Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19259C182 + (20:31:39, 3 January 2025)
- 05000366/LER-1979-044, /044-0 Has Been Voided + (20:32:19, 3 January 2025)
- ML19259C179 + (20:32:23, 3 January 2025)
- ML19259C178 + (20:32:24, 3 January 2025)
- ML19259C177 + (20:32:26, 3 January 2025)
- ML19259C176 + (20:32:28, 3 January 2025)
- ML19259C173 + (20:32:30, 3 January 2025)
- ML19259C172 + (20:32:31, 3 January 2025)
- ML19259C170 + (20:32:38, 3 January 2025)
- ML19259C169 + (20:32:40, 3 January 2025)
- ML19259C168 + (20:32:42, 3 January 2025)
- ML19259C166 + (20:32:43, 3 January 2025)
- TXX-2993, Forwards 790511 Update of FSAR Info Re Natural Gas & Oil Wells Surrounding Facility Site + (20:32:45, 3 January 2025)
- ML19259C163 + (20:32:59, 3 January 2025)
- ML19259C162 + (20:33:00, 3 January 2025)
- ML19259C161 + (20:33:01, 3 January 2025)
- ML19259C160 + (20:33:03, 3 January 2025)
- ML19259C158 + (20:33:04, 3 January 2025)
- 05000324/LER-1979-031-03, /03L-0 on 790510:while Performing Leak Rate Test, Discovered Four MSIVs Exceeded Leakage Rate.Caused by Cracks in Stellite.Disks Replaced.Valves Reassembled & Tested Satisfactorily + (20:33:09, 3 January 2025)
- 05000324/LER-1979-031, Forwards LER 79-031/03L-0 + (20:33:14, 3 January 2025)
- 05000309/LER-1979-013-03, /03L-0 on 790526:reactor Protecction Sys Channel D Low Flow Trip Bistabale Actuated at 24% Out of Spec in Nonconservative Direction.Caused by Defective Bistable.Spare Unit Installed & Calibr + (20:33:20, 3 January 2025)
- ML19259C152 + (20:33:23, 3 January 2025)
- 05000267/LER-1979-015-03, /03L-0 on 790507:during Routine Surveillance Testing,Setpoint of Pcrv Rupture Disc M-11702 Found to Be 826 Psig.Caused by Calibr Drift.Disc Recalbr + (20:33:30, 3 January 2025)
- ML19259C149 + (20:33:32, 3 January 2025)
- 05000309/LER-1979-013, Forwards LER 79-013/03L-0 + (20:33:35, 3 January 2025)
- 05000267/LER-1979-015, Forwards LER 79-015/03L-0 + (20:33:41, 3 January 2025)
- 05000267/LER-1979-016-01, /01T-0 on 790521:punch Gap of Pcrv Rupture Disc M-11702 Found Out of Tolerance W/Vendor Specs.Caused by Undocumented Change of Punch Gap Specs.Tolerances Returned to Original Specs + (20:33:52, 3 January 2025)
- 05000302/LER-1979-050-03, /03L-0 on 790510:count-rate Amplifier & Rate of Change Amplifier for Nuclear Source Range Instrument NI-2 Found Inoperable.Caused by Amplifiers Being Out of Tolerance Due to Instrument Drift.Amplifiers Recalbr & Returned to + (20:34:31, 3 January 2025)
- 05000267/LER-1979-016, Forwards LER 79-016/01T-0 + (20:35:06, 3 January 2025)
- ML19259C139 + (20:35:10, 3 January 2025)
- 05000336/LER-1979-012-01, /01T-0 on 790522:during Rise to 30% Power,Two of Four Linear Power Range Channels Found to Be Inoperable. Open Connections Found Between Detector Cables & Field Wiring.Caused by Connector Pins Pushed Into Connector + (20:35:46, 3 January 2025)
- 05000302/LER-1979-050, Forwards LER 79-050/03L-0 + (20:36:26, 3 January 2025)
- ML19259C135 + (20:36:31, 3 January 2025)
- ML19259C134 + (20:36:32, 3 January 2025)
- ML19259C133 + (20:36:33, 3 January 2025)
- 05000336/LER-1979-012, Forwards LER 79-012/01T-0 + (20:37:05, 3 January 2025)
- ML19259C130 + (20:37:10, 3 January 2025)
- ML19259C128 + (20:37:11, 3 January 2025)
- 05000324/LER-1979-034-03, /03L-0 on 790510:while Performing PT 20.3,primary Containment Isolation Valve Local Leak Rate Test Containment Isolation Valves Would Not Seat & Hold Pressure.Caused by Valve Bushing Wear.Valves Dissassembled & Bushings Repl + (20:37:50, 3 January 2025)
- ML19259C126 + (20:37:54, 3 January 2025)
- ML19259C125 + (20:37:56, 3 January 2025)
- 05000237/LER-1979-031-03, /03L-0 on 790509:crack Found on 2D1 Feedwater Emergency Spill to Condenser Line & Crack Located on Pipe to Condenser Weld.Caused by Mechanical Failure.Cracked Portion Removed & Rewelded + (20:38:27, 3 January 2025)
- 05000324/LER-1979-034, Forwards LER 79-034/03L-0 + (20:38:47, 3 January 2025)
- ML19259C120 + (20:38:50, 3 January 2025)
- ML19259C119 + (20:38:51, 3 January 2025)
- 05000306/LER-1979-016-03, /03L-0 on 790509:during Audit of Surveillance Program,Found That Reactor Vessel Injection Isolation Valve Test Sp 2159 Had Not Been Done.Caused by Failure to Enter Test on Computer Surveillance Schedule + (20:39:14, 3 January 2025)
- ML19259C117 + (20:39:16, 3 January 2025)
- ML19259C116 + (20:39:17, 3 January 2025)
- ML19259C114 + (20:39:21, 3 January 2025)
- 05000306/LER-1979-016, Forwards LER 79-016/03L-0 + (20:40:03, 3 January 2025)
- 05000250/LER-1979-016-03, /03L-0 on 790429:high Level Alarm Annunciated. Caused by Instrument Drift of Tech Spec Min & High Level Alarms & Digital Level Indicator Transducer.Instruments Recalibr + (20:40:12, 3 January 2025)