ML20217A354
| ML20217A354 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 04/17/1998 |
| From: | Collins E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Mcgaha J ENTERGY OPERATIONS, INC. |
| Shared Package | |
| ML20217A361 | List: |
| References | |
| 50-458-98-05, 50-458-98-5, NUDOCS 9804220246 | |
| Download: ML20217A354 (5) | |
See also: IR 05000458/1998005
Text
[
,i
""860,
UNITED STATES
t.
.%
NUCLEAR RECULATORY COMMISSION
.
$
f$
REGIGN IV
611 RYAN PL AZA ORIVE, SUITE 400
[
h
'
AR LINGTON. T E XAS 76011 8064
9 '"**
APR I7 Ec
John R. McGaha, Vice President - Operations
River Bend Station
l
Entergy Operations, Inc.
P.O. Box 220
St. Francisville, Louisiana 70775
SUBJECT: NRC INSPECTION REPORT 50-458/98-05 AND NOTICE OF VIOLATION
Dear Mr. McGaha:
An NRC inspection was conducted February 22 through April 4,1998, at your River Bend
I
Station reactor facility. The enclosed report presents the scope and results of that inspection.
During the 6-week period covered by this inspection, your conduct of activities at the River Bend
l
Station facility was generally characterized by safety-conscious operations, sound engineering
and maintenance practices, and effective radiological controls. However, one violation was
identified during this inspection period. The violation involved the design control of the
postaccident differential pressure across the auxiliary building, which was in excess of that
specified by your environmental design criteria. Changes to the facility that affected the
environmental design requirements were not properly evaluated and documented. The absence
l
of pertinent standby gas treatment system design documents was considered a contributor to
this problem.
The violation is cited in the enclosed Notice of Violation (Notice) and the circumstances
surrounding this violation are described in detailin the enclosed report. Please note that you are
required to respond to this letter and should follow the instructions specified in the enclosed
Notice when preparing your response. The NRC will use your response, in part, to determine
whether further enforcement action is necessary to ensure compliance with regulatory
,
requirements. In your response, please describe your plans to correct the design deficiencies
with the standby gas treatment system. Also, specify your planned actions to update standby
gas treatment system design information.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
l
enclosure (s), and your response will be placed in the NRC Public Document Room (PDR).
9804220246 980417
ADOCK 05000458
G
.
.
Entergy Operations, Inc.
-2-
Should you have any questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely, .
'
'
%
I
Elmo E. Collins, Chief
'
Project Branch C
Division of Reactor Projects
Docket No.:
50-458
License No.: NPF-47
Enclosures:
2. NRC Inspection Report
50-458/98-05
cc w/ enclosures:
Executive Vice President and
Chief Operating Officer
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286-1995
. Vice President
Operations Support
j
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286-1995
General Manager
PIant Operations
_
River Bend Station
Entergy Operations, Inc.
P.O. Box 220
St. Francisville, Louisiana 70775
Director- Nuclear Safety
River Bend Station
Entergy Operations, Inc.
P.O. Box 220
St. Francisville, Louisiana 70775
.
e
Entergy Operations, Inc.
-3-
Wise, Carter, Child & Caraway
P.O. Box 651
Jackson, Mississippi 39205
Mark J. Wetterhahn, Esq.
Winston & Strawn
1401 L Street, N.W.
Washington, D.C. 20005-3502
Manager - Licensing
q
River Bend Station
i
Entergy Operations, Inc.
P.O. Box 220
St. Francisville, Louisiana 70775
I
The Honorable Richard P. leyoub
Attorney General
Department of Justice
State of Louisiana
P.O. Box 94005
Baton Rouge, Louisiana 70804-9005
H. Anne Plettinger
3456 Villa Rose Drive
Baton Rouge, Louisiana 70806
President of West Feliciana
Police Jury
P.O. Box 1921
St. Francisville, Louisiana 70775
William H. Spell, Administrator
Louisiana Radiation Protection Division
P.O. Box 82135
Baton Rouge, Louisiana 70884-2135
.
.
Entergy Operations, Inc.
-4-
7
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL) .
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Doci! ment Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
bec to DCD (IE01)
'
bc.; distrib. by RIV:
Rogional Administrator
Senior Resident inspector (Grand Gulf)
DRP Director
DRS-PSB
Branch Chief (DRP/C)
MIS System
Project Engineer (DRP/C)
RIV File
1
Branch Chief (DRP/TSS)
Resident inspector
'
l
l
DOCUMENT NAME: R:\\_RB\\RB805RP.GDR
To receive copy of document, Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy
l
RIV: SRI
PE:DRP/C
_
C:DEqP,/C
GDReplogie
CSMarschattf#/l EEddit(1s
4/ /i/98
4/lF /98
4/15/98
.
t
'
OFFICIAL ltECORD COPY
?
.
Entergy Operations, Inc.
-4-
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
bec to DCD (IE01)
bec distrib. by RIV:
Regional Administrator
Senior Resident inspector (Grand Gulf)
DRP Director
DRS-PSB
Branch Chief (DRP/C)
MIS System
Project Engineer (DRP/C)
RIV File
i
Branch Chief (DRP/TSS)
Resident inspector
)
l
I
'
DOCUMENT NAME: R:\\_RB\\RB805RP.GDR
To receive copy of document. Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy
RIV: SRI
PE:DRP/C
_
C:DFAP,/C
GDReplogie
CSMarsch$fl[L EEddir6s
l4/ t /98
4/lF /98
4/15/98
ti
OFFICIAL RECORD COPY
220028