Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19331B655 + (09:14:50, 31 December 2024)
- 05000346/LER-1980-055, Forwards LER 80-055/03L-0 + (09:14:52, 31 December 2024)
- ML19331B651 + (09:14:57, 31 December 2024)
- 05000285/LER-1980-014, Forwards LER 80-014/03L-0 + (09:14:58, 31 December 2024)
- ML19331B646 + (09:15:02, 31 December 2024)
- ML19331B645 + (09:15:03, 31 December 2024)
- AECM-80-170, Submits Addl Response to NRC Ltr Re Deficiency Noted in IE Insp Repts 50-416/80-07 & 50-417/80-06.Equipment to Complete Dredging Operation Has Not Been Available.Full Compliance Will Be Achieved by 800905 + (09:15:04, 31 December 2024)
- ML19331B643 + (09:15:07, 31 December 2024)
- ML19331B641 + (09:15:08, 31 December 2024)
- ML19331B640 + (09:15:09, 31 December 2024)
- 05000278/LER-1980-016-01, /01T-0:on 800717,reanalysis by Bechtel of as-built Piping Determined That Stresses on Snubber 3-10-GB-S-44 Exceeded Operability Criteria.Caused by Inadequate Design Due to as-built Condition & Seismic Analysis Info Variance + (09:15:10, 31 December 2024)
- ML19331B638 + (09:15:11, 31 December 2024)
- ML19331B637 + (09:15:12, 31 December 2024)
- ML19331B634 + (09:15:13, 31 December 2024)
- 05000278/LER-1980-016, Forwards LER 80-016/01T-0 + (09:15:14, 31 December 2024)
- 05000339/LER-1980-034-03, /03L-0:on 800711,during Mode 2 Operation,Leak from RCS Occurred in Excess of Tech Spec Limit.Caused by Packing Failure on Valve RHR-MOV-2700.Valve Repaired,Tested & Returned to Svc + (09:15:16, 31 December 2024)
- AECM-80-172, Interim Deficiency Rept Re Contact & Indication Malfunction of Series 20,Type PR-20 Electro Switches.Evaluation Incomplete.Determination of Reportability & Final Rept Will Be Sent by 801028 + (09:15:17, 31 December 2024)
- 05000320/LER-1980-028-03, /03L-0:on 800707,while Being Tested by Surveillance Procedure,Emergency Diesel Generator DF-X-1B Tripped on High Crankcase Pressure.Caused by Loose Hose Clamp Resulting in Crankcase Vacuum Loss + (09:15:20, 31 December 2024)
- ML19331B628 + (09:15:21, 31 December 2024)
- 05000324/LER-1980-039-03, /03L-0:on 800721,during Visual Insp of Accessible Snubbers on safety-related sys,PT-19.6.0.2-2,Bergen- Paterson snubber,2G41-12SS33 Found Missing Paddle Bushing. Cause Undetermined.Bushing Replaced + (09:15:23, 31 December 2024)
- 05000321/LER-1980-083-03, /03L-0:on 800713,w/reactor Mode Switch in Run Mode at Power Level of 2241 Mwt,Surveillance Procedure HNP-1-3103 Not Performed within Required Grace Period.Caused by Personnel Error.Surveillance Immediately Performed + (09:15:25, 31 December 2024)
- ML19331B625 + (09:15:26, 31 December 2024)
- 05000259/LER-1980-055-03, /03L-0:on 800708,during HPCI Special Instruction 4.5.E.1.d & E,Pdv 73-43 Failed to Operate Properly.Caused by Valve Stuck Closed Due to Loose Valve Guide.Valve Disassembled & Cleaned & Valve Guide Tightened + (09:15:27, 31 December 2024)
- 05000320/LER-1980-028, Forwards LER 80-028/03L-0 + (09:15:29, 31 December 2024)
- ML19331B621 + (09:15:31, 31 December 2024)
- 05000339/LER-1980-034, Forwards LER 80-034/03L-0 + (09:15:32, 31 December 2024)
- 05000324/LER-1980-039, Forwards LER 80-039/03L-0 + (09:15:40, 31 December 2024)
- ML19331B614 + (09:15:42, 31 December 2024)
- ML19331B611 + (09:15:43, 31 December 2024)
- ML19331B610 + (09:15:43, 31 December 2024)
- 05000321/LER-1980-083, Forwards LER 80-083/03L-0 + (09:15:48, 31 December 2024)
- 05000259/LER-1980-055, Forwards LER 80-055/03L-0 + (09:15:50, 31 December 2024)
- ML19331B602 + (09:15:53, 31 December 2024)
- ML19331B597 + (09:15:56, 31 December 2024)
- 05000321/LER-1980-085-03, /03L-0:on 800720,w/unit at 300 Mwt & O Mwe,Reactor Water Not Sampled & Analyzed for Chlorides & Ph.Caused by Personnel Oversight.Retraining Session for Responsible Employees Conducted + (09:15:58, 31 December 2024)
- ML19331B595 + (09:15:59, 31 December 2024)
- ML19331B594 + (09:16:00, 31 December 2024)
- ML19331B591 + (09:16:02, 31 December 2024)
- ML19331B590 + (09:16:03, 31 December 2024)
- ML19331B589 + (09:16:04, 31 December 2024)
- ML19331B588 + (09:16:05, 31 December 2024)
- 05000339/LER-1980-038-03, /03L-0:on 800717,results of Periodic Reactor Coolant Leak Rate Tests Showed Tech Spec Limit Exceeded. Caused by Flange Leak on a Reactor Coolant Protection Seal Injection Line Due to Relieving Tension on Flange Bolts + (09:16:06, 31 December 2024)
- ML19331B586 + (09:16:07, 31 December 2024)
- ML19331B584 + (09:16:08, 31 December 2024)
- 05000321/LER-1980-085, Forwards LER 80-085/03L-0 + (09:16:09, 31 December 2024)
- ML19331B581 + (09:16:10, 31 December 2024)
- ML19331B580 + (09:16:11, 31 December 2024)
- TXX-3173, Submits Corrections to 800725 Deficiency Rept TXX-3166. Verbally Reported Date Should Be 791115 Instead of 800229 + (09:16:12, 31 December 2024)
- 05000302/LER-1980-026-03, /03L-0:on 800714,while Performing SP-710 Rc Decay Heat Removal & Rc Makeup Sys Chemistry Surveillance Program, Chloride & Fluoride Concentrations Exceeded Limits.Caused by High Temp of Decay Heat Sys & Migration of Elements + (09:16:15, 31 December 2024)
- ML19331B577 + (09:16:16, 31 December 2024)
- ML19331B575 + (09:16:17, 31 December 2024)