MONTHYEARJAFP-99-0277, Monthly Operating Rept for Sept 1999 Fpr Ja FitzPatrick Nuclear Power Plant.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 Fpr Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0261, Monthly Operating Rept for Aug 1999 for Jafnpp.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Jafnpp.With JAFP-99-0236, Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with JAFP-99-0211, Monthly Operating Rept for June 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0181, Monthly Operating Rept for May 1999 for Jafnpp.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Jafnpp.With JAFP-99-0166, Monthly Operating Rept for Apr 1999 for Ja FitzPatrick Nuclear Plant.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Ja FitzPatrick Nuclear Plant.With JAFP-99-0142, Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0092, Monthly Operating Rept for Feb 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0011, Monthly Operating Rept for Dec 1998 for Ja FitzPatrick Nuclear Power Plant.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Ja FitzPatrick Nuclear Power Plant.With JAFP-98-0396, Monthly Operating Rept for Nov 1998 for Ja FitzPatrick Npp. with1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Ja FitzPatrick Npp. with JAFP-98-0360, Monthly Operating Rept for Oct 1998 for Ja FitzPatrick Nuclear Power Plant.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Ja FitzPatrick Nuclear Power Plant.With JAFP-98-0322, Monthly Operating Rept for Sept 1998 for Ja Fitzpatrick Nuclear Power Plant.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Ja Fitzpatrick Nuclear Power Plant.With ML20151X6891998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0264, Monthly Operating Rept for July 1998 for Ja FitzPatrick Nuclear Plant1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Ja FitzPatrick Nuclear Plant JAFP-98-0222, Monthly Operating Rept for June 1998 for Ja FitzPatrick Nuclear Power Plant1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0193, Monthly Operating Rept for May 1998 for Ja FitzPatrick Nuclear Plant1998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Ja FitzPatrick Nuclear Plant JAFP-98-0168, Monthly Operating Rept for Apr 1998 for Ja FitzPatrick Nuclear Power Plant1998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0128, Monthly Operating Rept for Mar 1998 for Ja FitzPatrick Nuclear Power Plant1998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0091, Monthly Operating Rept for Feb 1998 for JAFNPP1998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for JAFNPP JAFP-98-0058, Monthly Operating Rept for Jan 1998 for Ja FitzPatrick Nuclear Power Plant1998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0009, Monthly Operating Rept for Dec 1997 for Ja FitzPatrick Nuclear Power Plant1997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0474, Monthly Operating Rept for Nov 1997 for Ja FitzPatrick Nuclear Power Plant1997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0435, Monthly Operating Rept for Oct 1997 for Ja FitzPatrick Nuclear Power Plant1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0375, Monthly Operating Rept for Sept 1997 for Ja FitzPatrick Nuclear Plant1997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Ja FitzPatrick Nuclear Plant JAFP-97-0341, Monthly Operating Rept for Aug 1997 for Jfnpp1997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Jfnpp JAFP-97-0297, Monthly Operating Rept for Jul 1997 for Ja FitzPatrick Nuclear Power Plant1997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0242, Monthly Operating Rept for June 1997 for Ja FitzPatrick Nuclear Power Plant1997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0203, Monthly Operating Rept for May 1997 for Ja FitzPatrick Npp1997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Ja FitzPatrick Npp JAFP-97-0178, Monthly Operating Rept for Apr 1997 for Ja FitzPatrick Nuclear Power Plant1997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0126, Monthly Operating Rept for Mar 1997 for JAFNPP1997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for JAFNPP JAFP-97-0093, Monthly Operating Rept for Feb 1997 for James A. FitzPatrick Nuclear Power Plant1997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for James A. FitzPatrick Nuclear Power Plant JAFP-97-0056, Monthly Operating Rept for Jan 1997 for Ja FitzPatrick Nuclear Power Plant1997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0012, Monthly Operating Rept for Dec 1996 for Ja FitzPatrick Nuclear Power Plant1996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0476, Monthly Operating Rept for Nov 1996 for James A. FitzPatrick Nuclear Power Plant1996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for James A. FitzPatrick Nuclear Power Plant JAFP-96-0448, Monthly Operating Rept for Oct 1996 for Ja FitzPatrick Nuclear Power Plant1996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0401, Monthly Operating Rept for Sept 1996 for Jfnpp1996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Jfnpp JAFP-96-0352, Monthly Operating Rept for Aug 1996 for Ja FitzPatrick Nuclear Power Plant1996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0300, Monthly Operating Rept for Jul 1996 for Ja FitzPatrick Nuclear Power Plant1996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0275, Monthly Operating Rept for June 1996 for Ja FitzPatrick Nuclear Power Plant1996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0240, Monthly Operating Rept for May 1996 for Ja FitzPatrick Nuclear Power Plant1996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0196, Monthly Operating Status Rept for Apr 1996 for Ja FitzPatrick Nuclear Power Plant1996-04-30030 April 1996 Monthly Operating Status Rept for Apr 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0156, Monthly Operating Rept for Mar 1996 for Ja FitzPatrick Nuclear Power Plant1996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0113, Monthly Operating Rept for Feb 1996 for Ja FitzPatrick Nuclear Power Plant1996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0066, Monthly Operating Rept for Jan 1996 for JAFNPP1996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for JAFNPP JAFP-96-0023, Monthly Operating Rept for Dec 1995 for Ja Fitzpatrick Nuclear Power Plant1995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Ja Fitzpatrick Nuclear Power Plant JAFP-95-0535, Monthly Operating Rept for Nov 1995 for Jafnpp1995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Jafnpp JAFP-95-0486, Monthly Operating Rept for Oct 1995 for Ja FitzPatrick Nuclear Plant1995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Ja FitzPatrick Nuclear Plant JAFP-95-0444, Monthly Operating Rept for Sept 1995 for Ja FitzPatrick Nuclear Power Plant1995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Ja FitzPatrick Nuclear Power Plant JAFP-95-0413, Monthly Operating Rept for Aug 1995 for Ja Fitzpatrick Nuclear Power Plant1995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Ja Fitzpatrick Nuclear Power Plant JAFP-95-0372, Monthly Operating Rept for July 1995 for Ja FitzPatrick Nuclear Power Plant1995-07-31031 July 1995 Monthly Operating Rept for July 1995 for Ja FitzPatrick Nuclear Power Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARJAFP-99-0277, Monthly Operating Rept for Sept 1999 Fpr Ja FitzPatrick Nuclear Power Plant.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 Fpr Ja FitzPatrick Nuclear Power Plant.With ML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data JAFP-99-0261, Monthly Operating Rept for Aug 1999 for Jafnpp.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Jafnpp.With JAFP-99-0236, Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with ML20216D9541999-07-28028 July 1999 Safety Evaluation Authorizing Proposed Alternatives for Second 10-year Interval Pursuant to 10CFR50.55a(a)(3)(ii) ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept JAFP-99-0211, Monthly Operating Rept for June 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0175, Annual Summary of Changes,Tests & Experiments for 1997/1998. with1999-06-0202 June 1999 Annual Summary of Changes,Tests & Experiments for 1997/1998. with JAFP-99-0181, Monthly Operating Rept for May 1999 for Jafnpp.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Jafnpp.With JAFP-99-0166, Monthly Operating Rept for Apr 1999 for Ja FitzPatrick Nuclear Plant.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Ja FitzPatrick Nuclear Plant.With JAFP-99-0142, Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0092, Monthly Operating Rept for Feb 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Ja FitzPatrick Nuclear Power Plant.With ML20207E9311999-02-26026 February 1999 Part 21 Rept Re Sprague Model TE1302 Aluminum Electrolytic Capacitors with Date Code of 9322H.Caused by Aluminum Electrolytic Capacitors.Affected Capacitors Replaced ML20202J0891999-02-0303 February 1999 Safety Evaluation Accepting Rev 2 of Third Interval Inservice Testing Program for Pumps & Valves for James a FitzPatrick Nuclear Power Plant ML20199M0891999-01-22022 January 1999 Part 21 Rept Re Failure of Square Root Converters.Caused by Failed Aluminum Electrolytic Capacitory Spargue Electric Co (Model Number TE1302 with Mfg Date Code 9322H).Sent Square Root Converters Back to Mfg,Barker Microfarads,Inc JAFP-99-0011, Monthly Operating Rept for Dec 1998 for Ja FitzPatrick Nuclear Power Plant.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Ja FitzPatrick Nuclear Power Plant.With ML20198F9991998-12-0404 December 1998 Assessment of Licensing Basis for Use of Containment Overpressure Credit for Net Positive Suction Head Analyses Power Authority of State of New York,James a Fitzpatrick Nuclear Power Plant ML20196J3501998-12-0404 December 1998 SER Accepting License Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves JAFP-98-0396, Monthly Operating Rept for Nov 1998 for Ja FitzPatrick Npp. with1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Ja FitzPatrick Npp. with ML20196F9251998-11-25025 November 1998 Safety Evaluation Re Thrid 10-year Interval Inservice Insp Program Relief Requests for Plant ML20195J7521998-11-18018 November 1998 Rev 7 to Jaf Colr ML20195K4211998-11-17017 November 1998 Safety Evaluation Authorizing Proposed Alternative in Relief Request VRR-05 Per 10CFR50.55a(a)(3)(i) & PRR-01,PRR-02R1, PRR-03,PRR-04,VRR-02,VRR-03 & VRR-04 Per 10CFR50.55a(a)(3)(ii) ML20195E1051998-11-13013 November 1998 Safety Evaluation Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves, Issued 950817 ML20197G6221998-11-0606 November 1998 Non-proprietary Rev 7 to HI-971661, Licensing Rept for Reracking of Ja FitzPatrick Sfp ML20155H5321998-11-0303 November 1998 Safety Evaluation Authorizing Alternative to ASME Code Requirements for CRD Bolting ML20155H5801998-11-0303 November 1998 Safety Evaluation Authorizing Postponement of Beginning of Augmented Exam Requirements of 10CFR50.55a(g)(6)(ii)(A)(2) Re ASME Code,Section XI JAFP-98-0360, Monthly Operating Rept for Oct 1998 for Ja FitzPatrick Nuclear Power Plant.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Ja FitzPatrick Nuclear Power Plant.With ML20155C2821998-10-30030 October 1998 Non-proprietary Rev 0 to GENE-187-30-1598 Np, CRD Bolting Flaw Evaluation for Ja FitzPatrick Nuclear Power Plant ML20154L6591998-10-14014 October 1998 Safety Evaluation Accepting Licensee Proposed Alternative to Snubber Visual Inservice Exam Intervals & Sampling Rates Requirements Contained in ASME Code,Section Xi,Subsection Iwf,Article IWF-5000 JAFP-98-0322, Monthly Operating Rept for Sept 1998 for Ja Fitzpatrick Nuclear Power Plant.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Ja Fitzpatrick Nuclear Power Plant.With ML20153D2591998-09-21021 September 1998 SER Accepting Proposed Alternative Testing of Containment Following ECCS Suction Strainer Replacement ML20153B5611998-09-0101 September 1998 Rev 1 to JAF-SE-98-013, RHR & Core Spray Suppression Pool Suction Strainer Replacement ML20151X6891998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Ja FitzPatrick Nuclear Power Plant ML20237E8361998-08-25025 August 1998 Rev 6 to Colr ML20237E9471998-08-0808 August 1998 Rev 6 to Colr JAFP-98-0264, Monthly Operating Rept for July 1998 for Ja FitzPatrick Nuclear Plant1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Ja FitzPatrick Nuclear Plant ML20236X5881998-07-29029 July 1998 Safety Evaluation Supporting Amend 245 to License DPR-59 ML20236V8181998-07-29029 July 1998 Safety Evaluation Accepting Request for Relief from Implementation of Requirements of 10CFR50.55a Related to Containment Repair & Replacement Activities for James a FitzPatrick Nuclear Power Plant ML20153B5781998-07-28028 July 1998 Rev 0 to JAF-SE-98-025, HPCI & RCIC Suppression Pool Suction Strainer Replacement ML20236X3831998-07-14014 July 1998 Rev 2 to JAF-RPT-MULTI-02671, Summary of Detailed Evaluation for NRC Generic Ltr 96-06 ML20154L9201998-07-10010 July 1998 SER Accepting Rev to Reactor Vessel Surveillance Capsule Withdrawal Schedule for James a Fitzpatrick Nuclear Power Plant JAFP-98-0222, Monthly Operating Rept for June 1998 for Ja FitzPatrick Nuclear Power Plant1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0193, Monthly Operating Rept for May 1998 for Ja FitzPatrick Nuclear Plant1998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Ja FitzPatrick Nuclear Plant ML20248F3531998-05-21021 May 1998 Part 21 Rept Re Electronic Equipment Repaired or Reworked by Integrated Resources,Inc from Approx 930101-980501.Caused by 1 Capacitor in Each Unit Being Installed W/Reverse Polarity. Policy of Second Checking All Capacitors Is Being Adopted JAFP-98-0168, Monthly Operating Rept for Apr 1998 for Ja FitzPatrick Nuclear Power Plant1998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0128, Monthly Operating Rept for Mar 1998 for Ja FitzPatrick Nuclear Power Plant1998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Ja FitzPatrick Nuclear Power Plant ML20217A4631998-03-23023 March 1998 Safety Evaluation Accepting Use of Three Heats/Lots of Hot Rolled XM-19 Matl in Core Shroud Repair Assemblies Re Licenses DPR-16 & DPR-59,respectively JAFP-98-0091, Monthly Operating Rept for Feb 1998 for JAFNPP1998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for JAFNPP ML20202G9081998-02-0606 February 1998 Safety Evaluation Re Amend to License DPR-59 to Revise TS Tables 3.2-2 & 4.2-2 JAFP-98-0058, Monthly Operating Rept for Jan 1998 for Ja FitzPatrick Nuclear Power Plant1998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Ja FitzPatrick Nuclear Power Plant 1999-09-30
[Table view] |
Text
'
OPERATLNG DATA REPORT
~
DOCKET NO. 50-333 ]
DATE Jt'"e 1979 s COMPLETED BY E. ZufeIt TELEPflONE 115 342-3840 OPERATING STATUS Notes -
- 1. Unit Name: FitzPatrick .
- 2. Reporting Period: 790501 - 790531
- 3. Licensed Thermal Power (MWt): 2436
- 4. Nameplate Rating (Gross MWe): 883
- 5. Design Electrical Rating (Net MWe): 821
- 6. Maximum Dependable Capacity (Gross MWe): 830
- 7. Maximum Dependable Capacity (Net MWe): 800
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since last Report, Give Reasons:
None
- 9. Power Level To Which Restricted,if Any (Net MWe): None
- 10. Reasons For Restrictions,1f Any: Plant in cold shutdown in accordance with the NRC "Show Cause" Order of March 13, 1979 His Month Yr.-to-Date Cumularise i1. liours In Reporting Period 744 3623 33696
- 12. Number Of 11ours Reactor Was Critical 0 1767 3 23829.5
- 13. Reactor Reserve Shutdown liours n 0 0
- 14. Ilours Generator On-Line 0 1767.3 21054.4
- 15. Unit Reserve Shutdown Ifours 0 0 0
- 16. Gross Thermal Energy Generated (MWii) 0 3626160 LERLntnR
- 17. Gross Electrical Energy Generated (MWil) 0 1235720 15530590
- 18. Net Electrical Energy Generated (MWif) 0 1198435 15024420
- 19. Unit Service Factor 0 48.8% g,R_Lt
- 20. Unit Availability Factor 0 48.8% 68.4%
- 21. Unit Capacity Factor (Using MDC Net) 0 41.3% 62.6%
- 22. Unit Capacity Factor (Using DER Net) 0 40.3% 54.3%
- 23. Unit Forced Outage Rate 100 t 51.2% 16.0%
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date,and Duration of Eachl:
None Unknown-Pending completion of Pipe _
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: S tress Reanalys is
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 2284 352 790612037,.
J
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-333 ;
UNIT JAFNPP ]
DATE June 1979 CON 1PLETED BY E. Zufel t TELEPHONE O: 5)342-3840 0 M O N'III MAY 1979 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (SIWE-Net) (SIWE-Net)
I O 37 0 2 0 18 0 3 0 19 0 4 0 0 20 5 0 21 0 6 0 22 0 7 n 23 0 8 0 24 0 9 0 25 0 10 0 0 26 11 0 27 0 13 0 0 28 13 0 0 29 14 0 0 30 15 0 3j 0 16 0
SUMMARY
Unit continues to remain in cold shutdown condition in accordance with the NRC ~~
"Show Cause" order of March 13, 1979 2284 .353
DOCKET NO. 50-333 ,
UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT NAME JAFNPP DATE June 1979 COMPLETED BY E. Zufelt REPORT MONT11 MAY 1979 315 342-3840 TELEPlf0NE
, s
= r. 1 we g '.
~~., .E _ta E 2 E ~4 Licensee g v., g "'., Cause & Corrective N. . . Date g 3g g jg5 Event :s 7 'E Action to
$3 5 j i5 y Repori
- N0 0 Prevent Recurrence 5
5 790315 F 744 D 4 79-014 22 222222 Continuing Re-Evaluation of Stress Calculation and to make modification if required (Cumulative Hours to Date-1855.7)
I 2 3 4 F: Forced Reason : Method:
N S: Scheduled Exhibit G -Instructions A Equipment Failure (Explain) 1 Manual for Preparation of Data N B Maintenance of Test Q 2 Manual Scram. Entry Sheets for Licensee C Refueling 3 Automatic Scram. Event Report (LER) File (NbREG-A D Regulatory Restriction 4-Other (Explain) 0161)
E Operator Training & License Examination v- F Administrative 5 trl G-Operational Error (Explain) Exhibit I Same Source A Il-Ot her (Explain)
, l's k l .. ,
POWER AUTil0RITY OF TifE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT ,
Safety Related Electrical 6 liechanical Maintenance Summary DATE WORK REQUEST 4 REPAIR SYSTEM 110W DETECTED CAUSE OF MALFUNCTION COMPONENT # ACTION TAKEN TO PRECLUDE RECURRENCE TIME HOURS 1484 1 May 70 70RWC-2A & B OPS Units would not run. Added oil and refrigeration gas. 24 1443 3 May 46 S-SA OPS Cover leak. Tighten cover. 2 970 9 May 10 RHR Condensate OPS Crack in pipe where con- Repaired crack (MPT-16) 666' Flush ~Line densate transfer ties into "A" RHR Line 1471 14 May 01-125 M0V's NA NRC IE Circular 79-04 Inspect stem locking nuts on valve motor-operators. 8 104 11 May 29 29A0V 86A LLRT Seat leakage Repaired seat and disc 417 967 & 1410 14 May 93 AC-B1 OPS Compressor fails to load Cleaned Relief Valve and unloader Assembly 3 1191 14 May 10 MOV-25A MAINT Valve operator stem cap Cleaned hub and replaced stem cap.
not installed. 2 N 1285 ,
N 15 May 10 FE-108A OPS Flange leek during Hydro Tighten Fla..ge 20 OC D '
12322 16 May 10 10SSB OPS Strainer will not shif t Repaired shift linkage U1 32 g.'3 12366 16 May 10 10SSA & B OPS Requested to clean Cleaned Strainer strainers ti ( ! .. ,
POWER ALTril0RITY OF TiiE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical f Mechanical Maintenance Summary DATE WORK REQUEST # REPAIR SYSTEM 110W DETECTED CAUSE OF MALFUNCTION COMPONENT # ACTION TAKEN TO PRECLUDE RECURRENCE TIME Il0URS 1279 17 May 03 HCU 14-47 OPS Leak at pipe thread in Disasembled and retaped pipe nipple 6 base of N2 flask 1747 l9 May 76 CO 2 Pan 07 SURV. CO2 alarm bell timer motor Adjusted timer motor spc.ed and cams b out of adjustment 800 23 May 76 76-P-1 NA Preventive Maintenance Performed Preventive Maintenance 26' 11257 23 May 76 76-P-1 OPS Head gaskets leaking Evaluated by Vendor Representative as normal 0 1701 25 May 93 EDG A OPS Air relay valves seat Disassembled and cleaned leak 6 1455
!9 May 71 BUS 10500 NA Preventive Maintenance Performed Preventive Maintenance (Breakers, Switchgear, 60 Loads, Switches) 1430
,9 May 46 H46-342 VISUAL INSPECT- Hanger rod disconnected Re-installed nut and washer g 10N from pipe clevis 12 30 May 23 H-23-12 & 13 NA Nameplate data requested Provided Nameplate data '
6 341 .'
c 31 May 29 29 A0V 808 OPS Valve actuator has an air Repacked air cylinder
(_n leak 32 Ch
't 8 A
, P t 'I
j POWER AUTil0RITY OF Tile STATE OF NEW YORK JAMES A. FITZPATRICK NbCLEAR POWER PLANT Safety Related Electrical 6 Mechanical Maintenance Summary DATE WORK REQUEST # REPAIR SYSTEM 110W DETECTED CAUSE OF MALFUNCTION COMPONENT # ACTION TAKEN TO PRECLUDE RECURRENCE TIME 110URS 1422 31 May 14 H 14-4 VISUAL Hanger Rod bent and needs Hanger Rod tightened tightening 2 31 May 14 1420 H-14-7 VISUAL Loose anchor bolt in base Total regrout beneath base plate and plate preload 139 1496 30 May 46 MSK 1666 Mode VISUAL Loose bolt in base plate Tightened bolt Pt. I 25 1493 30 May 10 H 10-114 VISUAL Loose anchor bolt Tightened fastener 221 t
IM C33 '
A v.
C N
Ii k i l '.. .,
JAMES A. FITZPATRICK NUCLEAR POWER PUJiT '
Maintenance Summary .
1 & C - May 1979 Date System W rk Request #
llow Detected Cause of Results of Action taken to Repair Component # Malfunction Malfunction Preclude Time Recurrence (llours) 02-3-1328 Installed temp.pos er 5-11-79 LR-97 until 500 Bus 02-3 02-3 L1-91 J0PS Loss of Power No indication restored 4.0 02-3-1127 5-15-79 02-3 02-3 LIS-720 JIC Drift Setpoint incorrect F-ISP-3-2 4.0 02-3-1715 Installed temp.
5-25-79 02 LR-97 power unti1 500 02-1 Li-41 J0PS Loss of Power No Indication Bus restored 6.0 07-1270 5-26-79 07 SRM-D TS Age Calibration neede( IMP 7.1/7.2 20.0 07-1267 Bad LPRM APRM reads 5-26-79 07 - "B" APRM OPS36-138 z 7% when S/D Bypassed LPRM 18.0 07-1251 5-26-79 07 SRM B,C,0 OPS Age Calibration needec IMP 7.1/7.2 80.0 10-1405 5-11-79 10.0 10-LS-106A OPS Short Circuit No Annun. Repaired 4.0 10-1293 5-16-79 10 10-LS-100 OPS Short Circuit No Innun. Reoaired in_n N 11-1387 N Bubbler Air Flow CD 5-4-79 11 11-LT-45 OPS Unknown erratic ISP-82 12.0 16-1-1289 LubrietM and
" 5-16-79 16-1 16-1-DPIT-101 ISC Loose Chain Ln Failed ISP tightened chain 36.n cn 93-12601 Will not 5-15-79 93 93-PS-10A IEC Age calibrate Replaced 10.0 99-867 5-17-79 99 CR Sec Console SEC Dirt improper Control Cleaned 1.0 li b ! .. ,
}
JAMES A. FITZPATRICK NUCLEAR POWER PLANT
- Maintenance Summar-1 & C - MAY 1979 Date System W rk Request # Cause of Results of component # llow Detected Action taken to Repair Malfunction Malfunction Preclude Time Recurrence (!!ours)99-871 5-17-79 99 CR Terminet Won't print Cleaned SEC Dirt 7.0 99-865 Poor picture at 5-24-79 99 Camera #1 SEC Age /Drlft 0}gljt Calibrated 10.0 17-1364 5-9-79 17 17-RR-456 OPS Drift Needed calibration Calibrated 4.0 1407 Bad tolerances & Changed ST toleran :es 5-18-79 17 17-RIS-459 OPS Drift Failed ST. & calibrated 28.0 76-1360 5-9-79 76 PNL-2 OPS Unknown No Alarm Light Found okay 10.0 76-1264 Calibrated as per 5-18-79 76 10 Ton Level l&C Drift ISP Failed .
ISP 4.0 99-872 5-10-79 99 #1 Camera SEC Drift Adjusted Fuzzy Picture 8.0 99-875 -
5-14-79 99 Door 217/209 SEC Door Latches Constant Alarm Repaired 16.0 99-876 Door will not 5-14-79 99 Security Door SEC Unknown unlock Found okay 1.0
.{ 27-577 .
Repaired & re-5-9-79 27 27-RR-1048 OPS Use Sticks calibrated 15.0 27-1286 5-21-79 27 27-PT-101A/102A l&C Drift OR 79-070 ISP 4-4 6.0 27-1257 5-23-79 27 27-DPIS-110A/B IEC Procedure wrong OR 79-074 ISP-89 0 ts V d r.,
j JAMES A. FITZPATRICK NUCLEAR POWER PLANT .
Maintenance Summary 16C - MAY 1979 Date W rk Request # Cause of Results of System Component #
llow Detected Action taken to Repair Malfunction Malfunction Preclude Time Recurrence (flours) 27-1692 5-27-79 27 27-R-102 OPS Dirt Sticky Cleaned 8.0 t
e N
CD 4
G4 Ch O
l& I, 6 3 '* e ,