Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20217M547 + (13:04:00, 3 December 2024)
- ML20217M544 + (13:04:01, 3 December 2024)
- 05000339/LER-1999-002-03, :on 990922,containment Liner Through Wall Defect Was Noted.Caused by Corrosion.Pressure Test Was Performed.With + (13:04:02, 3 December 2024)
- ML20217M541 + (13:04:03, 3 December 2024)
- ML20217M540 + (13:04:04, 3 December 2024)
- ML20217M538 + (13:04:06, 3 December 2024)
- ML20217M537 + (13:04:07, 3 December 2024)
- ML20217M535 + (13:04:08, 3 December 2024)
- ML20217M536 + (13:04:08, 3 December 2024)
- B17886, Requests Permission to Utilize Code Case N-623, Deferral of Insps of Shell-to-Flange & Head-to-Flange of Reactor Vessel,Section Xi,Div 1, for Millstone Unit 2 + (13:04:09, 3 December 2024)
- ML20217M532 + (13:04:10, 3 December 2024)
- ML20217M529 + (13:04:11, 3 December 2024)
- ML20217M531 + (13:04:11, 3 December 2024)
- ML20217M527 + (13:04:12, 3 December 2024)
- ML20217M528 + (13:04:12, 3 December 2024)
- ML20217M526 + (13:04:13, 3 December 2024)
- ML20217M521 + (13:04:14, 3 December 2024)
- ML20217M524 + (13:04:14, 3 December 2024)
- ST-HL-AE-5689, Application for Amend to License NPF-76,incorporating Revs to TS 3.7.1.6, Atmospheric Steam Relief Valves, to Ensure Automatic Feature of SG Power Operated Relief Valve Remains Operable During Modes 1 & 2 + (13:04:15, 3 December 2024)
- ML20217M518 + (13:04:20, 3 December 2024)
- ML20217M516 + (13:04:21, 3 December 2024)
- ML20217M513 + (13:04:22, 3 December 2024)
- ML20217M512 + (13:04:22, 3 December 2024)
- ML20217M508 + (13:04:25, 3 December 2024)
- ML20217M509 + (13:04:25, 3 December 2024)
- ML20217M505 + (13:04:26, 3 December 2024)
- ML20217M503 + (13:04:27, 3 December 2024)
- NSD-NRC-98-5675, Forwards non-proprietary Version of Rev 3 to WCAP-14846, Scaling Analysis for AP600 Containment Pressure During Design Basis Accidents + (13:04:27, 3 December 2024)
- ML20217M501 + (13:04:28, 3 December 2024)
- ML20217M500 + (13:04:28, 3 December 2024)
- ML20217M499 + (13:04:29, 3 December 2024)
- ML20217M497 + (13:04:30, 3 December 2024)
- ML20217M493 + (13:04:30, 3 December 2024)
- ML20217M492 + (13:04:31, 3 December 2024)
- ML20217M487 + (13:04:32, 3 December 2024)
- ML20217M489 + (13:04:32, 3 December 2024)
- ML20217M485 + (13:04:33, 3 December 2024)
- ML20217M483 + (13:04:33, 3 December 2024)
- ML20217M480 + (13:04:34, 3 December 2024)
- 1CAN049806, Application for Amend to License DPR-51,changing Order of Channel Rotation During Outage for Scheduling Flexibility, While Still Requiring Rotation Schedule to Be Established for Operating Cycle + (13:04:35, 3 December 2024)
- ML20217M478 + (13:04:36, 3 December 2024)
- 05000271/LER-1998-004, :on 980226,seven Day DG LCO Was Exceeded Due to Inadequate Guidance in Work Planning Procedure When Planning Work That Affects Block Walls.Grout Was Replaced & Completed on 980301 + (13:04:37, 3 December 2024)
- ML20217M476 + (13:04:38, 3 December 2024)
- ML20217M473 + (13:04:39, 3 December 2024)
- ML20217M472 + (13:04:40, 3 December 2024)
- ML20217M471 + (13:04:41, 3 December 2024)
- ML20217M466 + (13:04:42, 3 December 2024)
- ML20217M464 + (13:04:43, 3 December 2024)
- ML20217M463 + (13:04:43, 3 December 2024)
- SVP-99-181, Forwards Biennial Update to Quad Cities Ufsar,Iaw 10CFR50.71(e).Update Includes Changes to Facility & Procedures & Are Current Through 990630 + (13:04:44, 3 December 2024)
- ML20217M461 + (13:04:45, 3 December 2024)
- 05000254/LER-1998-013, :on 980131,discovered Insufficient Clearance Between Core Spray Test Return Valve & Pressure Suppression Chamber.Caused by Inattention to Detail in Original Design. Removed Pad to Restore Adequate Clearance + (13:04:47, 3 December 2024)