ML19327C125

From kanterella
Jump to navigation Jump to search
Application for Amends to Licenses NPF-35 & NPF-52,revising Tech Spec Limiting Condition for Operation 3.1.3.5 & Figure 3.1-1 Fully Withdrawn Rod Bank Insertion Limits from 228 Steps Withdrawn to 225 Steps Withdrawn or Higher
ML19327C125
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 11/10/1989
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML19327C126 List:
References
NUDOCS 8911200177
Download: ML19327C125 (3)


Text

f -(g 41 i;

% ll:

.(

~

I)ukeIbwer Compa:y

. Ilti11 hkn fice hesida!

Y

. PO Iknc 33198 Suclear hoductiod I

Charlotte,it C 28242

[;[

(704)373 421

'DUKEPOWER.

November-' 10, 1989 j-.

l J' 4

U. S. Nuclear Regulatory Commission Attention: Document Control Desk j

Washingt'on, D.C.

20555

?

Subject:

Catawba Nuclear Station, Units 1 and 2' Docket Nos. 50-413 and 50-414 1

. Technical Specification Amendment Rod Bank Insertion limits

Dear Sir:

This letter contains a' proposed amendment to the Technical Specifications for-Facility Operating License Nos. NPF-35 and NPF-52 for Catawba Units 1 i

~ and 2. Th u request involves changing tho' Technical Specification Limiting Condition for Operation-3.1.3.5 and Figure 3.1-1 fully withdrawn Rod Bank Insertion limits from 228 steps withdrawn to 225 steps withdrawn or

{

higher. Technical. Specification Basis Section 3/4.1.3 has been revised to

. reflect the insertion limit change.

a 1

This amendment request is being submitted in response to significant high wear rates on 17 x.17 Rod control Cluster Assemblies identified at several foreign and domestic Westinghouse plants.

t Attachment I contains the proposed Technical Specification changes. Attaciunent II contains a discussion of the justification and a No Significant Hazards

- Analysis. This analysis is included pursuant to 10 CFR 50.91. It has been concluded that the proposed amendment does not involve significant hazards considerations.

The proposed changes are to be first implemented during the Catawba Unit 1 cycle 5 initial criticality. Unit 1 cycle 5 initial criticality is scheduled for March 27, 1990. Therefore, it is requested that the NRC review and approve-the proposed amendment prior to March 1990.

. Pursuant to 10 CFR 50.91 (b) (1) the appropriate South Carolina State Official is being provided a copy of this amendment request.

. Very truly yours, b/

j f

s t

3.-

Hal B. Tucker JGT/5/RCCA I

1

[

Attachments 0911200177 891110 PDR ADOCK 05000413

' p PDC j

c

=>

fs

[. < '

i Document Control Desk J

November 10, 1989

[

Page 2 xct Mr. Stewart D. Ebneter Regional Administrator U. S. Nuclear Regulatory Commission i:

Region II 101 Marietta St., NW, Suite 2900-Atlanta, Georgia 30323 Mr. lleyward Shealy, Chief

[

Bureau of Radiological lloalth j

[

Soutu Carolina Departuent of Ilealth &

L Environmental Control i

2600 Bull Street i

Columbia, South Carolina 29201 i'

American Nuclear Insurers c/o Dottie Sherman, ANI Library The Exchange, Suite.245 270 Farmington Avenue Farmington, CT 06032-M & M Nuclear Consultants 1221 Avenue of the Americas New York, New York 10020 a

INPO Records Center Suite 1500 1100 Circle 75 Parkway

. Atlanta, Georgia 30339 Mr. W. T. Orders

.NRC Resident Inspector

' Catawba Nuclear Station Dr. K. N. Jabbour Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission One White Flint North-

~

Washington, D. C. 20555 s

l-i

7-

,1

s-en ;_

f.;'

Document Control Desk November 10, 1989 Page 3-Ital B. Tucker, being duly sworn, r4tates that he is Vice President of Duke Power Company; that he is authorized en.the part of said Company to sign and file with the Nuclear Regulatory Commission this revirion to the Catawba Nuclear Station

. Technical Specifications, Appendix A to License Nos. NPF-35 and NPF-52; and that all statements and matters set forth therein are true and correct to the best of his knowledge.

[

w s v "llal B. Tucker, Vice President Subscribed and sworn to before me this 10th day of November, 1989.

b As An[A o

ta(y Public "

)

~

j o 'en.re r, o

,h.b.'.."

My Commission Expires:

e Y?ds Si lWY

( g o T A y, 'f. U B L \\C.l E

I' I

A=25 i

~

. A 5

45 g

~

Q CO one.ino t

l l'

Y