Notifies That Reviews of Electrical Power Sys Have Already Been Completed & Were Transmitted to NRC Per 770808,24 & s
ML19259D662
Person / Time
Site: Pilgrim
Issue date: 10/16/1979
From: Mcguire P
BOSTON EDISON CO.
To: Gammill W
Office of Nuclear Reactor Regulation
References
79-208, NUDOCS 7910260208
Download: ML19259D662 (1)


Text

.

BOSTON E:DISON COMPANY GENERAL oFriCEs 800 BovLaTON STREET 80sTON MASEACHUSETTS o2199

3. C ARL ANDOGNINI SUPERINTENDENT NUCLE AR QPER ATIONS DEPARTMENT October 16, 1979 BECo Lt:. #79-208 Mr. William Gammill, Acting Assistant Dircctor fot Operating Reactors Projects Division of Operating Reactors U.S. Nuclear Regulatory Commission Washington, D. C.

20555 License No. DPR-35 Docket No. 50-293 Information on Adequacy of Station Electric Distribution System Voltages

Dear Sir:

In a letter dated August 8,1979, you required all licensees to review the electric. power systems at each of their nuclear power plants.

Included in the letter were specific areas of concern which were to be reviewed and re-sponded to.

Please be advised that these reviews have already been completed by Boston Edison Company for Pilgrim Nuclear Power Station Unit I and were transmitted to the Nuclear Regulatory Commission via the following correspondence:

Letter to Mr. D. K. Davis f rom Mr. G. C. anwgnini dated August 8, 1977, BECo letter #77-77 Letter to Mr. D. K. Davis from Mr. J. E. Howard, dated August 24, 1977, BECo letter 177-85 Letter to Mr. T. A. Ippolito from Mr. G. C. Andognini, dated September 27, 1979, BECo letter #79-185 Should you have any further questions or concerns on this matter, please do not hesitate to contact us.

Very truly yours, 1211 355 4