Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19330C767 + (09:45:12, 31 December 2024)
- 05000327/LER-1980-114-03, /03L-0:on 800703,several Discrepancies Found During Support & Hanger Insp Between as-built & as-analyzed Configuration.Cause Not Stated.Deviations Which Could Cause Pipe Failure Were Modified + (09:45:14, 31 December 2024)
- AECM-80-183, Submits Revised Responses Per Discussions at Mechanical Engineering Branch & Bnwl 800708-10 Meeting to Resolve Draft SER Open Items.Addl Info Will Be Provided by Separate Ltr + (09:45:15, 31 December 2024)
- ML19330C762 + (09:45:17, 31 December 2024)
- 05000327/LER-1980-114, Forwards LER 80-114/03L-0 + (09:45:19, 31 December 2024)
- ML19330C758 + (09:45:20, 31 December 2024)
- ML19330C756 + (09:45:21, 31 December 2024)
- ML19330C757 + (09:45:21, 31 December 2024)
- ML19330C754 + (09:45:23, 31 December 2024)
- ML19330C753 + (09:45:24, 31 December 2024)
- 05000271/LER-1980-023-03, /03L:on 800712,snubber RR-78 on Recirculating Pump Motor B Was Found to Have No Visible Fluid in Sight Glass & Failed to Lock Up within Procedural Tolerances When Tested. Caused by Fluid Leakage.Lenz Fittings Were Replaced + (09:45:27, 31 December 2024)
- ML19330C748 + (09:45:30, 31 December 2024)
- 05000366/LER-1980-107-03, /03L-0:on 800719,during Routine Power Ascension, Determined That Method for Verifying Jet Pump Operability Not in Compliance W/Tech Specs.Caused by Inaccurate Method Re Calculating Delta P Variance.Method Revised + (09:45:31, 31 December 2024)
- ML19330C746 + (09:45:35, 31 December 2024)
- ML19330C745 + (09:45:36, 31 December 2024)
- 05000366/LER-1980-107, Forwards LER 80-107/03L-0 + (09:45:38, 31 December 2024)
- 05000271/LER-1980-023, Forwards LER 80-023/03L-0 + (09:45:40, 31 December 2024)
- ML19330C740 + (09:45:41, 31 December 2024)
- ML19330C738 + (09:45:42, 31 December 2024)
- ML19330C739 + (09:45:42, 31 December 2024)
- 05000293/LER-1980-037-03, /03L-0:on 800709,salt Svc Water Pump P208B Tripped on Thermal Overload.No Probable Cause Determined.Following Maint,Pump Tested & Returned to Svc Same Day + (09:45:44, 31 December 2024)
- ML19330C736 + (09:45:45, 31 December 2024)
- AECM-80-177, Interim Deficiency Rept Re Incorrectly Crimped Vendor Control Circuitry Terminations in ESF 4.16 Kv Bus.Scope of Investigation Being Expanded to Other Equipment Supplied by Ite Imperial.Final Rept Will Be Submitted by 801106 + (09:45:46, 31 December 2024)
- ML19330C735 + (09:45:46, 31 December 2024)
- ML19330C733 + (09:45:48, 31 December 2024)
- 05000293/LER-1980-037, Forwards LER 80-037/03L-0 + (09:45:50, 31 December 2024)
- ML19330C730 + (09:45:51, 31 December 2024)
- ML19330C728 + (09:45:52, 31 December 2024)
- ML19330C725 + (09:45:53, 31 December 2024)
- ML19330C726 + (09:45:53, 31 December 2024)
- 05000293/LER-1980-028-03, /03L-0:on 800621,during Routine check,off-gas Radiation Monitors Found Reading Low.Caused by Problems W/ off-gas Condenser Affecting Flow to off-gas Sample Rack. Sample Flow Adjusted + (09:45:55, 31 December 2024)
- B10045, Advises That Performance Capability Analysis Re Containment Purge Valves & Valve Operators,Performed by Allis Chalmers, Indicates No Basis for Blocking Valves & That Purge Valves Will Close within Tech Spec Limit.Rept Will Be Forwarded + (09:45:56, 31 December 2024)
- ML19330C721 + (09:45:58, 31 December 2024)
- ML19330C722 + (09:45:58, 31 December 2024)
- 05000293/LER-1980-028, Forwards LER 80-028/03L-0 + (09:46:00, 31 December 2024)
- ML19330C716 + (09:46:01, 31 December 2024)
- ML19330C718 + (09:46:01, 31 December 2024)
- 05000277/LER-1980-011-01, /01T-0:on 800714,during Training on Sys,Diesel Generator Cardox Sys Vapor Pilot Valve Found Closed. Cause Not Found.Valve Immediately Locked Open.Valve Also Added to Sys Checkoff & Locked Valve Lists + (09:46:08, 31 December 2024)
- 05000327/LER-1980-117-03, /03L-0:on 800706,1-LCV-3-148 Failed in Open Position.Investigation Revealed Bad Coil on Control Timer & Ground Located in 1-PS-3-148.Cause Not Stated.Coil Replaced, Ground cleared,1-PS-3-148 Recalibr & Sys Returned to Svc + (09:46:10, 31 December 2024)
- ML19330C712 + (09:46:11, 31 December 2024)
- ML19330C709 + (09:46:12, 31 December 2024)
- ML19330C710 + (09:46:12, 31 December 2024)
- 05000277/LER-1980-011, Forwards LER 80-011/01T-0 + (09:46:14, 31 December 2024)
- ML19330C706 + (09:46:15, 31 December 2024)
- ML19330C705 + (09:46:16, 31 December 2024)
- 05000327/LER-1980-117, Forwards LER 80-117/03L-0 + (09:46:18, 31 December 2024)
- ML19330C701 + (09:46:19, 31 December 2024)
- ML19330C702 + (09:46:19, 31 December 2024)
- 05000366/LER-1980-110-03, /03L-0:on 800722,during Normal Power Operation, Valve 2C11-F3006 Discovered Closed,Rendering Scram Discharge Vol High Level Rod Withdrawal Block Level Switch 2C11-N013E Inoperable.Caused by Personnel Valving Error + (09:46:21, 31 December 2024)
- BSEP-80-1290, RO 1-80-61:on 800802,while Performing Analysis of Pipe Supports on CRD Sys,Determined That Four Supports Outside & 12 Supports Inside Drywell Could Exceed Structural Integrity.Mods for Upgrade of Supports Are Underway + (09:46:22, 31 December 2024)
- 05000366/LER-1980-110, Forwards LER 80-110/03L-0 + (09:46:24, 31 December 2024)