Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20217E284 + (14:03:11, 3 December 2024)
- 05000293/LER-1998-003, :on 980220,discovered That RBCCW & Tbccw Heat Exchanger Supports Outside Design Basis Seismic Requirements.Caused by Calculation Error.Reviewed Similar Calculations & Counseled Individuals Associated W/Errors + (14:03:13, 3 December 2024)
- ML20217E279 + (14:03:14, 3 December 2024)
- 3F0398-18, Responds to NRC Re Violations Noted in Insp Rept 50-302/97-12.Corrective Actions:Review of EOPs Was Conducted to Identify Actions to Be Performed by Support Organizations + (14:03:15, 3 December 2024)
- ML20217E274 + (14:03:15, 3 December 2024)
- ML20217E272 + (14:03:16, 3 December 2024)
- ML20217E273 + (14:03:16, 3 December 2024)
- ML20217E269 + (14:03:17, 3 December 2024)
- ML20217E268 + (14:03:18, 3 December 2024)
- ML20217E264 + (14:03:20, 3 December 2024)
- ML20217E262 + (14:03:21, 3 December 2024)
- ML20217E260 + (14:03:22, 3 December 2024)
- ML20217E261 + (14:03:22, 3 December 2024)
- ML20217E257 + (14:03:23, 3 December 2024)
- ML20217E258 + (14:03:23, 3 December 2024)
- ML20217E255 + (14:03:24, 3 December 2024)
- PNO-II-99-045, on 991018,Hurricane Irene Was Located Approx 105 Miles East of Cape Hatteras,Nc.Ctr of Hurricane Was Estimated Near Latitude 35.6 North & Longitude 73.8 West. Storm Was Moving Northeast at 35 Mph + (14:03:25, 3 December 2024)
- ML20217E252 + (14:03:25, 3 December 2024)
- ML20217E248 + (14:03:29, 3 December 2024)
- ML20217E246 + (14:03:29, 3 December 2024)
- PNO-IV-99-043, on 991016,earthquake of Magnitude 7 Occurred. Plant Operations Were Not Disrupted.Unusual Event Classifications Were Exited within 1 H at Both Facilities.No Damage Was Indicated & No Residual Plant Effects Observed + (14:03:32, 3 December 2024)
- ML20217E241 + (14:03:32, 3 December 2024)
- ML20217E239 + (14:03:33, 3 December 2024)
- ML20217E232 + (14:03:34, 3 December 2024)
- ML20217E236 + (14:03:34, 3 December 2024)
- ML20217E226 + (14:03:35, 3 December 2024)
- ML20217E222 + (14:03:37, 3 December 2024)
- ML20217E223 + (14:03:37, 3 December 2024)
- ML20217E218 + (14:03:40, 3 December 2024)
- ML20217E214 + (14:03:41, 3 December 2024)
- ML20217E211 + (14:03:42, 3 December 2024)
- ML20217E210 + (14:03:42, 3 December 2024)
- ML20217E209 + (14:03:43, 3 December 2024)
- ML20217E207 + (14:03:43, 3 December 2024)
- ML20217E205 + (14:03:45, 3 December 2024)
- ML20217E199 + (14:03:46, 3 December 2024)
- ML20217E198 + (14:03:47, 3 December 2024)
- ML20217E197 + (14:03:48, 3 December 2024)
- 05000219/LER-1998-004-01, :on 980320,manual Reactor Scram Was Required. Caused by Failure of Supply Air Solenoid Valves Associated W/Sjae Steam Supply Regulating Valves.Stabilized Reactor Plant & Placed in Cold Shutdown + (14:03:51, 3 December 2024)
- ML20217E194 + (14:03:51, 3 December 2024)
- ML20217E191 + (14:03:52, 3 December 2024)
- ML20217E189 + (14:03:53, 3 December 2024)
- ML20217E187 + (14:03:54, 3 December 2024)
- ML20217E186 + (14:03:54, 3 December 2024)
- ML20217E177 + (14:03:55, 3 December 2024)
- ML20217E175 + (14:03:56, 3 December 2024)
- ML20217E174 + (14:03:57, 3 December 2024)
- ML20217E171 + (14:03:57, 3 December 2024)
- ML20217E168 + (14:03:58, 3 December 2024)
- IR 05000293/1999005 + (14:04:05, 3 December 2024)
- ML20217E163 + (14:04:06, 3 December 2024)