MONTHYEARML20217M5371999-10-25025 October 1999 Summary of 990901 Meeting with Licensee in Rockville,Md Re Util Planned Conversion to Improved Sts.Attendance List & Agenda Encl ML20211N2141999-09-0808 September 1999 Summary of 990720 Meeting with Util in Rockville MD Re Amend Currently Under Review by Staff Pertaining to Control Room Habitability at Plant Units 1 & 2.List for Attendees & Licensee Handouts Encl ML20206Q6411999-05-12012 May 1999 Summary of 990426 Meeting with Util at NRC Headquarters Re Proposed Submittal of Amend to Implement Ists.List of Meeting Participants & Matls Presented by Licensee Encl ML20196F6101998-12-0101 December 1998 Summary of 981029 Meeting with Northern States Power, Wisconsin Electric,Wisconsin Public Service & Alliant-IES in Rockville,Md Re Various Aspects of Potential Regulatory Issues Associated with Ongoing Cooperative Efforts ML20210H3881997-08-0808 August 1997 Summary of 970805 Meeting W/Wepc & W in Rockville,Md to Discuss Plans to Submit Two TS Change Requests That Will Address 422V Fuel & Proposed Schedule for Review.List of Attendees & Licensee Presentation Encl ML20135F7891997-03-0303 March 1997 Summary of 970224 Meeting W/Wisconsin Electric Power Co & Gls Enterprises,Inc in Rockville,Md Re Environ Qualified Equipment Inside Containment to Perform Function Following loss-of-coolant Accident Affected by Revised Profiles ML20058B0031993-11-10010 November 1993 Summary of 931103 Meeting W/Util in Rockville Re Emergency Diesel Generator Addition Project.Attendance List,Discussion on Proposed Review Schedule & Licensee Summary of Emergency Diesel Generator Project Encl ML20059B1201993-10-21021 October 1993 Summary of 931014 Meeting W/Util in Rockville,Md Re RCS Flow TS Change.List of Meeting Attendees & Handouts Encl ML20149D6051993-09-15015 September 1993 Summary of 930708 Region III Annual Training Managers Conference in Glen Ellyn,Il.Purpose of Meeting to Provide Forum for Discussion on Rev 7 of Operator Licensing Examiner Stds & to Discuss Operator Licensing Issues ML20056F8591993-08-16016 August 1993 Summary of 930727 Meeting W/Util in Rockville,Md Re Outstanding Licensing Issues.List of Participants Encl ML20059P0041990-10-12012 October 1990 Summary of 900905 Meeting W/Util in Rockville,Md Re Plans for Upgrading Onsite Emergency Power Capabilities ML20153G5481988-05-0404 May 1988 Summary of 880427 Telcon W/Utils in Region III Re Personnel Changes,Follow Up on Previous Items,Items of Interest from Sites & New Items ML20154G9921988-04-26026 April 1988 Summary of 880331 Meeting W/Sandia Natl Lab,Numarc,Epri, Saic,Util,Westinghouse & ERC Intl Re Differences Between Industry Sponsored Analysis & Earlier Analysis of Same Plant Sponsored by NRC ML20149K7541988-02-10010 February 1988 Summary of 880204 Meeting in Rockville,Md to Discuss Licensee Accident Reanalysis to Support Increased Allowable Core Peaking Factors at Facilities.Slides Used During Presentation & List of Meeting Attendees Encl ML20237A9931987-12-0303 December 1987 Summary of 871104 Meeting W/Westinghouse & Utils in Bethesda,Md Re Susceptability of Facility Steam Generators to High Cycle Fatigue.Attendance List & Nonproprietary Westinghouse Handouts Encl ML20237L1111987-08-28028 August 1987 Summary of Operating Reactors Events Meeting 87-28 on 870825 Re Events Which Occurred Since 870818 Meeting.List of Attendees & Significant Elements Encl ML20215C8721987-06-0808 June 1987 Summary of Operating Reactors Events Meeting 87-10 on 870406 Re Events Which Occurred Since 870330 Meeting.List of Attendees,Events Discussed & Significant Elements of Events & Summary of Reactor Scrams & Significant Events Encl ML20214W1621987-06-0505 June 1987 Summary of 870530 Meeting W/Util in Bethesda,Md Re Licensee Assessment of Flaw Indication Observed in Reactor Vessel nozzle-to-shell Weld for Safety Injection Sys.Attendees List Encl ML20215D0631986-12-11011 December 1986 Summary of Operating Reactor Events Meeting 86-42 on 861201. List of Attendees & Viewgraphs Re Significant Elements of Events Discussed Encl ML20215C9961986-12-11011 December 1986 Summary of Operating Reactor Events Meeting 86-41 on 861124.List of Attendees,Events Discussed & Significant Event Elements & Summary of Events That Will Be Input to NRC Performance Indicator Program Encl NUREG-0518, Summary of ACRS 316th Meeting on 860807-09 in Washington,Dc Re Proposed Standardization Policy Statement & Review of Issues Related to Reorganization of TVA Mgt Structure & Shutdown of TVA Nuclear Power Plants1986-08-18018 August 1986 Summary of ACRS 316th Meeting on 860807-09 in Washington,Dc Re Proposed Standardization Policy Statement & Review of Issues Related to Reorganization of TVA Mgt Structure & Shutdown of TVA Nuclear Power Plants ML20211G7781986-06-13013 June 1986 Summary of Operating Reactor Events Meeting 86-19 on 860609. List of Attendees,Events Discussed & Status of Previous Assignments Encl ML20197F7721986-05-0808 May 1986 Summary of Operating Reactors Events Meeting 86-15 on 860505.List of Attendees,Events Discussed & Status of Previous Assignments Encl ML20138N9841985-12-19019 December 1985 Summary of 851122 Meeting W/Licensees & Westinghouse to Present Status of Program for Developing New Upper Plenum Injection Evaluation Model.Nonproprietary Viewgraphs,List of Attendees & Agenda Encl ML20137X5091985-11-29029 November 1985 Summary of Operator Reactor Events Meeting 85-24 on 851125 Re Briefing of Ofc Directors & Div Directors & Representatives on Events Which Occurred Since Last Meeting on 851118.List of Attendees Encl ML20138P0081985-10-21021 October 1985 Summary of Operating Reactors Events Meeting 85-19 on 851007 W/Ofc Directors,Div Directors & Representatives on Events Which Occurred Since Last Meeting on 851007 ML20133F9941985-10-0707 October 1985 Summary of Operating Reactors Events Meeting 85-16 on 850916 Re Briefing of Director,Div Directors & Representatives on Events Occurring Since 850909 Meeting.List of Attendees & Viewgraphs Encl ML20141E5521985-09-26026 September 1985 Summary of ACRS Subcommittee on Reactor Operations 850910 Meeting in Washington,Dc to Discuss Recent Operating Occurrences.Fr Notice,Meeting Schedule & List of Meeting Slides Encl ML20209G6871985-09-0909 September 1985 Summary of Operating Reactor Events Meeting 85-14 on 850826 to Brief Director & Div Directors on Events Which Occurred Since 850813 Meeting.Computer Printout of 1985 Operating Reactor Events Meeting Topics to Date Encl ML20133E0661985-07-25025 July 1985 Summary of 850628 Meeting W/Utils & Westinghouse Re Status of Development of New Upper Plenum Injection Evaluation Model.List of Attendees & Agenda Encl ML20127N9021985-06-24024 June 1985 Summary of Operating Reactors Events Meeting 85-10 on 850612.Only 3 of 17 Items Scheduled for Completion by 850531 Remain Incomplete.List of Attendees,Summary of Events Discussed & Status of Previous Assignments Encl ML20236Y4401981-07-0101 July 1981 Summary of Site Audit & 810609-11 Meeting W/Util Re Response to IE Bulletin 80-11 on Masonry Walls.Lists of Attendees & Action Items Resulting from Meeting Encl ML20126L2331981-05-0101 May 1981 Summary of 810429 Meeting W/Pwr Owners Group Re Thermal Shock to Reactor Pressure Vessels.All Parties Agree That Thermal Shock W/Subsequent Repressurization Is Safety Concern Needing Prompt Evaluation ML20196H3981978-07-0505 July 1978 Summary of 780622 Meeting W/Westinghouse Owners Group to Discuss Results of Phase a of three-phase Plan & Current Schedule for Resolution of Asymmetric LOCA Loads Isssue.List of Attendees Encl ML20245C3211977-07-11011 July 1977 Summary of 770525 Meeting W/Westinghouse & Util Group Members Re Efforts to Prevent Reactor Vessel Overpressurization.W/O Encls ML20196H3251976-06-29029 June 1976 Summary of 760525 Meeting W/Util & Westinghouse Re Proposed Approach to Solution of Reactor Vessel Lateral Loading Question.List of Attendees,Agenda & Viewgraphs Encl 1999-09-08
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20217M5371999-10-25025 October 1999 Summary of 990901 Meeting with Licensee in Rockville,Md Re Util Planned Conversion to Improved Sts.Attendance List & Agenda Encl ML20211N2141999-09-0808 September 1999 Summary of 990720 Meeting with Util in Rockville MD Re Amend Currently Under Review by Staff Pertaining to Control Room Habitability at Plant Units 1 & 2.List for Attendees & Licensee Handouts Encl ML20206Q6411999-05-12012 May 1999 Summary of 990426 Meeting with Util at NRC Headquarters Re Proposed Submittal of Amend to Implement Ists.List of Meeting Participants & Matls Presented by Licensee Encl ML20196F6101998-12-0101 December 1998 Summary of 981029 Meeting with Northern States Power, Wisconsin Electric,Wisconsin Public Service & Alliant-IES in Rockville,Md Re Various Aspects of Potential Regulatory Issues Associated with Ongoing Cooperative Efforts ML20210H3881997-08-0808 August 1997 Summary of 970805 Meeting W/Wepc & W in Rockville,Md to Discuss Plans to Submit Two TS Change Requests That Will Address 422V Fuel & Proposed Schedule for Review.List of Attendees & Licensee Presentation Encl ML20135F7891997-03-0303 March 1997 Summary of 970224 Meeting W/Wisconsin Electric Power Co & Gls Enterprises,Inc in Rockville,Md Re Environ Qualified Equipment Inside Containment to Perform Function Following loss-of-coolant Accident Affected by Revised Profiles ML20058B0031993-11-10010 November 1993 Summary of 931103 Meeting W/Util in Rockville Re Emergency Diesel Generator Addition Project.Attendance List,Discussion on Proposed Review Schedule & Licensee Summary of Emergency Diesel Generator Project Encl ML20059B1201993-10-21021 October 1993 Summary of 931014 Meeting W/Util in Rockville,Md Re RCS Flow TS Change.List of Meeting Attendees & Handouts Encl ML20149D6051993-09-15015 September 1993 Summary of 930708 Region III Annual Training Managers Conference in Glen Ellyn,Il.Purpose of Meeting to Provide Forum for Discussion on Rev 7 of Operator Licensing Examiner Stds & to Discuss Operator Licensing Issues ML20056F8591993-08-16016 August 1993 Summary of 930727 Meeting W/Util in Rockville,Md Re Outstanding Licensing Issues.List of Participants Encl ML20059P0041990-10-12012 October 1990 Summary of 900905 Meeting W/Util in Rockville,Md Re Plans for Upgrading Onsite Emergency Power Capabilities ML20153G5481988-05-0404 May 1988 Summary of 880427 Telcon W/Utils in Region III Re Personnel Changes,Follow Up on Previous Items,Items of Interest from Sites & New Items ML20154G9921988-04-26026 April 1988 Summary of 880331 Meeting W/Sandia Natl Lab,Numarc,Epri, Saic,Util,Westinghouse & ERC Intl Re Differences Between Industry Sponsored Analysis & Earlier Analysis of Same Plant Sponsored by NRC ML20149K7541988-02-10010 February 1988 Summary of 880204 Meeting in Rockville,Md to Discuss Licensee Accident Reanalysis to Support Increased Allowable Core Peaking Factors at Facilities.Slides Used During Presentation & List of Meeting Attendees Encl ML20237A9931987-12-0303 December 1987 Summary of 871104 Meeting W/Westinghouse & Utils in Bethesda,Md Re Susceptability of Facility Steam Generators to High Cycle Fatigue.Attendance List & Nonproprietary Westinghouse Handouts Encl ML20237L1111987-08-28028 August 1987 Summary of Operating Reactors Events Meeting 87-28 on 870825 Re Events Which Occurred Since 870818 Meeting.List of Attendees & Significant Elements Encl ML20215C8721987-06-0808 June 1987 Summary of Operating Reactors Events Meeting 87-10 on 870406 Re Events Which Occurred Since 870330 Meeting.List of Attendees,Events Discussed & Significant Elements of Events & Summary of Reactor Scrams & Significant Events Encl ML20214W1621987-06-0505 June 1987 Summary of 870530 Meeting W/Util in Bethesda,Md Re Licensee Assessment of Flaw Indication Observed in Reactor Vessel nozzle-to-shell Weld for Safety Injection Sys.Attendees List Encl ML20215D0631986-12-11011 December 1986 Summary of Operating Reactor Events Meeting 86-42 on 861201. List of Attendees & Viewgraphs Re Significant Elements of Events Discussed Encl ML20215C9961986-12-11011 December 1986 Summary of Operating Reactor Events Meeting 86-41 on 861124.List of Attendees,Events Discussed & Significant Event Elements & Summary of Events That Will Be Input to NRC Performance Indicator Program Encl NUREG-0518, Summary of ACRS 316th Meeting on 860807-09 in Washington,Dc Re Proposed Standardization Policy Statement & Review of Issues Related to Reorganization of TVA Mgt Structure & Shutdown of TVA Nuclear Power Plants1986-08-18018 August 1986 Summary of ACRS 316th Meeting on 860807-09 in Washington,Dc Re Proposed Standardization Policy Statement & Review of Issues Related to Reorganization of TVA Mgt Structure & Shutdown of TVA Nuclear Power Plants ML20211G7781986-06-13013 June 1986 Summary of Operating Reactor Events Meeting 86-19 on 860609. List of Attendees,Events Discussed & Status of Previous Assignments Encl ML20197F7721986-05-0808 May 1986 Summary of Operating Reactors Events Meeting 86-15 on 860505.List of Attendees,Events Discussed & Status of Previous Assignments Encl ML20138N9841985-12-19019 December 1985 Summary of 851122 Meeting W/Licensees & Westinghouse to Present Status of Program for Developing New Upper Plenum Injection Evaluation Model.Nonproprietary Viewgraphs,List of Attendees & Agenda Encl ML20137X5091985-11-29029 November 1985 Summary of Operator Reactor Events Meeting 85-24 on 851125 Re Briefing of Ofc Directors & Div Directors & Representatives on Events Which Occurred Since Last Meeting on 851118.List of Attendees Encl ML20138P0081985-10-21021 October 1985 Summary of Operating Reactors Events Meeting 85-19 on 851007 W/Ofc Directors,Div Directors & Representatives on Events Which Occurred Since Last Meeting on 851007 ML20133F9941985-10-0707 October 1985 Summary of Operating Reactors Events Meeting 85-16 on 850916 Re Briefing of Director,Div Directors & Representatives on Events Occurring Since 850909 Meeting.List of Attendees & Viewgraphs Encl ML20141E5521985-09-26026 September 1985 Summary of ACRS Subcommittee on Reactor Operations 850910 Meeting in Washington,Dc to Discuss Recent Operating Occurrences.Fr Notice,Meeting Schedule & List of Meeting Slides Encl ML20209G6871985-09-0909 September 1985 Summary of Operating Reactor Events Meeting 85-14 on 850826 to Brief Director & Div Directors on Events Which Occurred Since 850813 Meeting.Computer Printout of 1985 Operating Reactor Events Meeting Topics to Date Encl ML20133E0661985-07-25025 July 1985 Summary of 850628 Meeting W/Utils & Westinghouse Re Status of Development of New Upper Plenum Injection Evaluation Model.List of Attendees & Agenda Encl ML20127N9021985-06-24024 June 1985 Summary of Operating Reactors Events Meeting 85-10 on 850612.Only 3 of 17 Items Scheduled for Completion by 850531 Remain Incomplete.List of Attendees,Summary of Events Discussed & Status of Previous Assignments Encl ML20126L2331981-05-0101 May 1981 Summary of 810429 Meeting W/Pwr Owners Group Re Thermal Shock to Reactor Pressure Vessels.All Parties Agree That Thermal Shock W/Subsequent Repressurization Is Safety Concern Needing Prompt Evaluation ML20196H3981978-07-0505 July 1978 Summary of 780622 Meeting W/Westinghouse Owners Group to Discuss Results of Phase a of three-phase Plan & Current Schedule for Resolution of Asymmetric LOCA Loads Isssue.List of Attendees Encl ML20245C3211977-07-11011 July 1977 Summary of 770525 Meeting W/Westinghouse & Util Group Members Re Efforts to Prevent Reactor Vessel Overpressurization.W/O Encls ML20196H3251976-06-29029 June 1976 Summary of 760525 Meeting W/Util & Westinghouse Re Proposed Approach to Solution of Reactor Vessel Lateral Loading Question.List of Attendees,Agenda & Viewgraphs Encl 1999-09-08
[Table view] |
Text
-
o, 4
, y October 25,.1999
' LICENSEE: Wisconsin El ctric Power Company FACILITY: Point Beach Nuclear Plant, Units 1 and 2 l
l
SUBJECT:
MEETING BETWEEN THE WISCONSIN ELECTRIC POWER
/ COMPANY AND THE NRC STAFF REGARDING CONVERSION TO IMPROVED STANDARD TECHNICAL SPECIFICATIONS The NRC staff met with representatives from Wisconsin Electric Power Company (WE), the ;
licensee for Point Beach Nuclear Power Plant (PBNP), Units 1 and 2, at NRC Headquarters on September 1,1999, to discuss WE's planned conversion to improved standard Technical Specifications (ITS). Enclosure 1 lists the meeting participants. Enclosure 2 is an agenda containing items discussed during the meeting.
. WE plans to submit a license amendment application to convert the current TSs to ITS in the fall of 1999 and has requested approval by the NRC in time to implement the ITS during the
. summer of 2001. WE discussed other items at the meeting, including submittal content,
. number of submittal copies needed by the NRO staff, examples of where WE will deviate from the standard TSs, and differences in PBNP design that could impact the NRC staff's review of l the ITS submittal. The licensee and NRC staff agreed that future meetings between NRC staff
~
l reviewers and the licensee to discuss specific design differences in the auxiliary feedwater system, service water system, and electrical distribution system would benefit the review of WE's conversion to ITS. These future meetings will be scheduled after WE submits its license amendment application to convert to ITS. ,
Original signed by Tae Kim for:
l Beth A. Wetzel, Senior Project Manager, Section 1 4 Project Directorate ill L Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-266 and 50-301 .,
Enclosures:
- 1. List of Meeting Attendees .
2.- Licensee Handouts cc w/encis: See next page Ihh hh hk$ @f QlSTRIBUTION - ,
i Hard Copy Docket File PUBLIC .PD3-1 r/f B. Wetzel . l OGC. ACRS I g
4 E-Mail J. Zwolinski - S. Black M. Satorius R. Dennig
' C. Harbuck R. Lanksbury, Rill
- DOCUMENT NAME: g:\pdiil-1\ptbeach\mts90199 Tf0' lC' OFFICE- PM:PD31 'Q LA:PD31 lC SC:PD31 !
NAME BWetzel T/K RBoulinR% - CCraiglW DATE /0/ro /99 lb //i /99 M /d6/99
, OFFICIAL RE, CORD COPY i 9910270236 991025 m.
ADOCK 05000266
~
PDR '
P FDP.
L j
October 25, 1999
.e :
' LICENSEE: ' Wisconsin El:ctric Powsr Company 4' FACILITY: Point Beach Nuclear Piar,t, Units 1 and 2
SUBJECT:
MEETING BETWEEN THE WISCONSIN ELECTRIC POWER COMPANY AND THE NRC STAFF REGARDING CONVERSION TO IMPROVED STANDARD TECHNICAL SPECIFICATIONS The NRC staff met with representatives from Wisconsin Electric Power Company (WE), the licensee for Point Beach Nuclear Power Plant (PBNP), Units 1 and 2, at NRC Headquarters on September 1,1999, to discuss WE's planned conversion to improved standard Technical l
Specifications'(ITS). Enclosure i lists the meeting pa6ticipants. Enclosure 2 is an agenda containing items discussed during the meeting. t l
WE plans to submit a license amendment application to convert the current TSs to ITS in the 4 fall of 1999 and has requested approval by the NRC in time to implement the ITS during the summer of 2001. WE discussed other items at the meeting, including submittal content, number of submittal copies needed by the NRC staff, examples of where WE will deviate from the standard TSs, and differences in PBNP design that could impact the NRC staff's review of the ITS submittal. The licensee and NRC staff agreed that future meetings between NRC staff reviewers and the licerr.ae to discuss specific desip 1 differences in the auxiliary feedwater system, service water system, and electrical distribution system would benefit the review of ,
WE's conversion to ITS. These future meetings will bo scheduled after WE subm'ts its license l
- amendment application to convert to ITS. J Original signed by Tae Kim for:
Beth A. Wetzel, Senior Project Manager, Section 1 Project Directorate lil I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-266 and 50-301
Enclosures:
- 1. List of Meeting Attendees ;
- 2. Licensee Handouts ;
cc w/encis: See next page DISTRIBUTION Hard Cooy Docket File PUBLIC PD3-1 r/f 4. Wetzel
-OGC ACRS E-Mail J. Zwolinski S. Black M. Satorius R. Dennig ,
C. Harbuck L R. Lanksbury, Rill DOCUMENT NAME: g:\pdili-1\ptbeach\mts90199 OFFICE PM;PD31 lC LA:PD31 lC SC:PD31 lC NAME BWetzel -T/R RBoulinR% CCraigI b; ;( '
gTE /0/to /99 16 // 9 /99 l/ /J(-/99
- OFFICIAL RECORD COPY
g55 W 0 0
& 4 UNITED STATES
- 4 [
o #
[ NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20666 0001 October 25, 1999 LICENSEE: Wisconsin Electric Power Company FACILITY: Point Beach Nuclear Plant, Units 1 and 2
SUBJECT:
MEETING BETWEEP THE WISCONSIN ELECTRIC POWER COMPANY AND THE NRC STAFF REGARDING CONVERSION TO IMPROVED STANDARD TECHNICAL SPECIFICATIONS The NRC staff met with representatives from Wisconsin Electric Power Company (WE), the licensee for Point Beach Nuclear Power Plant (PBNP), Units 1 and 2, at NRC Headquarters on Septernber 1,1999, to discuss WE's planned conversion to improved standard Technical Specifications (ITS). Enclosure 1 lists the meeting participants. Enclosure 2 is an agenda containing items discussed during the meeting.
WE plans to submit a license amendment application to convert the current TSs to ITS in the fall of 1999 and has requested approval by the NRC in time to implement the ITS during the summer of 2001. WE discussed other items at the meeting, including submittal content, number of submittal copies needed by the NRC ' staff, exampies of where WE will deviate from the standard TSs, and differences in PBNP design that could Impact the NRC staff's review of the ITS submittal. The licensee and NRC staff agreed that future meetings between NRC staff reviewers and the licensee to discuss specific design differences in the auxiliary feedwater system, service water system, and electrical distribution system would benefit the review of WE's conversion to ITS. These future meetings will be scheduled after WE submits its license i amendment application to convert to ITS.
1 Beth A. Wetzel, Senior Project Manager, Section 1 Project Directorate lli Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-266 and 50-301 1
Enclosures:
- 1. List of Meeting Attendees i
- 2. Licensee Handouts I cc w/encis: See next page
)
j l
W Wisconsin Electric Power Company ; Point Beach Nuclear Plant Units 1 and 2 cc:
, Mr. John H. O'Neill, Jr. Ms. Sarah Jenkins Shaw, Pittman, Potts & Trowbridge Electric Division j
- 2300 N Street, NW Public Service Commission of Wisconsin Washington, DC 20037-1128 P.O. Box 7854 -
Madison, Wisconsin 53707-7854 Mr. Richard R. Grigg President and Chief Operating Officer . M.. Michael B. Sellman Wisconsin Electric Power Company- Chief Nu% ar Officer 231 West Michigan Street - Wisconsin Clectric Power Company Milwaukee, Wisconsin 53201 - 231 West Michigan Street Milwaukee,WI 53201 Mr. Mark E. Reddemann Site Vice President Point Beach Nuclear Plant -
Wisconsin Electric Power Company 6610 Nuclear Road Two Rivers, Wisconsin 54241 Mr. Ken Duveneck Town Chairman l
)~ 1 Town of Two Creeks .
13017 State Highway 42 Mishicot, Wisconsin 54228 Chairman Public Service Commission of Wisconsin P.O. Box 7854 Madison, Wisconsin 53707-7854 Regional Administrator, Region ill U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, Illinois 60532-4351
= Resident inspector's Office t U.S. Nuclear Regulatory Commission -
I 6612 Nuclear Road -
Two Rivers, Wisconsin 54241 October 1998 s
5
5
)
LIST OF MEETING ATTENDEES CONVERSION TO IMPROVED STANDARD TECHNICAL SPECIFICATIONS POINT BEACH NUCLEAR POWER PLANT (PBNP). UNITS 1 AND 2 SEPTEMBER 1,1999 Name' Oracnization and Title Beth Wetzel Project Manager, NRC C. Craig Harbuck TS L.,_nch Lead Reviewer, NRC Bob Dennig Section Chief, RTSB, NRC G. Roxy Guyun ITS Cocrdinate:, Surry Power Station, VA Power Regina Borsh ITS Coordinator, VA Power l Bill Herrman ITS Implementation Lead, PBNP Jack Gadzala Licensing Manager, PBNP Curt Castell Licensing Engineer, PBNP RTSB = Technical Specifications Branch Enclosure 1
A .
.- ij Point Beach ITS Conversion Project Meeting with NRR NRC Headquarters, White Flint, Maryland
~
l September 1,1999 l
- Proposed Schedule Submittal sections 3.3.1 &.3.3.2 re-write sections 1,2,3 (Oct 99) sections 4,5 (Dec 99) ,
lengthened submittal period to improve document quality Summer 2001 implernentation window refueling outage coordination
- PTLR/COLR Integration PTLR submittal Jan 2000 COLR submittal Feb 2000 Discuss Subruittal Content and Number of Copies Needed Examples of CTS /CLB justification for deviation e.g., power to SI accumulatorisolation valves ITS Sections that deviate substantially from NUREG-1431 Auxiliary feedwater; service water; electrical -
System overviews to be provided shortly after submittal e
Formatting Irregularities due to Software Conversion (font; spaces)
Wrap-up/ questions; reviewer requests Enclosure 2