Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20217A354 + (14:44:48, 3 December 2024)
- ML20217A355 + (14:44:48, 3 December 2024)
- ML20217A351 + (14:44:49, 3 December 2024)
- ML20217A350 + (14:44:49, 3 December 2024)
- ML20217A346 + (14:44:50, 3 December 2024)
- ML20217A348 + (14:44:50, 3 December 2024)
- ML20217A345 + (14:44:51, 3 December 2024)
- ML20217A344 + (14:44:52, 3 December 2024)
- ML20217A343 + (14:44:53, 3 December 2024)
- ML20217A340 + (14:44:54, 3 December 2024)
- NRC-98-0060, Forwards Relief Request Update for First 10-Yr Interval ISI non-destructive Exam Program.Util Requests Review & Approval of Relief Requests by 980710 to Support RF06 Scheduled to Begin in Aug 1998 + (14:44:54, 3 December 2024)
- NPL-98-0185, Forwards Response to GL 97-05, SG Insp Techniques. GL Emphasized Importance of Performing SG Tube ISI Using Qualified Technique IAW 10CFR50,Appendix B + (14:44:55, 3 December 2024)
- ML20217A336 + (14:44:56, 3 December 2024)
- ML20217A337 + (14:44:56, 3 December 2024)
- LIC-98-0031, Forwards Response to GL 97-05 Re Steam Generator Tube Insp Techniques. Util Does Not Practice Leaving SG Tubes W/ Indications in Svc Based on Sizing,W/Exception of Pit Indications + (14:44:57, 3 December 2024)
- ML20217A335 + (14:44:57, 3 December 2024)
- ML20217A331 + (14:44:58, 3 December 2024)
- ML20217A329 + (14:44:58, 3 December 2024)
- ML20217A328 + (14:44:59, 3 December 2024)
- ML20217A327 + (14:45:00, 3 December 2024)
- ML20217A326 + (14:45:00, 3 December 2024)
- ML20217A324 + (14:45:01, 3 December 2024)
- ML20217A321 + (14:45:03, 3 December 2024)
- ML20217A320 + (14:45:04, 3 December 2024)
- ML20217A318 + (14:45:05, 3 December 2024)
- ML20217A317 + (14:45:05, 3 December 2024)
- L-98-052, Provides Response to Items 1 & 2 of Required Info,Re GL 97-05, Steam Generator Tube Insp Techniques. Util Leave SG Tubes Exhibiting Avb Wear & Clt Degradation in Svc Based on Eddy Current Sizing Techniques + (14:45:06, 3 December 2024)
- ML20217A313 + (14:45:06, 3 December 2024)
- 0CAN119001, Forwards Rev 20 to Industrial Security Plan.Rev Withheld (Ref 10CFR73.21) + (14:45:07, 3 December 2024)
- ML20217A310 + (14:45:07, 3 December 2024)
- B17127, Application for Amend to License NPF-49,changing TS Bases Section 3/4.5.2 to Reword Section to Specify Method to Be Used to Verify,Water Filled Portion of Recirculation Spray Sys Full of Water + (14:45:08, 3 December 2024)
- IR 05000295/1997003 + (14:45:09, 3 December 2024)
- ML20217A304 + (14:45:09, 3 December 2024)
- ML20217A303 + (14:45:10, 3 December 2024)
- ML20217A302 + (14:45:10, 3 December 2024)
- ML20217A300 + (14:45:11, 3 December 2024)
- 05000295/LER-1997-004-01, :on 970221,reactor Was Shutdown,Per LCO 3.6.1 Due to One Inoperable Containment Spray pump.1C CS Pump Day Tank Was Drained,Flushed,Refilled w/biocide-added Fuel from Different Source + (14:45:13, 3 December 2024)
- 3F1190-01, Forwards Rev 5-4 to Security Training & Qualification Plan. Rev Withheld (Ref 10CFR73.21) + (14:45:14, 3 December 2024)
- ML20217A295 + (14:45:14, 3 December 2024)
- ML20217A292 + (14:45:15, 3 December 2024)
- ML20217A290 + (14:45:15, 3 December 2024)
- ML20217A289 + (14:45:16, 3 December 2024)
- 05000255/LER-1997-013, :on 971110,determined Check Valves in Min Flow Recirculation Piping from Discharge of Each HPSI Pump Were Not Periodically Tested to Confirm Closure Capability.Caused by Inadequate Understanding.Database Revised + (14:45:18, 3 December 2024)
- ML20217A283 + (14:45:19, 3 December 2024)
- ML20217A284 + (14:45:19, 3 December 2024)
- LIC-97-0150, Forwards Response to NRC Re Violations Noted in Insp Rept 50-285/97-15 on 970615-0802.Corrective Actions: Individuals Involved Have Been Counseled Re Responsibilities for Control of Work Request Stickers + (14:45:22, 3 December 2024)
- ML20217A280 + (14:45:23, 3 December 2024)
- ML20217A276 + (14:45:24, 3 December 2024)
- ML20217A279 + (14:45:24, 3 December 2024)
- 05000364/LER-1998-001-05, :on 980328,manual Reactor Trip Due to Dropped Control Rod K-2,was Determined.Caused by Overcurrent Condition.Crdm Cable & Connectors Associated W/Rod K-2 Will Be Replaced & Rod Will Be Tested During Startup Testing + (14:45:26, 3 December 2024)
- 05000364/LER-1990-003-01, :on 901013,Tech Spec 3.0.3 Entered Due to Intermediate Range Nuclear Detectors Being Declared Inoperable + (14:45:42, 3 December 2024)
- ML20217A271 + (14:45:43, 3 December 2024)