Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19276F347 + (07:03:42, 3 January 2025)
- 05000265/LER-1979-004-03, /03L-0 on 790211:suction Isolation Valve Mo 2-1001-50 Failed to Close from Control Room.Caused by Failed Circuit Breaker in Valve Motor Control Center. Valve Taken Out of Svc for Repair During Outages + (07:03:44, 3 January 2025)
- ML19276F345 + (07:03:45, 3 January 2025)
- 05000333/LER-1979-014-01, /01T-0 on 790312:calculations in Piping Stress Analysis Are Being Redone on Accelerated Basis by Architect/Engineer.Shutdown Will Continue Until All Problems Are Resolved.Final Rept on Matter Is Forthcoming + (07:03:48, 3 January 2025)
- 05000304/LER-1979-009, Forwards LER 79-009/03L-0 + (07:03:51, 3 January 2025)
- 05000265/LER-1979-004, Forwards LER 79-004/03L-0 + (07:03:54, 3 January 2025)
- 05000333/LER-1979-014, Forwards LER 79-014/01T-0 + (07:03:58, 3 January 2025)
- ML19276F335 + (07:03:59, 3 January 2025)
- ML19276F334 + (07:04:00, 3 January 2025)
- ML19276F332 + (07:04:02, 3 January 2025)
- ML19276F333 + (07:04:02, 3 January 2025)
- ML19276F331 + (07:04:03, 3 January 2025)
- 05000254/LER-1979-013-03, /03L-0 on 790217:check Valves 1-263-2-31B & 1-263-42A Failed to Check Flow Through Instrument Lines. Caused by Dirt in Valve Internals.Internals Removed,Cleaned & Reassembled + (07:04:06, 3 January 2025)
- 05000301/LER-1979-002-03, /03L-0 on 790227:during Biweekly Test of a Reactor Trip Breaker,Several Seconds Elapsed Following Trip Signal Before Breaker Tripped.Caused by Faulty Reactor Trip Relay,Westinghouse BFD31.Relay Replaced + (07:04:09, 3 January 2025)
- 05000304/LER-1979-010-03, /03L-0 on 790214:Channel 2LT-460 Greater than 6% from Channel 2LT-461.Caused by Transmitter Had Zero & Span Shifted.Zero Adjustment Made,Transmitter Conservative for High & Low Level Trips + (07:04:11, 3 January 2025)
- 05000254/LER-1979-013, Forwards LER 79-013/03L-0 + (07:04:18, 3 January 2025)
- 05000301/LER-1979-002, Forwards LER 79-002/03L-0 + (07:04:23, 3 January 2025)
- 05000304/LER-1979-010, Forwards LER 79-010/03L-0 + (07:04:26, 3 January 2025)
- 05000254/LER-1979-014-03, /03L-0 on 790214:automatic Blowdown Timers Exceeded Tech Spec Limits During Tests.Caused by Instrument Setpoint Drift.One Timer Readjusted,Another Replaced + (07:04:32, 3 January 2025)
- 05000254/LER-1979-010-03, /03L-1 on 790205:diesel Fire Pump 1/2A Out of Svc Beyond Tech Spec Limit.Caused by Personnel Error.Pump Returned to Svc + (07:04:36, 3 January 2025)
- 05000254/LER-1979-010, Forwards LER 79-010/03L-1 + (07:04:39, 3 January 2025)
- 05000254/LER-1979-014, Forwards LER 79-014/03L-0 + (07:04:41, 3 January 2025)
- 05000295/LER-1979-004-03, /03X-1 on 790112:inverter 114 Tripped & Could Not Be Reset;Hot Shutdown Not Reached within 4-h.Caused by Loose Contact in DC Breaker & Personnel Error in Late Start of Shutdown.Breaker Will Be Fixed,Personnel Reinstructed + (07:04:44, 3 January 2025)
- 05000295/LER-1979-004, Forwards LER 79-004/03X-l + (07:04:47, 3 January 2025)
- 05000245/LER-1979-009-03, /03L-0 on 790222:operability of Safety Relief Bellow Monitor Valve (1-MS-3A) Could Not Be Verified.Caused by Crack in Fitting Connecting Bellows Air Tubing to Valve Bonnet Cap.Fitting Replaced + (07:04:51, 3 January 2025)
- 05000265/LER-1979-005-03, /03L-0 on 790223:2A Recirculation Motor Generator Field Breaker Opened,Causing Flow Mismatch.Caused by Loosening of Coupling Between Main Shaft & Recirculation Motor Generator Set Tachometer.Tachometer Coupling Reset + (07:04:56, 3 January 2025)
- 05000245/LER-1979-009, Forwards LER 79-009/03L-0 + (07:05:03, 3 January 2025)
- 05000265/LER-1979-005, Forwards LER 79-005/03L-0 + (07:05:10, 3 January 2025)
- ML19276F302 + (07:05:12, 3 January 2025)
- ML19276F301 + (07:05:20, 3 January 2025)
- ML19276F300 + (07:05:27, 3 January 2025)
- ML19276F299 + (07:05:28, 3 January 2025)
- ML19276F298 + (07:05:29, 3 January 2025)
- ML19276F297 + (07:05:36, 3 January 2025)
- ML19276F296 + (07:05:43, 3 January 2025)
- ML19276F295 + (07:05:50, 3 January 2025)
- ML19276F294 + (07:05:52, 3 January 2025)
- ML19276F293 + (07:05:59, 3 January 2025)
- ML19276F291 + (07:06:01, 3 January 2025)
- ML19276F290 + (07:06:02, 3 January 2025)
- ML19276F289 + (07:06:03, 3 January 2025)
- ML19276F288 + (07:06:04, 3 January 2025)
- ML19276F287 + (07:06:09, 3 January 2025)
- ML19276F285 + (07:06:10, 3 January 2025)
- ML19276F284 + (07:06:14, 3 January 2025)
- ML19276F283 + (07:06:17, 3 January 2025)
- ML19276F282 + (07:06:18, 3 January 2025)
- ML19276F281 + (07:06:19, 3 January 2025)
- ML19276F280 + (07:06:21, 3 January 2025)
- ML19276F279 + (07:06:23, 3 January 2025)
- ML19276F277 + (07:06:26, 3 January 2025)