Text
[g,p***ou UNITED STATES o,,
NUCLEAR REGULATORY COMMISSION S'T" R M #7:1
' r, g
5 r
REGION lil O
799 ROOSEVELT ROAD s
GLEN ELLYN, ILLINOIS 60137
%9.....,o JAN9 1980 State of Illinois Department of Public Health ATTN:
Mr. Gary N. Wright, Chief Division of Nuclear Safety 535 West Jefferson Street Springfield, IL 62761 Gentlemen:
The enclosed IE Information Notice No. 80-01 titled " Fuel Handling Events" was sent to the following licensees on January 4, 1980.
American Electric Power Service Corporation Indiana and Michigan Power Company D. C. Cook 1, 2 (50-315, 50-316)
Cincinnati Gas & Electric Company Zimmer (50-358)
Cleveland Electric Illuminating Company Perry 1, 2 (50-440, 50-441)
Commonwealth Edison Company Braidwood 1, 2 (50-456, 50-457)
Byron 1, 2 (50-454, 50-455)
Dresden 1, 2, 3 (50-10, 50-237, 50-249)
La Salle 1, 2 (50-373, 50-374)
Quad-Cities 1, 2 (50-254, 50-265)
Zion 1, 2 (50-295, 50-304)
Consumers Power Company Big Rock Point (50-155)
Midland 1, 2 (50-329, 50-330)
Palisades (50-255)
Dairyland Power Cooperative LACEWR (50-409)
Detroit Edison Company Fermi 2 (50-341)
Illinois Power Company Clinton 1, 2 (50-461, 50-462) 1942 106 0 16 m soso.,e
J A.'.' 3 1980 State of Illinois
- Iowa Electric Light & Power Company Duane Arnold (50-331)
Northern Indiana Public Service Company Bailly (50-367)
Northern States Power Company Monticello (50-263)
Prairie Island 1, 2 (50-282, 50-306)
Ohio Edison Company Erie 1, 2 (50-580, 50-581)
Public Service of Indiana Marble Hill 1, 2 (50-546, 50-547)
Toledo Edison Company Davis-Besse 1 (50-346)
'Jnion Electric Company Callaway 1, 2 (50-483, 50-486)
Wisconsin Electric Power Compar.y Point Beach 1, 2 (50-266, 50-301)
Wisconsin Public Service Corporation Kewaunee (50-305)
Sincerely, Dorothy E. Carroll, Acting Chief Administrative Branch
Enclosure:
IE Information Notice No. 80-01 cc w/ enc 1:
Mr. D. W. Kane, Sargent & Lundy Central Files Reproduction Unit NRC 20b Local PDR NSIC TIC
- pIIIlMi 1942 107 1/7/80
UNITED STATES SSINS NO.: 6870 NUCLEAR REGULATORY COMMISSION Accessions No.:
OFFICE OF INSPECTION AND ENFORCEMENT 7910250523 WASHINGTON, D.C.
20555 January 4,1980 IE Information Notice No. 80-01 FUEL HANDLING EVENTS Description of Circumstances:
Two recent fuel handling events at the Pilgrim Nuclear Station have been reported to the NRC wherein there were no interlocks to control or limit the movement of nuclear fuel in the reactor building.
The first event occurred on December 11, 1979 when a spent fuel assembly was inadvertently raised high enough in the fuel pool to activate area radiation alarms. The reactor building overhead crane was being used to move new fuel from the inspection rig to the high density storage racks in the fuel pool.
Af ter the release of a new fuel element, the lifting hook became caught between the lifting bail and the assembly channel of a spent fuel assembly.
The operating personnel were unaware of the fact that the spent fuel assembly was being raised until radiation alarms sounded.
The operators quickly lowered the assembly to clear the radiation alarms and ultimately placed it in a storage position. The licensee subsequently increased the administrative controls on fuel handling activities by assigning more personnel and limiting concurrent duties.
On December 17, 1979, the second fuel handling euent occurred at Pilgrim Nuclear Station when a new fuel assembly was dropped while it was being transferred to its storage location in the spent fuel pool. The assembly was being transported with the reactor building overhead crane when it struck the top edge of the high density fuel racks and the latching device on the auxiliary hook failed to retain the fuel assembly lifting bail in the hook. The assembly fell, striking the lifting bails on four spent fuel elements, then coming to rest on the top of the fuel racks.
It has since been moved to a spent fuel preparation stand; an inspection of the assembly will be made at the site and then it will be returned to the supplier for further evaluation. A visual inspection of the four spent assemblics was performed and there was no apparent damage. Samples of the fuel pool water were analyzed and no change in activity levels was detected. The licensee has terminated the use of contract personnel and will use members of the plant operating staff for future fuel handling operations; a licensed Nuclear Plant Operator (HPO) will be responsible for proper alignment of the crane before fuel movement and a Reactor Engineer will supervise all fuel movement. All fuel movement will be limited to the minimum speed of the crane.
The events described above occurred at a boiling water reactor, however, the potential for raising a spent fuel element with the new fuel elevator may also exist at some pressurized water reactors.
Movement of spent fuel by cranes or i942 108
IE Information Notice No. 80-01 January 4, 1980 Page 2 of 2 mechanisms intended for use on new fuel, which are not interlocked to prevent withdrawal from the pool, have the potential for producing extremely high dose rates or resulting in fuel damage.
This IE Information Notice is provided as an early notification of r possibly significant matter that is still under review by the NRC staff.
It is expected that recipients will review the information for possible applicability to their facilities. No specific action or response is requested at this time.
If NRC evaluations so indicate, further licensee actions may be requested or required.
No written response to this lE Informati n Notice is required.
If you have any questions regarding this matter please centact the Director of the appropriate NRC Regional Office.
Enclosure:
List of Recently Issued IE Information Notices 1942 109
IE Information Notice No. 80-01 Enclosure January 4, 1980 RECENTLY ISSUED IE INFORMATION NOTICES Information Subject Date Issued To Notice No.
Issued 79-37 Cracking in Low Pressure 12/28/79 All power reactor OLs Turbine Discs and cps 79-36 Computer Code Defect in 12/31/79 All power reactor OLs Stress Analysis of Piping and cps Elbow 79-35 Control of Maintenance 12/31/79 All power reactor facilities and Essential Equipment with an OL or CP 79-34 Inadequate Design of 12/27/79 All holders of power reactor Safety-Related Heat OLs and cps Exchangers 79-33 Improper Closure of 12/21/79 All power reactor facilities Primary Containn.ent holding OLs and cps Access Hatches 79-32 Separation of Electrical 12/21/79 All power reactor facilitiet Cables for HPCI and ADS holding OLs and cps 79-31 Use of Incorrect Amplified 12/13/79 All holders of power reactor Response Spectra (ARS)
OLs and cps 79-30 Reporting of Defects and 12/6/79 All power reactor facilities Noncompliance, 10 CFR Part 21.
holding OLs and cps and vendors inspected by LCVIP 79-29 Loss of NonSafety-Related 11/16/79 All power reactor facilities Reactor Coolant System holding OLs or cps Instrumentation During Operation 79-28 Overloading of Structural 11/16/79 All power reactor facilities Elements Due to Pipe Support with ar. OL or CP Loads 79-27 Steam Generator Tube 11/16/79 All power reactor facilities Ruptures At Two PWR holding OLs and cps Facilities79-12A Attempted Damage To New 11/9/79 All Fuel Facilities, Fuel Assemblies research reactors, and power reactors with an OL or CP 1942 110
.