Summary of 990901 Meeting with Licensee in Rockville,Md Re Util Planned Conversion to Improved Sts.Attendance List & Agenda Encl
ML20217M537
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 10/25/1999
From: Wetzel B
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
References
NUDOCS 9910270236
Download: ML20217M537 (6)


Text

-

o, 4

, y October 25,.1999

' LICENSEE: Wisconsin El ctric Power Company FACILITY: Point Beach Nuclear Plant, Units 1 and 2 l

l

SUBJECT:

MEETING BETWEEN THE WISCONSIN ELECTRIC POWER

/ COMPANY AND THE NRC STAFF REGARDING CONVERSION TO IMPROVED STANDARD TECHNICAL SPECIFICATIONS The NRC staff met with representatives from Wisconsin Electric Power Company (WE), the  ;

licensee for Point Beach Nuclear Power Plant (PBNP), Units 1 and 2, at NRC Headquarters on September 1,1999, to discuss WE's planned conversion to improved standard Technical Specifications (ITS). Enclosure 1 lists the meeting participants. Enclosure 2 is an agenda containing items discussed during the meeting.

. WE plans to submit a license amendment application to convert the current TSs to ITS in the fall of 1999 and has requested approval by the NRC in time to implement the ITS during the

. summer of 2001. WE discussed other items at the meeting, including submittal content,

. number of submittal copies needed by the NRO staff, examples of where WE will deviate from the standard TSs, and differences in PBNP design that could impact the NRC staff's review of l the ITS submittal. The licensee and NRC staff agreed that future meetings between NRC staff

~

l reviewers and the licensee to discuss specific design differences in the auxiliary feedwater system, service water system, and electrical distribution system would benefit the review of WE's conversion to ITS. These future meetings will be scheduled after WE submits its license amendment application to convert to ITS. ,

Original signed by Tae Kim for:

l Beth A. Wetzel, Senior Project Manager, Section 1 4 Project Directorate ill L Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-266 and 50-301 .,

Enclosures:

1. List of Meeting Attendees .

2.- Licensee Handouts cc w/encis: See next page Ihh hh hk$ @f QlSTRIBUTION - ,

i Hard Copy Docket File PUBLIC .PD3-1 r/f B. Wetzel . l OGC. ACRS I g

4 E-Mail J. Zwolinski - S. Black M. Satorius R. Dennig

' C. Harbuck R. Lanksbury, Rill

- DOCUMENT NAME: g:\pdiil-1\ptbeach\mts90199 Tf0' lC' OFFICE- PM:PD31 'Q LA:PD31 lC SC:PD31  !

NAME BWetzel T/K RBoulinR% - CCraiglW DATE /0/ro /99 lb //i /99 M /d6/99

, OFFICIAL RE, CORD COPY i 9910270236 991025 m.

ADOCK 05000266

~

PDR '

P FDP.

L j

October 25, 1999

.e :

' LICENSEE: ' Wisconsin El:ctric Powsr Company 4' FACILITY: Point Beach Nuclear Piar,t, Units 1 and 2

SUBJECT:

MEETING BETWEEN THE WISCONSIN ELECTRIC POWER COMPANY AND THE NRC STAFF REGARDING CONVERSION TO IMPROVED STANDARD TECHNICAL SPECIFICATIONS The NRC staff met with representatives from Wisconsin Electric Power Company (WE), the licensee for Point Beach Nuclear Power Plant (PBNP), Units 1 and 2, at NRC Headquarters on September 1,1999, to discuss WE's planned conversion to improved standard Technical l

Specifications'(ITS). Enclosure i lists the meeting pa6ticipants. Enclosure 2 is an agenda containing items discussed during the meeting. t l

WE plans to submit a license amendment application to convert the current TSs to ITS in the 4 fall of 1999 and has requested approval by the NRC in time to implement the ITS during the summer of 2001. WE discussed other items at the meeting, including submittal content, number of submittal copies needed by the NRC staff, examples of where WE will deviate from the standard TSs, and differences in PBNP design that could impact the NRC staff's review of the ITS submittal. The licensee and NRC staff agreed that future meetings between NRC staff reviewers and the licerr.ae to discuss specific desip 1 differences in the auxiliary feedwater system, service water system, and electrical distribution system would benefit the review of ,

WE's conversion to ITS. These future meetings will bo scheduled after WE subm'ts its license l

- amendment application to convert to ITS. J Original signed by Tae Kim for:

Beth A. Wetzel, Senior Project Manager, Section 1 Project Directorate lil I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-266 and 50-301

Enclosures:

1. List of Meeting Attendees  ;
2. Licensee Handouts  ;

cc w/encis: See next page DISTRIBUTION Hard Cooy Docket File PUBLIC PD3-1 r/f 4. Wetzel

-OGC ACRS E-Mail J. Zwolinski S. Black M. Satorius R. Dennig ,

C. Harbuck L R. Lanksbury, Rill DOCUMENT NAME: g:\pdili-1\ptbeach\mts90199 OFFICE PM;PD31 lC LA:PD31 lC SC:PD31 lC NAME BWetzel -T/R RBoulinR% CCraigI b; ;( '

gTE /0/to /99 16 // 9 /99 l/ /J(-/99

- OFFICIAL RECORD COPY

g55 W 0 0

& 4 UNITED STATES

4 [

o #

[ NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20666 0001 October 25, 1999 LICENSEE: Wisconsin Electric Power Company FACILITY: Point Beach Nuclear Plant, Units 1 and 2

SUBJECT:

MEETING BETWEEP THE WISCONSIN ELECTRIC POWER COMPANY AND THE NRC STAFF REGARDING CONVERSION TO IMPROVED STANDARD TECHNICAL SPECIFICATIONS The NRC staff met with representatives from Wisconsin Electric Power Company (WE), the licensee for Point Beach Nuclear Power Plant (PBNP), Units 1 and 2, at NRC Headquarters on Septernber 1,1999, to discuss WE's planned conversion to improved standard Technical Specifications (ITS). Enclosure 1 lists the meeting participants. Enclosure 2 is an agenda containing items discussed during the meeting.

WE plans to submit a license amendment application to convert the current TSs to ITS in the fall of 1999 and has requested approval by the NRC in time to implement the ITS during the summer of 2001. WE discussed other items at the meeting, including submittal content, number of submittal copies needed by the NRC ' staff, exampies of where WE will deviate from the standard TSs, and differences in PBNP design that could Impact the NRC staff's review of the ITS submittal. The licensee and NRC staff agreed that future meetings between NRC staff reviewers and the licensee to discuss specific design differences in the auxiliary feedwater system, service water system, and electrical distribution system would benefit the review of WE's conversion to ITS. These future meetings will be scheduled after WE submits its license i amendment application to convert to ITS.

1 Beth A. Wetzel, Senior Project Manager, Section 1 Project Directorate lli Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-266 and 50-301 1

Enclosures:

1. List of Meeting Attendees i
2. Licensee Handouts I cc w/encis: See next page

)

j l

W Wisconsin Electric Power Company ; Point Beach Nuclear Plant Units 1 and 2 cc:

, Mr. John H. O'Neill, Jr. Ms. Sarah Jenkins Shaw, Pittman, Potts & Trowbridge Electric Division j

- 2300 N Street, NW Public Service Commission of Wisconsin Washington, DC 20037-1128 P.O. Box 7854 -

Madison, Wisconsin 53707-7854 Mr. Richard R. Grigg President and Chief Operating Officer . M.. Michael B. Sellman Wisconsin Electric Power Company- Chief Nu% ar Officer 231 West Michigan Street - Wisconsin Clectric Power Company Milwaukee, Wisconsin 53201 - 231 West Michigan Street Milwaukee,WI 53201 Mr. Mark E. Reddemann Site Vice President Point Beach Nuclear Plant -

Wisconsin Electric Power Company 6610 Nuclear Road Two Rivers, Wisconsin 54241 Mr. Ken Duveneck Town Chairman l

)~ 1 Town of Two Creeks .

13017 State Highway 42 Mishicot, Wisconsin 54228 Chairman Public Service Commission of Wisconsin P.O. Box 7854 Madison, Wisconsin 53707-7854 Regional Administrator, Region ill U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, Illinois 60532-4351

= Resident inspector's Office t U.S. Nuclear Regulatory Commission -

I 6612 Nuclear Road -

Two Rivers, Wisconsin 54241 October 1998 s

5

5

)

LIST OF MEETING ATTENDEES CONVERSION TO IMPROVED STANDARD TECHNICAL SPECIFICATIONS POINT BEACH NUCLEAR POWER PLANT (PBNP). UNITS 1 AND 2 SEPTEMBER 1,1999 Name' Oracnization and Title Beth Wetzel Project Manager, NRC C. Craig Harbuck TS L.,_nch Lead Reviewer, NRC Bob Dennig Section Chief, RTSB, NRC G. Roxy Guyun ITS Cocrdinate:, Surry Power Station, VA Power Regina Borsh ITS Coordinator, VA Power l Bill Herrman ITS Implementation Lead, PBNP Jack Gadzala Licensing Manager, PBNP Curt Castell Licensing Engineer, PBNP RTSB = Technical Specifications Branch Enclosure 1

A .

.- ij Point Beach ITS Conversion Project Meeting with NRR NRC Headquarters, White Flint, Maryland

~

l September 1,1999 l

  • Proposed Schedule Submittal sections 3.3.1 &.3.3.2 re-write sections 1,2,3 (Oct 99) sections 4,5 (Dec 99) ,

lengthened submittal period to improve document quality Summer 2001 implernentation window refueling outage coordination

  • PTLR/COLR Integration PTLR submittal Jan 2000 COLR submittal Feb 2000 Discuss Subruittal Content and Number of Copies Needed Examples of CTS /CLB justification for deviation e.g., power to SI accumulatorisolation valves ITS Sections that deviate substantially from NUREG-1431 Auxiliary feedwater; service water; electrical -

System overviews to be provided shortly after submittal e

Formatting Irregularities due to Software Conversion (font; spaces)

Wrap-up/ questions; reviewer requests Enclosure 2