Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20235Q851 + (09:33:42, 3 December 2024)
- ML20235Q843 + (09:33:43, 3 December 2024)
- ML20235Q840 + (09:33:45, 3 December 2024)
- ML20235Q835 + (09:33:45, 3 December 2024)
- ML20235Q833 + (09:33:46, 3 December 2024)
- B13144, Forwards Rept Detailing Status of Each Open Item Noted in June 1988 Regulatory Effectiveness Review.Rept Withheld (Ref 10CFR2.790) + (09:33:47, 3 December 2024)
- ML20235Q818 + (09:33:48, 3 December 2024)
- 05000412/LER-1987-011, :on 870730,two Surveillance Procedures in Progress Requiring Channel IV Steam Pressure Bistables for Steam Generator 21C to Be in Tripped Condition.Caused by Personnel Error.Test Engineer Reassigned + (09:33:50, 3 December 2024)
- 05000440/LER-1987-062, :on 870828,RHR Head Spray Containment Isolation Valve Energized in Violation of Tech Spec 3.6.4.Caused by Personnel Error.Operator Involved Counseled Re Need for Greater Attention to Detail + (09:33:52, 3 December 2024)
- ML20235Q811 + (09:33:52, 3 December 2024)
- ML20235Q810 + (09:33:53, 3 December 2024)
- ML20235Q809 + (09:33:54, 3 December 2024)
- ML20235Q806 + (09:33:55, 3 December 2024)
- ML20235Q805 + (09:33:55, 3 December 2024)
- ML20235Q795 + (09:33:57, 3 December 2024)
- ML20235Q798 + (09:33:57, 3 December 2024)
- ML20235Q785 + (09:33:59, 3 December 2024)
- 05000482/LER-1987-024, :on 870615,control Room Ventilation Isolation Signal Occurred Due to Loss of Power to Chlorine Monitor Gk AITS-3.Caused by Blown Fuse in Power Supply.Sample Pump Replaced & Monitor Returned to Svc + (09:34:00, 3 December 2024)
- ML20235Q777 + (09:34:01, 3 December 2024)
- ML20235Q770 + (09:34:02, 3 December 2024)
- ML20235Q764 + (09:34:03, 3 December 2024)
- ML20235Q761 + (09:34:04, 3 December 2024)
- ML20235Q756 + (09:34:05, 3 December 2024)
- ML20235Q754 + (09:34:05, 3 December 2024)
- RBG-30034, Monthly Operating Rept for Jan 1989 for River Bend Station Unit 1 + (09:34:06, 3 December 2024)
- ML20235Q749 + (09:34:07, 3 December 2024)
- ML20235Q739 + (09:34:08, 3 December 2024)
- ML20235Q730 + (09:34:10, 3 December 2024)
- ML20235Q726 + (09:34:11, 3 December 2024)
- ML20235Q727 + (09:34:11, 3 December 2024)
- ML20235Q723 + (09:34:12, 3 December 2024)
- ML20235Q722 + (09:34:13, 3 December 2024)
- ML20235Q716 + (09:34:14, 3 December 2024)
- ML20235Q712 + (09:34:15, 3 December 2024)
- ML20235Q705 + (09:34:16, 3 December 2024)
- ML20235Q709 + (09:34:16, 3 December 2024)
- IR 05000010/1987007 + (09:34:18, 3 December 2024)
- PY-CEI-NRR-0727, Forwards LERs 87-061-00 & 87-062-00 + (09:34:18, 3 December 2024)
- ML20235Q700 + (09:34:19, 3 December 2024)
- ML20235Q698 + (09:34:20, 3 December 2024)
- ML20235Q697 + (09:34:20, 3 December 2024)
- ML20235Q692 + (09:34:21, 3 December 2024)
- PNO-I-87-092, on 871001,research Worker Eye,Face & Hands Accidently Contamninated W/Approx 40 Uci P-32.Caused by Bumping Plexiglass Shield While Pipetting P-32.Investigation Begun to Determine If Medical Attention Necessary + (09:34:22, 3 December 2024)
- ML20235Q662 + (09:34:25, 3 December 2024)
- ML20235Q661 + (09:34:28, 3 December 2024)
- 05000348/LER-1987-015, :on 870831,0914 & 22,control Room Fire Dampers Did Not Close W/Air Flow During Testing.Caused by Design Deficiency in That Dampers Will Not Close Fully & Latch W/ Air Flow.Design Changes Will Be Initiated + (09:34:30, 3 December 2024)
- 05000412/LER-1987-018, :on 870818,while Mounting Overvoltage Protector Module in Cabinet,Module Inadvertently Came in Contact W/ Adjacent Terminal Board,Resulting in Reactor Trip.Caused by de-energized Rod Control Cabinet + (09:34:32, 3 December 2024)
- ML20235Q653 + (09:34:32, 3 December 2024)
- RBG-29588, Corrected Response to Violations Noted in Insp Rept 50-458/88-22 on 880829-0915.Corrective Actions:Operations Has Implemented Control Board Walkdown Checklist for Unit Operator to Use as Guide During Shift Turnover + (09:34:33, 3 December 2024)
- 05000498/LER-1987-004, :on 870903,control Room Ventilation Actuation Recirculation Mode Occurred.Caused by Personnel Error.Formal Personnel Training Will Be Provided,Protective Covers Used & Warning Labels Placed on Panel ZCP-023 + (09:34:35, 3 December 2024)
- ML20235Q639 + (09:34:37, 3 December 2024)