ML19261B872

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-341/78-18
ML19261B872
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 02/22/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hines E
DETROIT EDISON CO.
Shared Package
ML19261B873 List:
References
NUDOCS 7903070458
Download: ML19261B872 (1)


See also: IR 05000341/1978018

Text

.

T

.

-

c# *%,

UNITED STATES

'*

NUCLEAR REGULATORY COMMISSION

y *,I {}f ), g

y.

.

}

REGloN lll

e

'

e

799 ROOSEVELT ROAD

$,

,4

GLEN E LLYN, ILLINolS 60137

6

  • ...*

fB 22.1979

Docket No. 50-341

The Detroit Edison Company

ATTN:

Mr. Edward Hines, Assistant

Vice President and Manager

Quality Assurance

2000 Second Avenue

Detroit, MI

48226

Gentlemen:

Thank you for your letter dated February 6, 1979, informing

us of the steps you have taken to correct the noncompliance

identified in our letter dated January 5, 1979. We vill

examine your corrective action during a future inspection.

Your cooperation with us is appreciated.

Sincerely,

-

//k

Gaston Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

cc w/ltr dtd 2/6/79:

Central Files

Reproduction Unit NRC 20b

PDR

Local FDR

NSIC

TIC

Ronald Callen, Michigan Public

Service Commission

Eugene B. Thomas, Jr.,

Attorney

7!. 30704 %