical Assistant Nuclear
R. Washabaugh, QA Manager
J. Werling, Station Superintendent
G. Moore, General Superintendent, Power Stations Department
J. J. Carey, Director of Nuclear Operations
R. Martin, Nuclear Engineer
J. Sieber, Superintendent of Licensing and Compliance, BVPS
8008060001
,
-!c
-
.>
.
'AtS
M
e m 4ss4 coo
es s. m e
au.
July 2, 1980
gewp, Pa.
.
United States Nuclear Regulatory Commission
Office of Inspection and Enforcement
Attn: Robert T. Carlson, Chief
'
Reactor Construction and Engineering Support Branch
Region I
631 Park Avenue
King of Prussia, Pennsylvania 19406
Reference:
Beaver Valley Power Station, Unit No. 1
Docket No. 50-334, License No. DPR-66
IE Inspection No. 80-03
Dear Mr. Carlson:
In response to your letter dated April 2, 1980, forwa: ding the subject
inspection report, our letter dated April 28, 1980, was submitted in
accordance with 10CFR2.201.
The reply addressed the actions taken as a
result of the noted noncompliance - the failure to follow procedures and
perform station housekeeping tours.
Following discussions with the NRC Resident Inspector concerning our
reply, the following actions are being taken:
1.
The option of the Station Superintendent to waive the formal house-
keeping tours will be deleted from the housekeeping procedure.
2.
During heavy construction activities, Construction Safety Inspectors
will be required to conduct housekeeping tours in accordance with
Chapter 1, Section J, of the Beaver Valley Power Station Maintenance
Manual to supplement the required facilities inspection tours.
Pro-
blem areas that are identified on the construction tour reports will
be reviewed and investigated for resolution.
.
3.
Depandent upon the magnitude of maintenance and/or construction
activities, housekeeping tour frequencies will be adjusted as plant
conditions dictate.
(
/
,
I
,
9%8@f
a
' ' N C ,'
--
.
.
.
Banver Vc11sy Powsr Station, Unit No. 1
Docket No. 50-334, License No. DPR-66
IE Inspection No. 80-03
Page 2
4.
The Beaver Valley Power Station Fire Protection Plan is written in
accordance with Regulatory Guide 1.120, " Fire Protection Guidelines
For Nuclear Power Plants," which references Regulatory Guide 1.39 for
housekeeping requirements.
The Beaver Valley Power Station Mainten-
ance Manual, Chapter 1, Section J - Housekeeping, is being revised
to reflect the requirements of Regulatory Guide 1.39, " Housekeeping
Requirements For Water-Cooled Nuclear Power Plants" and ANSI N45.2.3,
" Housekeeping During the Construction Phase of Nuclear Power Plants,"
which states, " Periodic 1..spection and examination of the work areas
and the construction practices shall be performed at scheduled inter-
vals to assure adequacy of cleanness and housekeeping practices."
5.
The above noted revisions to the Maintenance Manual will be issued by
July 7, 1980.
If you have any questions concerning this response, please contact my
office.
Very truly yours,
[ / / h .... -
C. N. Dunn
Vice President, Operations
cc:
Mr. D. A. Beckman, Resident Inspector
U.S. Nuclear Regulatory Commission
Beaver Valley Power Station
Shippingport, Pennsylvania 15077
U.S. Nuclear Regulatory Commission
c/o Document Management Branch
Washington, D.C.
20555