ML19260D191
| ML19260D191 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 01/16/1980 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Burstein S WISCONSIN ELECTRIC POWER CO. |
| References | |
| NUDOCS 8002080057 | |
| Download: ML19260D191 (1) | |
Text
.
ICENTRg p,m JAN i e 1980 Docket No. 50-266 Docket No. 50-301 Wisconsin Electrie Power Company ATTN:
Mr. Sol Burstein Executive Vice President Power Plants 231 West Michigan Milwaukee, WI 53201 Gentlemen:
Enclosed is IE Bulletin No.79-01B which requires action by you with regard to your power reactor facilities with an operating license.
Should you have questions regarding this Bulletin or the actions required of you, please contact this office.
Sincerely, James G. Keppler Director
Enclosure:
IE Bulletin No.79-01B cc w/ encl:
Mr. G. A. Reed, Plant Manager Central Files Director, NRR/DPM Director, NRR/ DOR C. M. Trammell, ORB /NRR PDR Local PDR NSIC TIC Sandra A. Bast, Lakeshore Citizens for Safe Energy Mr. John Duffy, Chief Boiler Inspector, Department of Industry, Labor and Human Relations 1942 183 RIII RII Heis an/jp K ppler 1/14/80
\\
h 800208o O
/
.