Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20234C645 + (11:54:05, 3 December 2024)
- ML20234C643 + (11:54:06, 3 December 2024)
- ML20234C642 + (11:54:06, 3 December 2024)
- ML20234C639 + (11:54:07, 3 December 2024)
- ML20234C641 + (11:54:07, 3 December 2024)
- RBG-26637, Monthly Operating Rept for Aug 1987 + (11:54:08, 3 December 2024)
- ML20234C636 + (11:54:09, 3 December 2024)
- ML20234C634 + (11:54:09, 3 December 2024)
- ML20234C633 + (11:54:10, 3 December 2024)
- ML20234C632 + (11:54:11, 3 December 2024)
- ML20234C631 + (11:54:12, 3 December 2024)
- HBL-87-086, Annual Rept of Design Changes,1986 + (11:54:13, 3 December 2024)
- ML20234C628 + (11:54:13, 3 December 2024)
- 05000328/LER-1987-008-01, :on 871127,w/unit in Mode 5,Train a Containment Ventilation Isolation Occurred.Caused by Spurious High Radiation Spike in Radiation Monitor.Special Task Force Group Established to Determine Root Cause + (11:54:15, 3 December 2024)
- ML20234C623 + (11:54:16, 3 December 2024)
- ML20234C624 + (11:54:16, 3 December 2024)
- ML20234C619 + (11:54:17, 3 December 2024)
- 05000413/LER-1987-005, :on 870130,determined That Containment Air Return Fans Could Be Inoperable Due to Collected Spray Flooding.Caused by Design Mfg,Const/Installation Deficiency. Curbs Installed + (11:54:19, 3 December 2024)
- ML20234C609 + (11:54:26, 3 December 2024)
- ML20234C607 + (11:54:27, 3 December 2024)
- ML20234C603 + (11:54:27, 3 December 2024)
- 05000133/LER-1987-001-02, :on 870604,discovered That Surveillance Test Interval of Tech Spec for Stack Gas Monitoring Sys Exceeded. Caused by Personnel Error.Scheduling & Tracking Sys to Reduce Possibility of Recurrence Established + (11:54:29, 3 December 2024)
- ML20234C601 + (11:54:30, 3 December 2024)
- ML20234C598 + (11:54:31, 3 December 2024)
- ML20234C597 + (11:54:31, 3 December 2024)
- RBG-26592, Forwards Response to NRC Bulletin 87-001, Thinning of Pipe Walls in Nuclear Power Plants + (11:54:32, 3 December 2024)
- ML20234C588 + (11:54:33, 3 December 2024)
- ML20234C592 + (11:54:33, 3 December 2024)
- ML20234C583 + (11:54:34, 3 December 2024)
- ML20234C582 + (11:54:35, 3 December 2024)
- ML20234C576 + (11:54:36, 3 December 2024)
- ML20234C570 + (11:54:37, 3 December 2024)
- ML20234C571 + (11:54:37, 3 December 2024)
- ML20234C564 + (11:54:39, 3 December 2024)
- ML20234C566 + (11:54:39, 3 December 2024)
- ML20234C562 + (11:54:40, 3 December 2024)
- ML20234C563 + (11:54:40, 3 December 2024)
- ML20234C561 + (11:54:41, 3 December 2024)
- ML20234C558 + (11:54:42, 3 December 2024)
- PNO-IV-87-045, on 870913,two of Six Seismic Monitors Recorded Deflation of About 0.01 G & Alarmed.Licensee Contacted Regional & Natl Seismic Monitoring Stations.Insp Shows No Evidence of Damage + (11:54:42, 3 December 2024)
- BECO-87-146, Requests one-time Exemption from Requirements of 10CFR50, App E,Section Iv.F. Authorizing Next Biennial Full Full Participation Emergency Preparedness Exercise for Facility to Be Conducted in Second Quarter 1988 + (11:54:43, 3 December 2024)
- ML20234C549 + (11:54:44, 3 December 2024)
- ML20234C544 + (11:54:45, 3 December 2024)
- ML20234C540 + (11:54:46, 3 December 2024)
- ML20234C539 + (11:54:47, 3 December 2024)
- ML20234C538 + (11:54:47, 3 December 2024)
- ML20234C536 + (11:54:48, 3 December 2024)
- ML20234C535 + (11:54:49, 3 December 2024)
- IR 05000324/1987027 + (11:54:50, 3 December 2024)
- ML20234C529 + (11:54:50, 3 December 2024)
- ML20234C527 + (11:54:51, 3 December 2024)
- ML20234C524 + (11:54:52, 3 December 2024)