ML20217E207
| ML20217E207 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 04/15/1998 |
| From: | Langenbach J GENERAL PUBLIC UTILITIES CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20217E213 | List: |
| References | |
| 1920-98-20180, NUDOCS 9804270234 | |
| Download: ML20217E207 (2) | |
Text
...
e e'
l GPU Nucleer,Inc.
(
Route 441 South NUCLEAR P**' 0" B ** ***
Middletown, PA 17057-0480 Tel 717-944.621
(
April 15,1998 1920-98-20180 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Gentlemen:
j
Subject:
Three Mile Island Nuclear Station Unit 1 (TMI-1)
Operating License No. DPR-50 Docket No. 50-289 Final Safety Analysis Report, Update 14 Fire liazards Analysis Report, Revision 17 Enclosed are one signed original and ten copics of the Final Safety Analysis Report, Update 14 (UFSAR),
for TMI-1, submitted pursuant to 10 CFR 50.71(c). This UFSAR update package contains changes necessary to reflect facility changes, procedure changes and analyses through October 19,1997, which marked the end of the 12R Refueling and Maintenance Outage.
In addition, as part of the annual SAR update process, enclosed herewith is one copy of Revision 17 to the Fire liazards Analysis Report (FliAR). The F11AR, Revision 17, reflects the methodology used at TMI-l to meet 10 CFR 50, Appendix R. Revision of the document reflects changes to plant design and fire hazards analysis incorporated since Revision 16, through February 1,1998, as annotated by revision bars on the affected pages.
Sincerely,
' fames W. Langenbaci Vice President and Dibector, TMI Enclosures c
4vuvl AWM cc:
Region 1 Administrator,w/FSAR TMI-l Senior Project Manager, wo/ enclosure j,
TMI Senio: Resident inspector, w/FSAR and filar g }
9:304270234 980415 PDR ADOCK 05000289 K
g.
1920-98-20180 METROPOLITAN EDISON COMPANY JERSEY CENTRAL POWER AND LIGHT COMPANY PENNSYLVANIA ELECTRIC COMPANY GPU NUCLEAR Inc.
Three Mile Island Nuclear Station, Unit I (TMI-1)
Operating License No. DPR-50 Docket No. 50-289 Final Safety Analysis Report, Update 14 Fire Hazards Analysis Repon, Revision 17 This letter is submitted to update the Final Safety Analpis Report, Update 14 and the Fire Hazards Analysis Repon, Revision 17. As part of this submittal, replacement pages to the Final Safety Analysis Repon and the entire Fire Hazards Analysis Repon are enclosed.
l V
L pcs W. Langenbach Vice President and Dir
,TMI l
l Signed and sworn before me this Y__ _ day ofprll,
98.
- otary Pusie0 AGO
~ Notarial Sea!
-N l
Public 1
unda C.Wmer, Nota inCounty s-'.
tendonderryTwp. Da pt. 25. 2000_;
s My Commission Expires
's Membeifennsvivani. %
,r>*- 'd Notanes
~
v a*
..