Forwards Insp Rept 50-285/89-41 on 891010-13 & Notice of Violation
ML19327C166
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 11/14/1989
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Morris K
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML19327C167 List:
References
NUDOCS 8911210054
Download: ML19327C166 (3)


See also: IR 05000285/1989041

Text

{'

.. .

..

\\

.

'

'

NOV 1419g9

-

In Reply Refer To:

I

Docket:

50-285/89-41

Omaha Public Power District

<

!

ATTN:

Kenneth J. Morris, Division Manager

Nuclear Operations

444 South 16th Street Mall

Omaha, Nebraska 68102-2247

Gentlemen:

This refers to the inspection conducted by Mr. L. T. Ricketson of this office

during the period October 10-13, 1989, of activities authorized by NRC

Operating License DPR-40 for the Fort Calhoun Station, and to the discussion of

our findings with you and members of your staff at the conclusion of the

inspection on October 13, 1989.

Areas examined during the inspection included portions of the radiation

protection program. Within these areas, the inspection consisted of selective

examination of procedures and representative records, interviews with

!

personnel, and observations by the inspector.

The inspection findings are

documented it the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements.

Consequently, you are required to respond to

this violation, in writing, in accordance with the provisions of Section 2.201

-

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations.

Your response should be based on the specifics contained in the

Notice of Violation enclosed with this letter.

We have also examined actions you have taken with regard to previously

!

identified inspection findings.

The status of these items is identified in

paragraph 2 of the enclosed report.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

.by the Paperwork Reduction Act of 1980, PL 96-511.

?

\\

RIV:FRPS E .

C:FRPS

0

Si

RP

O

,

LTRicketson:1m

E Murray

AB

collins

l

/// f /89

1(/q/89

llM /89

// //4/89

,

8911210054 891114

PDR

ADOCK 05000285

i

PDC

i

4

. .

..

,

.. ..

Omaha Public Power District

-2-

'

!

>

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

'

Sincerely,

f 7 6 k'fMN

.

fYSamuelJ. Collins, Director

r

Division of Reactor Projects

Enclosures:

1.

Appendix A - Notice of Violation

2.

Appendix B - NRC Inspection Report

50-285/89-41

3.

Attachment - Procedures Reviewed

cc w/ enclosures:

LeBoeuf Lamb, Leiby & MacRae

ATTN: Harry H. Voigt, Esq.

1333 New Hampshire Avenue, NW

Washington, D.C.

20036

Washington County Board

of Supervisors

ATTN: Jack Jensen, Chairman

Blair, Nebraska 68008

U.S. Nuclear Regulatory Commission

ATTN:

Senior Resident Inspector

<

'

P.O. Box 309

Fort Calhoun, Nebraska 68023

Combustion Engineering, Inc.

- ATTN: Charles B. Brinkman, Manager

Washington Nuclear Operations

12300 Twinbrook Parkway, Suite 330

Rockville, MD 20852

U.S. Nuclear Regulatory Commission

ATTN:

Regional Administrator, Region IV

611 Ryan Plaza Drive, Suite 1000

Arlington, Texas 76011

Department of Health

ATTN: Harold Borchert, Director

Division of' Radiological Health

301 Centennial Mall, South

P.O. Box 95007

!

Lincoln, Nebraska 68509

e

_y,=-'

' _ -

.

.

-

o

,

o-

e4-

..

. . .

'...

i

,

.* -

.

i

e *

'

!

.

!

.

o"

I

Omaha-Public Power District

-3-

i

,

l

!

E+

.

1

1

>

,e

Fort Calhoun. Station:

l

, ~ '

"

ATTN:

G.-R. Peterson, Manager

,

o

P.O. Box 299:

1

.

-Fort Calhoun, Nebraska 68023

l

l

b"

- bec to DMB (IE01);

l

t, <

.

.

,

t"

bec distrib, by RIV:-

j

  • DRSS/FRPS

- Section Chief (DRP/B)

l

"

-

- * MIS System

  • RIV File

'

'

>

- - *DRPt

  • RSTS Operator

' ' * Project Engineer (DRP/B)

Lisa Shea RM/ALF '

l

  • DRS

"

.

.

.

  • L. Ricketson

'

.,

  • A. Bournia,'NRR, Project' Manager.(MS:

13-D-18)

!

  • B. Murray
  • B.

Beach

j

i-

  • G. Sanborn. EO

(h

' *w/766

.l

!

i ':

i

b

')

f.

)

-

e

,

'

i

k

.!

i

' '

Il

'.e

'

'

t

.

'

t-

.;

,

r.

!L

i

i

%

.!

.' :

h

\\

'

~

t

i

9

>

4

i.

'

B

.

  • .

)

i

1.

-

. . , , _ . . .

-

. - , -

, _ . _ . . _ .

- . _ _ _

.

-. ..

..-.,_,....._,.-,,,5,I