Forwards Annual Radiological Environ Operating Rept, Including Radiological Effluent Release Rept. Rev 11.0 to Davis-Besse ODCM, Encl
ML20217M518
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 04/24/1998
From: Lash J
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20217M523 List:
References
NUDOCS 9805050032
Download: ML20217M518 (2)


Text

[

1 I

Davis Besse Nuclear P6wer Station S501 North State Route 2 Oak Harbor. Ohio 43449-9760 April 24,1998 RP 1.7.13 Docket Number 50-346 4

License Number NPF-3 United States Nuclear Regulatory Commission

' Document Control Desk Washington, D.C. 20555

Subject:

Combined Annual Radiological Environmental Operating Report and Radiological Effluent Release Report Ladies and Gentlemen:

Provided under this cover is the combined 1997 Annual Radiological Environmental Operating Report

- (AREOR) and January through December 1997, Radiological Effluent Release Report (RERR) for the Davis-Besse Nuclear Power Station (DBNPS). The Taledyne Isotopes Midwest Laboratory Final

- Monthly Progress Report for January through December 1997, contains the 1997 Radiological Environmental Monitoring Program Sample Analysis Results. The AREOR and the RERR are submitted by April 30 of each year in accordance with DBNPS Technical Specifications 6.9.1.10 and 6.9.1.11.

For your reference, the enclosed Table 1 provides a listing of the specific requirements detailed in the DBNPS Offsite Dose Calculation Manual (ODCM) and the portion of the AREOR which was prepared j

to meet each requirement Also provided under this cover to the Document Control Desk only, are ODCM Revision 11 dated September 5,1997 and RERR Meteorougical Data on 3 % inch microdisk.

No changes to the Process Controi Program (PCP) occurred during this reporting period.

Should you have any questions or require additional information, please contact Mr. Lawrence A. Bonker, Supervisor - ALARA Services. at (419) 321-7310.

Very truly yours,

(}

es H. Lash Davis-Besse Plant Manager JAK/mjb 9805050032 980424 0\\

PDR ADOCK 05000346 CO R

PDR Enclosures cc:

A. B. Beach, Region III Administrator A. G. Hansen, NRC Project Manager S.1 Campbell, NRC Senior Resident Inspector Utility Radiological Safety Board of Ohio I

J

. Docket Number 50-346 License Number NPF-3 Serial Number 2291

- Enclosure Table 1:

- AREOR Sections Prepared to Meet Requirements of ODCM 7.1 Description of Reauirement Summaries, interpretations, and analyses of trends of the radiological environmental surveillance activities, and an assessment of the observed impacts of the plant (pages 39 through 79 and

- Apr ndix D) e.

Results of the Land Use Census (pages i10 through 115)

  • Results of the analysis of radiological environmental samples and of environmental radiation measurements (Teledyne Isotopes Midwest Laboratory Final Monthly Progress Report for January

. through December 1997)

Summary description of the radiological environmental. monitoring program (pages 26 though 79) e

_ At least two legible maps, covering sampling locations keyed to a table giving distances and e

directions from the centerline of one reactor (pages 42 through 78)

.. The results oflicensee participation in the Interlaboratory Comparison Program (Appendix A)'

e _ Discussion of cases in which specimens were unobtainable due to hazardous conditions, seasonal unavailability, malfunction of automatic sampling equipment and other legitimate reasons (pages 38 through 39)

.m.

J