Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20235U955 + (08:58:50, 3 December 2024)
- ML20235U953 + (08:58:50, 3 December 2024)
- ML20235U951 + (08:58:51, 3 December 2024)
- ML20235U950 + (08:58:52, 3 December 2024)
- ML20235U944 + (08:58:54, 3 December 2024)
- IR 05000293/1988035 + (08:58:55, 3 December 2024)
- ML20235U942 + (08:58:56, 3 December 2024)
- ML20235U940 + (08:58:57, 3 December 2024)
- TXX-6840, Interim Deficiency Rept CP-87-101 Re Class 1E Electrical Circuits W/Multiple Conductor Per Phase Feeders Which May Have Potential to Overheat.Initially Reported on 870910. Evaluation of Impact on Safety Continuing.Next Rept 871211 + (08:58:57, 3 December 2024)
- ML20235U935 + (08:58:58, 3 December 2024)
- ML20235U932 + (08:58:59, 3 December 2024)
- ML20235U934 + (08:58:59, 3 December 2024)
- ML20235U931 + (08:59:00, 3 December 2024)
- 1CAN028901, Application for Amend to License DPR-51,revising Tech Specs Re Snubber Visual Insp Interval to Allow Delay of Snubber Insp Due Between 890321 & 890619 to Next Refueling Outage Scheduled for Mar 1990.Fee Paid + (08:59:02, 3 December 2024)
- ML20235U924 + (08:59:02, 3 December 2024)
- 05000456/LER-1987-046, :on 870910,RCS Cooldown Rate Increase Led to lo-lo Steam Generator (SG) Level & auto-start of Auxiliary Feedwater Pump 1B.Caused by Procedural Deficiency.Sg Level Will Be Monitored When Cooldown Rate Changes + (08:59:04, 3 December 2024)
- 3F0289-16, Responds to Bulletin 88-011, Pressurizer Surge Line Thermal Stratification. No Addl Surge Insps Planned Unless Results of Analyses Programs Warrant Other or Periodic Assessment + (08:59:05, 3 December 2024)
- ML20235U916 + (08:59:05, 3 December 2024)
- AECM-87-0132, Monthly Operating Rept for June 1987 + (08:59:06, 3 December 2024)
- NLS8700495, Forwards Rev to Physical Security Plan & Safeguards Contingency Plan to Reflect Recently Approved Amend 111 to License DPR-46.Rev Withheld (Ref 10CFR73.21) + (08:59:06, 3 December 2024)
- ML20235U911 + (08:59:07, 3 December 2024)
- PY-CEI-NRR-0722, Responds to NRC Re Violations Noted in Insp Rept 50-440/87-12.Corrective Actions Taken:Design Change Package Implemented,Modifying Power Supplies to All MSIV Pilot Valve Solenoids to Meet FSAR Description & Current GE Design + (08:59:11, 3 December 2024)
- ML20235U909 + (08:59:11, 3 December 2024)
- ML20235U906 + (08:59:12, 3 December 2024)
- ML20235U903 + (08:59:13, 3 December 2024)
- ML20235U904 + (08:59:13, 3 December 2024)
- ML20235U901 + (08:59:14, 3 December 2024)
- TXX-6844, Informs That Field Verification Method (Fvm) for Unit 2 Sys Will Be Issued to Support Completion of Walkdowns,Generation of DCAs & Installation of Cable Grips by 881231,in Response to Notice of Violation.Draft FSAR Encl + (08:59:14, 3 December 2024)
- SNRC-1551, Forwards Semiannual Radioactive Effluent Release Rept,Third & Fourth Quarters of 1988 & Rev 5 to Solid Waste Process Control Room + (08:59:15, 3 December 2024)
- ML20235U898 + (08:59:16, 3 December 2024)
- ML20235U897 + (08:59:17, 3 December 2024)
- ML20235U895 + (08:59:17, 3 December 2024)
- 2CAN028901, Application for Amend to License NPF-6,revising Tech Specs to Delay Snubber Insp Until Upcoming Outage Scheduled for Sept 1989.Fee Paid + (08:59:18, 3 December 2024)
- ML20235U891 + (08:59:19, 3 December 2024)
- ML20235U889 + (08:59:20, 3 December 2024)
- ML20235U888 + (08:59:20, 3 December 2024)
- ML20235U886 + (08:59:21, 3 December 2024)
- ML20235U885 + (08:59:22, 3 December 2024)
- PY-CEI-NRR-0978, Semiannual Radioactive Effluent Release Rept for Jul-Dec 1988 + (08:59:23, 3 December 2024)
- ML20235U881 + (08:59:24, 3 December 2024)
- ML20235U878 + (08:59:24, 3 December 2024)
- PY-CEI-NRR-0974, Forwards Ninth Quarterly Rept - Seismic Monitoring Network, Oct-Dec 1988. Info Re Continued Operation of Network Through at Least 1989 Also Encl + (08:59:26, 3 December 2024)
- ML20235U875 + (08:59:26, 3 December 2024)
- ML20235U871 + (08:59:27, 3 December 2024)
- ML20235U868 + (08:59:28, 3 December 2024)
- IR 05000416/1987022 + (08:59:31, 3 December 2024)
- TXX-6836, Interim Deficiency Rept CP-87-98 Re Review of Cable & Raceway Data Sys Which Indicates That Wrong Cable Diameter May Have Been Used in Calculations.Evaluation of Impact of Application of Nominal Cable Continues.Next Rept by 871120 + (08:59:32, 3 December 2024)
- ML20235U861 + (08:59:32, 3 December 2024)
- ML20235U859 + (08:59:33, 3 December 2024)
- BVY-89-023, Effluent & Waste Disposal Semiannual Rept for Third & Fourth Quarters,1988 + (08:59:34, 3 December 2024)
- ML20235U856 + (08:59:35, 3 December 2024)
- IR 05000498/1989003 + (08:59:36, 3 December 2024)