Forwards Addl Revisions & Relief Requests to Inservice Pump & Value Testing Program.Revisions Are Based on Review of Facility Design for Compatability W/Asme Section XI Requirements
ML19259C135
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 06/04/1979
From: Gilleland J
TENNESSEE VALLEY AUTHORITY
To: Ippolito T
Office of Nuclear Reactor Regulation
References
NUDOCS 7906120398
Download: ML19259C135 (7)


Text

  • '

d TENNESSEE VALLEY AUTHORITY CHATTANCOGA. TENNESSEE 37 4o1 500C Chestnut Street Tower II

'Jts 41979 j

Director of Nuclear Reactor Regulation Attention:

Mr. Thomas A. Ippolito, Chief Branch No. 3 Division of Operating Reactors U.S. Nuclear Regulatory Comission Washington, DC 20555

Dear Mr. Ippolito:

In the Matter of the

)

Docket No. 50-296 Tennessee Valley Authority

)

Enclosed for your review are additional revisions and relief requests to the inservice pump and valve testing program for Browns Ferry Nuclear Plant unit 3 as submitted by my letters to you dated September 29, 1978, November 22, 1978, January 29, 1979, and March 6, 1979. These revisions are based on our further review of the Browns Ferry design for compatibility with ASME Section XI requirements.

We respectfully request that your staff complete their review of the proposed program as soon as practicable. We will be pleased to assist your staff in any manner possible in order to expedite the program review and approval.

Very truly yours, f

HC J. E. G111 eland Assistant Manager of Power Enclosure 2284 20-b ok\\

An huat Occc *umty Ercicy r 7906120

]

ENCLOSURE - Revised pages 1 and 7 from the table of valves to be cycled. - Additional request for relief PV-33 2284 221 9

ATTACHMEITI 1 2

2284 322 a

m.

SYS mt vat.vE CATECORY. TEST FREOt!ENCY TYPE OF TEST __

Main Steam 1-14 A

Q

. Full Cycic 1-15 A

Q Full Cycle 1-26 A

Q Full Cycle 1-27 A

Q Full Cycle 1-37 A

Q Full Cycle

-j 1-38 A

Q Full Cycle 1-51 A

Q Full Cycle 1-52 A

Q Full Cycle Me ets IW-3 510.

~

Operating cycle Meets ItN-3510 (Relief valves) 1-5 C

Operating Cycle Meets IW-3510 1-18 C

Operating Cycle Meets IW-3510 1-19 C

Operating Cycle Meets IW-351n 1-22 C

Operating Cycle Meets IW-3510 1-23 C

Operating Cycle Meets ItN-mu 1-30

  • C Operating Cycle Meets Itr,-3510 1-31 C

operating Cycle Meets I.N-351n 1-34 C

Operating cycle Meets IW-3510 1-41 C

Operating Cycle Meets IW-151n 1 C Operating Cycle Meets IW-3510 1-501 C

Operating Cycle Meets IW-3510 1-537 C

Operating cycle Feedwater 3-554 AC Cold Shutdown Full Cycle (Check Valves) 3-558 AC Cold Shutdewn Full Cycle 3-568 AC Cold Shutdown Full Cycle 3-572 AC Cold Shutdown Full Cycle RHRS*J 23-34 B

Q Meets N V-3410 (b)(1) 23-40 B

Q Meets N V-3410 (b)(1) 23-46 B

Q Meets NV-3410 (b)(1)

Q Meets N V-3410 (b)(1)

_23-52

... _. B........23-502 C

Q Full Cycle RHRS'J (Check Valves)23-506 C

Q Full Cycle 23-522 C

Q Full Cycle 23-526 C

Q Full Cycle 23-542 C

Q Full Cycle

,3-546 C

Q Full Cycle 23-561 C

Q Full Cycle 23-565 C

Q Full Cycle 23-579 C

Q Full Cycle 23-580 C

Q Full Cycle 23-581 C

Q Full Cycle 23-582 C

Q Full Cycle 23-591 C

Q Full Cycle 23-594 C

Q Full Cycle 23-597 C

Q Full Cycle Q

Full Cycle 23-583 C

  • 0ne-half of these valves will be tested each refueling outage. Refer to request for relief PV-9.

2284 223 __

, SYST". !

VAL'/C CATECO RY TEST ?PIO'JE :CY T(PE OF TEST None Core Spray 75-1 E

None (Locked 75-8 E

None Valves) 75-17 E

None

' I 75-18 E

~~

None 75-27 E

None 75-29 E

None 75-36 E

None 75-38 E

75-45 E

None None 75-46 E

None 75-55 E

None 75-10 E

Recirculation Loops 68-3 B

Cold Shutdown Full Cycle 68-79 B

Cold Shutdown Full Cycle CRD F.ydraulic 85-39A-(1-185)B 10% of valves every Full Cycle System 85-393-(1-lS5)B 16 weeks, valves Full Cycle also cycle during any unit scram, all valves also tested each refueling outage Floor and 77-2A A

Q Full Cycle Equipment 77-2B A

Q Full Cycle Drains77-15A A

Q Full Cycle 77-113

.A

.-Q.--

- Fall Cycle

-e

.e..

2284

24 9

e e e.e ene m- -

r

-5 ATIACHMENT 2 2284 325 k

3

~~

REQUEST FOR RELIEF PV-33 System All systems Test Requirement Analysis of test data within 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> per IWP - 1220.

Basis for Relief Due to the time involved in processing surveillance instructions to the reviewer and the possibility of weekends and/or holidays falling between running tests and completely reviewing the results, 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> is impractical.

Alternate Testing Pump parameters of flow rate and differential pressure will be reviewed immediately af ter the test to vetify that they do not fall within the " Required Action Range" of Table IWP-3100-2. Complete analysis of test data will be performed within 4 working days of the test.

e