Responds to 860909 & 1023 Questions Re Operation of Plant Svc Water Sys in Sharing Mode.Licensee Advised That 72 H Action Statement of Tech Spec 3.7.4 Reinstated
ML20234C628
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 11/07/1986
From: Youngblood B
Office of Nuclear Reactor Regulation
To: Gibson A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20234C617 List:
References
NUDOCS 8707060576
Download: ML20234C628 (2)


Text

e-d'gaege ATTACHMENT 5 l o,, UNITED STATES 5

[- o NUCLEAR REGULATORY COMMISSION wAsHmG TON. D. C. 2056G

~

. . _ gDV 7. st0!$

MEMORANDUM FOR: Albert F. Gibson, Director Divisf66 of Reactor Safety, RII

-)

]

FROM: B.JNungblood, Director )

PWR Project Directorate #4 j Division of PWR Licensing-A i i

SUBJECT:

OPERATION OF McGUIRE SERVICE WATER SYSTEM IN THE UNIT  !

SHARING MODE I By memoranda of September 9 and October 23, 1086, you asked if operation of the McGuire Nuclear Service Water (RN) System in the unit cross-over mode, as octurred in October 1985, represented an unreviewed safety question.

It is somewhat indetenninate as to whether this cross-conn (ct mode was reviewed i by the NRC prior to licensing. (The hRC technical reviewer of the Auxiliary i Systems Branch that reviewed the McGuire RN System prior to licensing is no longer l with the NRC, our SER does not mention unit cross-connect, and we find no licensinc,  !

correspondence regarding unit cross-connect)~ ~ FSAR Section 9.2.2 and its flow  !

diagrams, prior to licensing, did describe a RN system with unit cross over )

lines in the pump discharge header with locked-closed valves and stated that the RN pump discharge header cross over valves were provided so as to "give the system added flexibility to operate should more than one malfunction occur."

)

Nevertheless, and more importantly, Technical Specifications 3/4.7.4 remains un-changed since licensing and requires that two independent nuclear service water loops shall be operable. This specification applies separately to each McGuire unit.

l l'pon learning that the facility had been placed in the unit cross-connect mede, the NRC staff did review the licensee's 50.59 analysis on October 8,1985.

The review indicated that under the conditions stated in that report, such operation posed no significant safety problems. However, the review also indicated that this approach does not satisfy the ASME Ccde,Section XI, IWP 3230. (The  !

i licensee was using the 50.59 analysis to justify the system operable, whereas I IWP 3230 is based upon individual comoonent function). i I

Accordingly, on October 10, 1985, Fr. T. Novak advised Mr. R. Walker that the l

licensee's 50.59 approach was inconsistent with the Code, and hence with TS 4.0.5. '

Thereafter, P,r. kalker advised the licensee that the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> action statement of TS 3.7.4 was reinstated. )

l 8707060576 870311 PDR ADOCK 05000369 G PDR

__._ _ _ _ _ _ _ _ _ - . _ . - - - - - - - - - - - - - - - - " - - - - - - - " - " ~ - - - - ~ ~ "

e -

. l.

~

, - o
.

l l

7-  !

i Should you have any questions regarding this reply, contact Darl Hood at (301) 492-8961, ,

i

, / hht B.J./Y ungbloo , Director

  • PWR P oject Directorate #4 Division of PWR Licensing-A i