y.
'"^*
AMENDMENT OF SOLICITATION /MODIFICATl3N OF CONTRACT 3
3 1
- 2. s.MtNDuENTuopiriCAtioN No a ErrECTivt DATE
- 4. HEOulSITION/PUHCHAsE REO. NO.
s PROJECT NO Ut appticate 6
4/24/98 RES-97-039; 3/5/98 RES-C98-047/048 j
e sstuf D ev
- 7. ADMINI51ERED sv UT ether than item el cgg U.S. Nuclear Regulatory CoRunission Same as Block 6.
Div. of Contracts & Property Management
]
M:lt Stop i 712 W xhington DC 20555 s NAME AND ADDRESS OF CONTRACTOR INo., street, county, state end ZIP Lode)
(x) 9A. AMENDMENT OF SOLICITATION NO J
98 DATED (SEE ITEM i16 Scientech, Inc.
11110 Rockville Pike Sulta 500 10A MODmCATION OF CONTRACTORDER NO Rockvitle MD 20852 Con # NRC-04 97-039 10e DATED ISEE ITEM 13) l 04-24-1997 1
Coct lF ACILITY CODE X
- 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
] The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers [is extended, Ces not extended.
Off 2rs must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(d By completing items 8 and 15. and retuming copies of the amendment; (b) By acknowledging receipt of this amendment of each copy of the cf f;r submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR AC-
)
KNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by tiegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
ts. 4.CcOuNTING AND APPROPRIAT'ON DATA Off required)
APPN: 31x0200,860 BOC: 2%24 B&R: 86015211005/8606082100 JOB CODE: W6ZQ6d 6006_ RRG.L. AMT s $498.155/545.000
- 13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS / ORDERS, IT MODIFIES THE CONTRACT / ORDER NO. AS DESCRIBED IN ITEM 14.
(x)
A. THis CHANGE ORDER is ISklED PURSUANT To: (Specdv authonty) THE CHANGES SET FORTH lN ITEM 14 ARE MADF IN THE CONTRACT ORDER NO. IN ITEM 10A 8 THE ABOVE NUMBERED CONTRACTIORDER IS MODIFIEo TO REFLECT THE ADMINISTRATIVE CHANGES buch as changes en payme office approonsion date, etc.)
SET FORTH IN ITEM 14 PURSUANT TO THE AUTHORITY OF FAR 431o310).
C. THis SUPPLEMENTAL AGREEMENT is ENTERED INTO NASUANT TO AUTHORITY OF:
D OTHER r$,ecify tvos er mod.v.c.vooa ead au"ioatvi 52.217-9 " Option to Extend the Term of the contract" X
is not. @ is required to sign this document and return 2 copies to the issuing offsce, E. IMPORTANT: contractar a casCRerioN or AMENDMENTMODITICATION (Organered by UCF secten hesemgs, metudmg schcasation/ contract sublect matter where feaselpe.l See Continuation Page.
/
)
- s i
Encept si peovided herem. all terme end conditions of the document referenced en trem sA or toA. as heretofore changed. remame unchanged and m futi force and aNect isA NAME AND TITLE OF siGNE fT ns 16A. NAME AND TITLE OF CONTRACTING OFFICER (T ype or pret) l Mary H. Mace p/ j),
j Contracts Manager a
153 TRAC fEROR 1sc DATE 54GNED 16e ES A
A
{16C DA StGN A%
- h glf f ev t
-)
- ^
-)
s s,u.e.. ore.n.u,,a,.d to.en,
. &e o, Contgim, o,.
.r>
g 9003250001 900318 f
sTANoARo,omho m/ 20 s3, PDR CONTR NRC-04-97-039 PDR
w
.v -
i NRC-04-97-039 Modification No. 6 -
Page 2 of 3
. The purpose of this modification is to: (1) correct mathematical errors in the ceiling and l
obligated amounts of Modification No. 5, (2) exercise Option Year 1 in accordance with l
Section 1. 3, " Option to Extend the Term of the Contract", (3) increase the contract ceiling and i
obligated amounts as a result of the exercise of the option, and (4) extend the period of performance. 7 The work to be performed during the Option Year 1 is described in Section C.1 l
of the contract.' Accordingly, the contract is hereby modified as follows:
1, The amount of "$1,836,692.28" in paragraph 2.(a) of modification no. 5 is deleted and l,
the amount of "$1,832,692.28" is inserted. In addition, the amount of "$1,836,692.28" in l
2.(e) and the cumulative obligations in the summary of obligations is also deleted and the amount of "$1,832,692.28" is inserted.
l 2.
In accordance with Section B.3, Option Year 1, Section B.3, Consideration and l
Obligation, paragraphs (a), (e), and (f) are deleted in their entirety and the following paragrapns are substituted in lieu thereof:
"(a)
The total estimated cost to the Govemment for full performance of the base year and Option Year _1 is $2,588,345.69, of which the sum of $2,406,445.59.
represents the estimated reimbursable costs, the amount of $174,400.88 represents the fixed fee, and the amount of $7,499.22 represents the facilities capital cost of money.
1 (e)
The amount currently obligated with respect to this contract is $2,375,847.28.
(f)
It is estimated that the amount currently allotted will cover performance through December 30,1998."
1 3.
Section F.6, Duration of Contract Period, is revised as follows:
"This contract shall commence on 4/24/97 and will expire on 4/23/99. However, the work described in Modification No. 5, Task Area 2, will expire on 9/30/98. The term of l
this contract may be extended at the option of the Govemment for an additional 3 one-l year options. Should the NRC exercise any option years, the optional years will be j
exercised and commence in April."
All other terms and conditions of the subject contract remain unchanged.
1 i
j i
n m
d-NRC-04-97-039 Modification No. 6 Page 3 of 3 By acceptance of this modification, the Contractor hereby waives its right to a 60 day written notice for the exercise of Option Year 1.
- A summary of obligations, from the award date through the date of this modification, are -
provide below:
Total FY 97 Obligations:
$ 947,847.28 Total FY 98 Obligations:
51,428,000.00 Cumulative Obligations:
$2,375,847,28 This modification obligates FY 98 funds in the amount of $543,155.00.
I e
L