Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19270G397 + (11:00:06, 3 January 2025)
- ML19270G396 + (11:00:09, 3 January 2025)
- 05000409/LER-1979-008-03, /03L-0 on 790429:during Periodic Type C Leakage Rate Testing,Containment Isolation Did Not Meet Tech Spec Criteria.Caused by Damper Disc Shaft Packing.Replaced W/Chevron Type Asbestos Composition Shaft Packing + (11:00:11, 3 January 2025)
- 05000409/LER-1979-008, Forwards LER 79-008/03L-0 + (11:00:13, 3 January 2025)
- ML19270G392 + (11:00:14, 3 January 2025)
- 05000266/LER-1979-008-01, /01T-0 on 790502:remote Possibility Exists for Simultaneous Safety Injection in Both Units,Which Could Result in Emergency Diesel Overloading.Pressurizer Logic & Power Supplies Changed + (11:00:15, 3 January 2025)
- ML19270G390 + (11:00:16, 3 January 2025)
- 05000266/LER-1979-008, Forwards LER 79-008/01T-0 + (11:00:18, 3 January 2025)
- ML19270G387 + (11:00:19, 3 January 2025)
- 05000266/LER-1979-009-01, /01T-0 on 790510:during Hydrostatic Test of Fire Water Sys,Compression Fitting Failed.Caused by Broken Flange.Flange Replaced + (11:00:20, 3 January 2025)
- 05000266/LER-1979-009, Forwards LER 79-009/01T-0 + (11:00:22, 3 January 2025)
- 05000366/LER-1979-036-01, /01T-0 on 790516:sprinkler Hanger Mods Indicated Seismic Design Deficiency for Cable Spreading Room Designs.Proper Analysis & Mods Have Begun + (11:00:24, 3 January 2025)
- 05000366/LER-1979-036, Forwards LER 79-036/01T-0 + (11:00:26, 3 January 2025)
- 05000366/LER-1979-035-03, /03L-0 on 790515:procedure HPN-2-3195,weekly Breaker Alignment Checks, Was Performed One Day Late. Caused by Late Issuance of Assignment Sheets.Surveillance Engineer Made Aware of Importance of Prompt Sheet Issuance + (11:00:29, 3 January 2025)
- 05000366/LER-1979-035, Forwards LER 79-035/03L-0 + (11:00:31, 3 January 2025)
- ML19270G374 + (11:00:32, 3 January 2025)
- 05000366/LER-1979-034-01, /01T-0 on 790514:instruments in Remote Shutdown Panel H21-P173 & Heating,Ventilation & Air Conditioning Panels H11-P654 & H11-P657 Did Not Meet Seismic Requirements.Caused by Installation Error.Proper Instruents + (11:00:33, 3 January 2025)
- 05000304/LER-1979-029-03, /03L-0 on 790423:during Change of Startup Batteries on 2C CS Pump,Spray Sys Was Inadvertently Rendered Inoperable W/O Performing Required Surveillance.Caused by Personnel Error in Operating multi-position Switch + (11:00:35, 3 January 2025)
- 05000366/LER-1979-034, Forwards LER 79-034/01T-0 + (11:00:37, 3 January 2025)
- 05000304/LER-1979-029, Forwards LER 79-029/03L-0 + (11:00:39, 3 January 2025)
- 05000321/LER-1979-033-01, /01T-0 on 790518:RHR Return Valves E11-F015B & E11-F017B & RHR Pump Suction Valves Leaked During Local Leak Rate Testing.Cause Unknown.Corrective Maint Will Be Performed to Allow Satisfactory Leakage Rate + (11:00:44, 3 January 2025)
- 05000321/LER-1979-033, Fowards LER 79-033/01T-0 + (11:00:46, 3 January 2025)
- ML19270G364 + (11:00:48, 3 January 2025)
- 05000321/LER-1979-032-01, /01T-0 on 790516:sprinkler Hanger Mods Indicated Seismic Design Deficiency for Cable Spreading Room Sprinkler.Caused by Lack of Detailed Seismic Analysis.Analysis & Mods Have Begun + (11:00:49, 3 January 2025)
- ML19270G362 + (11:00:52, 3 January 2025)
- 05000321/LER-1979-032, Foward LER 79-032/01T-0 + (11:00:53, 3 January 2025)
- 05000321/LER-1979-013-01, /01X-1 on 790131:scram Received on Intermediate Range Monitor Hi-Hi Trip at Notch 26 of Rod 42-15.Caused by Notches Being Withdrawn Past Point Required to Achieve Criticality.Procedures Revised + (11:00:55, 3 January 2025)
- ML19270G356 + (11:00:58, 3 January 2025)
- ML19270G358 + (11:00:58, 3 January 2025)
- 05000321/LER-1979-013, Foward LER 79-013/01X-1 + (11:01:00, 3 January 2025)
- ML19270G354 + (11:01:01, 3 January 2025)
- ML19270G353 + (11:01:01, 3 January 2025)
- ML19270G352 + (11:01:04, 3 January 2025)
- ML19270G351 + (11:01:06, 3 January 2025)
- ML19270G333 + (11:01:07, 3 January 2025)
- ML19270G330 + (11:01:09, 3 January 2025)
- ML19270G328 + (11:01:10, 3 January 2025)
- ML19270G326 + (11:01:11, 3 January 2025)
- ML19270G323 + (11:01:12, 3 January 2025)
- ML19270G319 + (11:01:13, 3 January 2025)
- ML19270G313 + (11:01:14, 3 January 2025)
- ML19270G311 + (11:01:15, 3 January 2025)
- ML19270G309 + (11:01:16, 3 January 2025)
- ML19270G308 + (11:01:16, 3 January 2025)
- ML19270G305 + (11:01:17, 3 January 2025)
- ML19270G304 + (11:01:18, 3 January 2025)
- ML19270G301 + (11:01:19, 3 January 2025)
- ML19270G294 + (11:01:21, 3 January 2025)
- ML19270G299 + (11:01:21, 3 January 2025)
- ML19270G287 + (11:01:22, 3 January 2025)
- ML19270G284 + (11:01:23, 3 January 2025)