Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19260D211 + (17:49:28, 3 January 2025)
- ML19260D210 + (17:49:30, 3 January 2025)
- ML19260D209 + (17:49:32, 3 January 2025)
- ML19260D208 + (17:49:34, 3 January 2025)
- ML19260D207 + (17:49:36, 3 January 2025)
- ML19260D206 + (17:49:37, 3 January 2025)
- ML19260D205 + (17:49:39, 3 January 2025)
- ML19260D203 + (17:49:51, 3 January 2025)
- ML19260D202 + (17:49:52, 3 January 2025)
- ML19260D201 + (17:49:54, 3 January 2025)
- ML19260D199 + (17:49:55, 3 January 2025)
- PNO-III-79-063, on 791214,ASME Nuclear Survey Team Completed Review of Util QA Manual to Determine If Interim Authorization Should Be Issued.Manual Found to Be Unacceptable.Resurvey of Manual Will Be Conducted on 791217 + (17:50:00, 3 January 2025)
- ML19260D197 + (17:50:01, 3 January 2025)
- ML19260D196 + (17:50:03, 3 January 2025)
- PNO-III-80-013, on 800117,bushing Failed on Reserve Auxiliary Transformer,Causing Loss of Power,Turbine Trip & Reactor Trip.Plant Brought to Hot Shutdown.Natural Convective Cooling Established.No Indication of Leakage + (17:50:05, 3 January 2025)
- ML19260D194 + (17:50:07, 3 January 2025)
- ML19260D192 + (17:50:09, 3 January 2025)
- ML19260D191 + (17:50:10, 3 January 2025)
- ML19260D190 + (17:50:11, 3 January 2025)
- ML19260D188 + (17:50:13, 3 January 2025)
- ML19260D189 + (17:50:13, 3 January 2025)
- ML19260D187 + (17:50:15, 3 January 2025)
- ML19260D186 + (17:50:16, 3 January 2025)
- ML19260D184 + (17:50:17, 3 January 2025)
- ML19260D183 + (17:50:18, 3 January 2025)
- ML19260D181 + (17:50:20, 3 January 2025)
- ML19260D180 + (17:50:21, 3 January 2025)
- ML19260D179 + (17:50:22, 3 January 2025)
- ML19260D178 + (17:50:23, 3 January 2025)
- ML19260D176 + (17:50:23, 3 January 2025)
- ML19260D174 + (17:50:25, 3 January 2025)
- ML19260D173 + (17:50:26, 3 January 2025)
- ML19260D172 + (17:50:33, 3 January 2025)
- ML19260D171 + (17:50:34, 3 January 2025)
- ML19260D170 + (17:50:36, 3 January 2025)
- ML19260D169 + (17:50:38, 3 January 2025)
- ML19260D168 + (17:50:40, 3 January 2025)
- ML19260D167 + (17:50:42, 3 January 2025)
- ML19260D166 + (17:50:44, 3 January 2025)
- ML19260D164 + (17:50:47, 3 January 2025)
- ML19260D163 + (17:50:51, 3 January 2025)
- ML19260D161 + (17:50:53, 3 January 2025)
- PNO-II-79-037, on 791203,while Preparing Workable Climate for Const Personnel in Fuel Bldg Area,Gasoline Overflowed from Heater Drip Pan to Floor & Three Workers Treated for Fume Exposure.Heaters Removed,Gasoline Mopped Up + (17:50:59, 3 January 2025)
- PNO-II-79-036, on 791202,leak from Condensate Storage Tank Spilled Water Onto Ground Surrounding Transfer Pump.Probably Less than 10 Uci,Excluding Tritium,Released.Pump Isolated. Design Changes Will Be Implemented to Contain Such Leaks + (17:51:04, 3 January 2025)
- PNO-II-79-035, on 791202,reactor Tripped on High Flux Level. Caused by Failure in electro-hydraulic Control Sys Resulting in Turbine Control Valve Closure & Pressure Spike.Regulator Repaired & Reactor Repaired + (17:51:08, 3 January 2025)
- PNO-I-79-030, on 791205,while Disconnecting Dewatering Vacuum Hose,Two Workers Sprayed W/Contaminated Resin Beads.Measured 3,000-3,500 Dpm on One Worker.Worker Decontaminated & Eyes Examined.Dewatering Procedure Will Be Reviewed + (17:51:13, 3 January 2025)
- ML19260D156 + (17:51:14, 3 January 2025)
- ML19260D155 + (17:51:15, 3 January 2025)
- ML19260D154 + (17:51:18, 3 January 2025)
- IR 05000301/1979020 + (17:51:21, 3 January 2025)
- ML19260D150 + (17:51:24, 3 January 2025)