Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19327C180 + (12:21:29, 31 December 2024)
- TAC:73125 + (12:21:31, 31 December 2024)
- ML19327C177 + (12:21:31, 31 December 2024)
- ML19327C173 + (12:21:33, 31 December 2024)
- ML19327C172 + (12:21:34, 31 December 2024)
- ML19327C170 + (12:21:34, 31 December 2024)
- IR 05000285/1989041 + (12:21:40, 31 December 2024)
- ML19327C168 + (12:21:44, 31 December 2024)
- ML19327C166 + (12:21:46, 31 December 2024)
- ML19327C164 + (12:21:49, 31 December 2024)
- ML19327C161 + (12:21:51, 31 December 2024)
- ML19327C162 + (12:21:51, 31 December 2024)
- ML19327C160 + (12:21:53, 31 December 2024)
- TAC:53672 + (12:21:53, 31 December 2024)
- ML19327C159 + (12:21:55, 31 December 2024)
- ML19327C157 + (12:21:56, 31 December 2024)
- ML19327C156 + (12:21:57, 31 December 2024)
- ML19327C155 + (12:21:58, 31 December 2024)
- ML19327C154 + (12:21:59, 31 December 2024)
- ML19327C153 + (12:22:00, 31 December 2024)
- ML19327C151 + (12:22:01, 31 December 2024)
- ML19327C152 + (12:22:01, 31 December 2024)
- ML19327C149 + (12:22:02, 31 December 2024)
- ELV-01048, Forwards Amend 14 to Physical Security & Contingency Plan, Incorporating Changes Initiated as Result of Generic Ltr 89-07, Power Reactor Safeguards Contingency Planning for Surface Vehicle Bombs. Amend Withheld (Ref 10CFR73.21) + (12:22:03, 31 December 2024)
- ML19327C147 + (12:22:03, 31 December 2024)
- 3F1189-12, Provides Revised Justification for Continued Operation Re HPI Line Break.Util Concluded That Likelihood of Instrumentation Being Relied Upon to Perform Design Basis Mitigation Function Remote.Supports Operation Until Refuel + (12:22:06, 31 December 2024)
- 3F1189-09, Discusses Status of Security Program Improvements.Listed Addl Improvements Planned But May Be Subj to Changes If More Appropriate Way of Improving Sys Identified.Sys Presently Scheduled to Be Operational by End of Refuel 8 + (12:22:08, 31 December 2024)
- ML19327C143 + (12:22:11, 31 December 2024)
- ML19327C142 + (12:22:13, 31 December 2024)
- ML19327C140 + (12:22:20, 31 December 2024)
- ML19327C139 + (12:22:21, 31 December 2024)
- IR 05000285/1989045 + (12:22:25, 31 December 2024)
- ML19327C136 + (12:22:26, 31 December 2024)
- 05000333/LER-1989-015, :on 890918,two Remote Manually Operated Diaphragm Air Operated Isolation Valves Failed Closing Time Acceptance Criteria.Caused by Buildup of Iron Oxide Sludge. Valves Disassembled & Cleaned + (12:22:28, 31 December 2024)
- 05000333/LER-1989-015-01, Forwards LER-89-015-01,correcting Format Descrepancies, Editorial Errors,Changing Postulated Scenario in Analysis Section & Changing Description of Effect of Corrosion Product Buildup on Valve Operability + (12:22:30, 31 December 2024)
- IR 05000413/1989029 + (12:22:44, 31 December 2024)
- ML19327C128 + (12:22:49, 31 December 2024)
- ML19327C127 + (12:22:50, 31 December 2024)
- ML19327C125 + (12:22:50, 31 December 2024)
- ML19327C123 + (12:22:52, 31 December 2024)
- ML19327C122 + (12:22:54, 31 December 2024)
- ML19327C121 + (12:22:55, 31 December 2024)
- ML19327C120 + (12:22:56, 31 December 2024)
- IR 05000327/1989022 + (12:23:05, 31 December 2024)
- ML19327C117 + (12:23:07, 31 December 2024)
- ML19327C116 + (12:23:07, 31 December 2024)
- ML19327C115 + (12:23:08, 31 December 2024)
- ML19327C114 + (12:23:09, 31 December 2024)
- ML19327C113 + (12:23:10, 31 December 2024)
- ELV-01000, Forwards Amend 13 to Physical Security & Contingency Plan, Addressing Addition of New Alternate Plant Entry/Security Bldg.Encl Withheld + (12:23:11, 31 December 2024)
- 05000382/LER-1989-002-01, Forwards LER 89-002-01.Submittal of LER Delayed from 891109 Due to Extenuating Circumstances + (12:23:16, 31 December 2024)