Monthly Operating Rept for Oct 1989 for Maine Yankee Atomic Power
ML19327C114
Person / Time
Site: Maine Yankee
Issue date: 10/31/1989
From: Hall S, Whittier G
Maine Yankee
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GDW-89-364, MN-89-140, NUDOCS 8911200083
Download: ML19327C114 (6)


Text

I.[.

e,,

MaineYankee EEKMIjRfECTffi6h uutwt E@G92

{

("

EOiSON DRIVE

  • AUGUSTA, MAINE o4336 * (207) 622-4868 i

t i

i I

)

November 13, 1989 j

MN-89-140 GDW-89-364 t

UNITED STATES NUCLEAR REGULATORY COMMISSION i

Attention: Document Control Desk Washington, DC 20555 I '

References:

(a)

License No. DPR-36 (Docket No. 50-309)

(

(b)

NUREG-0020, Licensed Operating Reactor Status Summary Report l

Subject:

Maine Yankee Monthly Statistical Report Gentlemen:

Enclosed you will find the Monthly Statistical Report for the Maine Yankee l

Atomic Power Station for October, 1989.

j Very truly yours, l

b/N!

u G. D. Whittier, Manager i

Nuclear Engineering and Licensing l

r l

GDW:SJJ i

r l

Enclosure i

i l '

i Mr. Richard H. Wessman c:

L Mr. William T. Russell l

Mr. Eric J. Leeds Mr. Cornelius Holden i

i'

$AY

'l GDW89364.LTR 8911200083 891031 PDR ADOCK 05000309 R

PDC

.~

+

l 1

\\

l 1

i I',

b l

r i

Malne Wankee i

l i..

i t

\\

I-

?

i 1

l t

l r

t l

l M o n t: h l y Statistical Report i

s For October 1989 o

l i

J

?

P r

i t

l

(-

3 3

CPERATIN3 DATA REPORT D00kOt N3.

50-309

)

Date:

06/Nov/89 L-h Completed By -

S. L.

HALL Telephone:

207-622-4868 f

i l

1 Unit Name.......................................

_ Maine, Yankee I

2. Reporting Period................................

_0ctober 1989 3

Licensed Thermal Power (MWt)....................

2700

4. Nameplate Rating (Gross MWe)....................

890 i

S. Design Electrical Rating (Net MWe)..............

840

(

9

6. Maximum Dependable Capacity (Gross MWe).........

870

[

L

~7 Maximum Dependable capacity (Not MWe)...........

830 i

f S. If Changes in capacity Ratings (Items Number 3-7)

-Since.Last Report, Give Reasons:

NO CHANGES I

9. Power Level to Which Restricted, if Any (Net MWe)
10. Reasons for Restrictions, if Any j

THIS MONTH YEAR-TO-DATE CUMULATIVE

11. Hours In Reporting Period 745.00 7,296.00

[

12. Number of Hours Reactor i

Was C.ritical...........

613.20 6,962.39 119,765.38

13. Reactor Reserve Shutdown Ho'rs..................

0.00 0.00 0.00 14, Hours Generator On-line..

608.70 6,904.74 116,447.23

15. Unit Reserve Shutdown Hours................,.

0.00 0.00 0.00 l

16. Gross Thermal Energy Generated (MWH)........

1,587,609.00

_17,960,755.00 269,033,468.00

17. Gross Electrical Energy i

Generated (MWH)........

538,340.00 6.099,680.00 88.148,040.00

18. Net Electrical Energy r

Generated (MWH)........

5.1,851.00 5.898,809.00 84,386,983.00

19. Unit Service Factor......

81.70 94.64 78.29,

20. Unit Availabilty Factor..

81.70 94.64 78.29

21. Unit Capacity Factor (Using MDC Het)........

84.39 99.09 71.40 28.~ Unit Capacity Factor (Using DER Net)........

83.39 97.48 69.65 l

,23. Unit Forced Outage Rate..

2.12 3.74 6.88 l

24. Shutdowns Scheduled over Next 6 Months Date Type Duration f

4/14/90 Refuelinc 8 weeks i-

2 5. If Shutdown at End of Report period, Estimated Date of Startup N/A

7 y

Docket No 50-309 Unit'. Name Maine Yankee Date 891103 Completed Bye B.L. Hall

[

Telephone:

207-622-4868

}

R: port Month: October, 1989 i

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCES

[

[

At the beginning of the month the unit was at 100% power.

i.

On October 10th, the containment purge supply valve penetration failed c type C Containment Leakage Rate Test.

The unit was taken off line l-upon exceeding t he Technical Specification Remedial Action Statement.

The unit remained shutdown for a scheduled Reactor coolant pump Sealm Outage.

L On October 16th, the unit was returned to 100% power.

On-October 30th, the unit war reduced to 94% power to retrieve a dropped rod.

The unit returned to 100% the same day.

The unit was maintained at 1001 power for the remainder of the month.

i I

' AVERAGE' DRILY UNIT. POWER LEVEL J

FOR OCTOBER 1989 Docket No.

50-309 1

1 Unita Maine Yankee Date:

03/Nov/89 Completed By:

S. L. HALL

[

Telephone:

207-622-4868 l

1 e

5 Day!

Avg. Daily Power Level Day Avg. Daily Power Level.

(MWe-Nat)

(MWe-Net) j i

.1 871 16 254 l

2 872 17 819 3

871 18 869

<4 874 19 873 5

874 20 871

[

6 873' 21 873 i

t 7

874 22 872 8

873 23 874 j

t 9

872 24 872 e

10 569 25 871 i

11 0

26 873 l

12 0

27 872 7

13 0

28 874 873 14 0

29 15~

0 30 873 31 875 l

l 5

f 1

l l

l-l1 l

l l

7-

' ' UNIT.. SHUTDOWNS AZD POTER REDUCTIONS D:ekct No.:

50-309

/.? F FCR CCTOBER 1C89' Unit Maino YcnkCO 4, '

Dato:

03/N v/89 i

Completed By:

S. L. HALL i

Telephone:

207-622-4868 Page 1 of 1 i

Number 10-89-11 Date 891010 l

891011 p

.T l

I Type (1) ll P

Jl S

]

4 l

l l

Duration j

(Hours) l 13.2 123.1 f)

Reason (2) l F

B l

Method (3)

[

1 ll 4

j h

LER #

l 89-004 l

N/A

~

System Code (4)

SD CB l

Component Code (5)

VALVEX-B PUMPXX-B I

i i

~'

The unit was taken Scheduled Reactor off line due to Coolant Pump exceeding Tech.

Seals Outage.

The Specs. on a Typt C unit was returned Cause and Containment to 100% power.

Correctivo Leakage Rate Test.

Action The unit remained down for a planned RCP Seals Maintenance Outage.

1.

TYPE:

2.

REASON: (cont) 4.

SYSTEM CODE:

(F)orced F-Administrative Exhibit G-Instructions (S)cheduled G-Operational Error for Preparation of Data :

H-Other (Explain)

Entry Sheets for 2.

REASON Licensee Event Report A-Equipment Failure 3.

METHOD:

(LER) File (NUREG.0161)

B-Maintenance o'r Test 1-Manual C-Refueling 2-Manual Scram 5.

COMPONENT CODE:

D-Regulatory Restriction 3-Automatic Scram Exhibit I-Same source E-operator Training &

4-Other (Explain) an above.

License Examination 1.