Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000259/LER-1979-026, Forwards LER 79-026/03L-0 + (19:45:09, 3 January 2025)
- ML19259D696 + (19:45:11, 3 January 2025)
- ML19259D695 + (19:45:17, 3 January 2025)
- ML19259D694 + (19:45:19, 3 January 2025)
- 05000247/LER-1979-022-03, /03L-0:on 790913,amount of Water in Condensate Storage Tank Was 60,000 Gallons Below Tech Spec Requirement. Caused by Efforts to Reduce High Sodium Concentration in Hot Well + (19:45:24, 3 January 2025)
- 05000293/LER-1979-039-01, /01T-0:on 791009,re-analysis of safety-related Sys Indicated as-built Configuration Would Not Remain Functional During Sse.Caused by Design Error.Three Supports Have Been Modified & Sys Is Normal + (19:45:28, 3 January 2025)
- 05000278/LER-1979-030-01, /01T-0:on 791002,rigid Hanger Failed Due to Contact Between Two of Four Bolts & Base Plate.Caused by Improper Installation.Two shell-type Bolts Were Replaced W/ wedge-type Bolts & Plate Washers Were Installed + (19:45:31, 3 January 2025)
- ML19259D690 + (19:45:35, 3 January 2025)
- ML19259D689 + (19:45:36, 3 January 2025)
- 05000247/LER-1979-022, Forwards LER 79-022/03L-0 + (19:45:40, 3 January 2025)
- 05000293/LER-1979-039, Forwards LER 79-039/01T-0 + (19:45:44, 3 January 2025)
- 05000278/LER-1979-030, Forwards LER 79-030/01T-0 + (19:45:47, 3 January 2025)
- ML19259D682 + (19:45:49, 3 January 2025)
- ML19259D680 + (19:45:50, 3 January 2025)
- 05000219/LER-1979-034-01, /01T-0:on 791008,both Personnel Access Air Lock 15ors of Reactor Bldg Were Simultaneoulsy Open.Caused by Contractor Personnel Disconnecting Automatic Closing Device on One Door.Device Reconnected + (19:45:56, 3 January 2025)
- 05000219/LER-1979-034, Forwards LER 79-034/01T-0 + (19:46:00, 3 January 2025)
- ML19259D674 + (19:46:03, 3 January 2025)
- ML19259D673 + (19:46:05, 3 January 2025)
- ML19259D672 + (19:46:07, 3 January 2025)
- ML19259D671 + (19:46:09, 3 January 2025)
- ML19259D669 + (19:46:11, 3 January 2025)
- ML19259D667 + (19:46:13, 3 January 2025)
- ML19259D665 + (19:46:16, 3 January 2025)
- ML19259D664 + (19:46:17, 3 January 2025)
- ML19259D663 + (19:46:18, 3 January 2025)
- ML19259D662 + (19:46:19, 3 January 2025)
- ML19259D660 + (19:46:20, 3 January 2025)
- ML19259D659 + (19:46:23, 3 January 2025)
- 05000302/LER-1979-092-03, /03L-0:on 790925,in Mode 1,Halon Recirculation Fans FSF-1 & FSF-2 Failed to Start During Functional Test. Caused by Faulty Design Which Rendered Motor Overloads Inadequate for Fan Operating Characteristics + (19:46:26, 3 January 2025)
- ML19259D656 + (19:46:29, 3 January 2025)
- ML19259D655 + (19:46:30, 3 January 2025)
- ML19259D654 + (19:46:34, 3 January 2025)
- ML19259D653 + (19:46:42, 3 January 2025)
- ML19259D652 + (19:46:45, 3 January 2025)
- 05000302/LER-1979-092, Forwards LER 79-092/03L-0 + (19:47:19, 3 January 2025)
- ML19259D649 + (19:47:21, 3 January 2025)
- ML19259D648 + (19:47:22, 3 January 2025)
- ML19259D647 + (19:47:23, 3 January 2025)
- ML19259D646 + (19:47:26, 3 January 2025)
- ML19259D645 + (19:47:31, 3 January 2025)
- ML19259D644 + (19:47:33, 3 January 2025)
- ML19259D642 + (19:47:35, 3 January 2025)
- ML19259D641 + (19:47:36, 3 January 2025)
- ML19259D640 + (19:47:38, 3 January 2025)
- ML19259D637 + (19:47:46, 3 January 2025)
- ML19259D636 + (19:47:47, 3 January 2025)
- ML19259D635 + (19:47:49, 3 January 2025)
- ML19259D634 + (19:47:51, 3 January 2025)
- ML19259D633 + (19:47:52, 3 January 2025)
- ML19259D632 + (19:48:01, 3 January 2025)
- ML19259D631 + (19:48:02, 3 January 2025)