Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19261B877 + (16:27:58, 3 January 2025)
- ML19261B876 + (16:28:01, 3 January 2025)
- ML19261B875 + (16:28:04, 3 January 2025)
- ML19261B874 + (16:28:06, 3 January 2025)
- ML19261B872 + (16:28:09, 3 January 2025)
- ML19261B870 + (16:28:12, 3 January 2025)
- ML19261B869 + (16:28:14, 3 January 2025)
- ML19261B868 + (16:28:16, 3 January 2025)
- ML19261B867 + (16:28:18, 3 January 2025)
- ML19261B866 + (16:28:19, 3 January 2025)
- ML19261B865 + (16:28:21, 3 January 2025)
- IR 05000348/1978027 + (16:28:23, 3 January 2025)
- ML19261B861 + (16:28:25, 3 January 2025)
- ML19261B860 + (16:28:26, 3 January 2025)
- ML19261B859 + (16:28:28, 3 January 2025)
- ML19261B858 + (16:28:36, 3 January 2025)
- ML19261B857 + (16:28:37, 3 January 2025)
- ML19261B856 + (16:28:38, 3 January 2025)
- 05000286/LER-1979-002-03, /03L-0 on 790205:at 100% Power,Increase in Gaseous Activity Was Observed.Caused by Leakage of No 32 Charging Pump Plunger.Plunger & Packing for Union Pump QX-300 Quintuplex Were Replaced & Unit Returned to Svc + (16:29:14, 3 January 2025)
- ML19261B853 + (16:29:21, 3 January 2025)
- ML19261B852 + (16:29:22, 3 January 2025)
- 05000295/LER-1979-006-01, /01T-0 on 790202:addition of Too Much Boron Caused Temp Average to Drop Below 540 F.Caused by Inadequate Procedures Specifying When High Steam Flow Safety Injection Can Be Blocked.Procedures Clarified + (16:29:26, 3 January 2025)
- 05000286/LER-1979-002, Forwards LER 79-002/03L-0 + (16:29:32, 3 January 2025)
- ML19261B849 + (16:29:34, 3 January 2025)
- IR 05000254/1978029 + (16:29:37, 3 January 2025)
- 05000295/LER-1979-006, Forwards LER 79-006/01T-0 + (16:29:39, 3 January 2025)
- ML19261B844 + (16:29:42, 3 January 2025)
- 05000324/LER-1979-003-03, /03L-0 on 790130:reactor Scrammed on Average Power Range Monitor High Flux.Caused by stem-disc Separating, Causing a Momentary Pressure Spike.Repairs to Appropriate Valve Will Be Made + (16:29:45, 3 January 2025)
- 05000317/LER-1979-004-03, /03L-0 on 790216:saltwater Pump Discharge Check Valve Failed to Open When Started.Caused by Foreign Debris Lodged Against Disc.Valve Will Be Monitored Closely During Future Operation to Ensure Problem Is Eliminated + (16:30:00, 3 January 2025)
- ML19261B841 + (16:30:02, 3 January 2025)
- 05000324/LER-1979-003, Forwards LER 79-003/03L-0 + (16:30:06, 3 January 2025)
- ML19261B836 + (16:30:15, 3 January 2025)
- 05000317/LER-1979-004, Forwards LER 79-004/03L-0 + (16:30:19, 3 January 2025)
- 05000366/LER-1979-023, Forwards LER 79-023/03L-0 + (16:30:24, 3 January 2025)
- IR 05000155/1978014 + (16:30:28, 3 January 2025)
- ML19261B829 + (16:30:31, 3 January 2025)
- ML19261B828 + (16:30:40, 3 January 2025)
- NUREG-0298, Discusses Coordination of NRC Fire Protection Plan. Recommends Responsibility for Div of Operating Reactors Coordination Be Transferred to Div of Sys Safety,To Reduce Dor Fire Protection Effort as SERs Are Completed + (16:30:43, 3 January 2025)
- ML19261B826 + (16:30:48, 3 January 2025)
- ML19261B825 + (16:30:50, 3 January 2025)
- ML19261B823 + (16:30:52, 3 January 2025)
- IR 05000271/1978028 + (16:30:55, 3 January 2025)
- ML19261B821 + (16:30:58, 3 January 2025)
- ML19261B820 + (16:31:00, 3 January 2025)
- ML19261B818 + (16:31:02, 3 January 2025)
- ML19261B817 + (16:31:03, 3 January 2025)
- ML19261B813 + (16:31:56, 3 January 2025)
- ML19261B812 + (16:32:07, 3 January 2025)
- ML19261B810 + (16:32:08, 3 January 2025)
- ML19261B808 + (16:32:11, 3 January 2025)
- ML19261B805 + (16:32:14, 3 January 2025)