ML19259C128
| ML19259C128 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 06/05/1979 |
| From: | Eric Turner HOUSTON LIGHTING & POWER CO. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| Shared Package | |
| ML19259C129 | List: |
| References | |
| ST-HL-AE-346, NUDOCS 7906120390 | |
| Download: ML19259C128 (1) | |
Text
(
Houston r
company Electrichwer 3
ROBox 1700 Houston. Texas 77001 June 5, 1979
~
SFN: V-0540 ST-HL-AE-346 Director, Region IV Office of Inspection and Enforcement 611 Ryan Plaza Drive. Suite 1000 Arlingtor., Texas 76102
Dear Sir:
South Texas Project Units 1 & 2 Docket Nos. STN 50-498, STN 50-499 Final Report on the Reportable Deficiency Concernino Concrete Voids In the Unit 1 Reactor Containment Building The attached report is submitted pursuant to the requirements of 10 CFR 50.55(e)(3). On October 20, 1978, Houston Lighting and Power notitied your office of concrete voids behind the liner plate in the reactor building exterior wall. This final report provides a description of the deficiency, summary of the safety analysis and corrective actions taken to repair the voids and to prevent their recurrence.
Further questions should be directed to Mr. D. G. Barker, Manager, South Texas Project at (713) 676-8891.
Very truly yours,
~'
- L
,j
./
<2 E. A. Turner Vice President Power Plant Construction
& Technical Services LRJ:bf
~
Director, NRC Office of Inspection & Enforcement /
gl3 cc:
C. Thrash (hker & Botts) i-y i I R. Gordon Gooch (Baker & Botts)
J. R. Newman (Lowenstein, Newman, Reis, Axelrad & Toll)
D. G. Barker 990A 700 CCU7 C70 A. J. Granger R. A. Frazar 7 90612 0 37p J