Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20235V074 + (08:57:41, 3 December 2024)
- ML20235V065 + (08:57:43, 3 December 2024)
- ML20235V064 + (08:57:44, 3 December 2024)
- ML20235V061 + (08:57:44, 3 December 2024)
- IR 05000424/1987037 + (08:57:45, 3 December 2024)
- ML20235V058 + (08:57:46, 3 December 2024)
- 05000374/LER-1989-004-01, :on 890201,determined That Static O-Ring RHR Min Flow Switch Exceeded Rejection Limits During Instrument Surveillance.Reject & Flow Switches Replaced + (08:57:47, 3 December 2024)
- ML20235V053 + (08:57:48, 3 December 2024)
- ML20235V052 + (08:57:49, 3 December 2024)
- ML20235V049 + (08:57:51, 3 December 2024)
- ML20235V048 + (08:57:51, 3 December 2024)
- ML20235V046 + (08:57:52, 3 December 2024)
- ML20235V042 + (08:57:53, 3 December 2024)
- ML20235V041 + (08:57:53, 3 December 2024)
- ML20235V039 + (08:57:54, 3 December 2024)
- ML20235V036 + (08:57:55, 3 December 2024)
- RBG-26757, Updates 870609 & 0814 Ltrs Responding to WR Butler Re Activities in Support of Facility First Refueling Outage.Current Expected Schedules for Identified Activities Requiring NRC Action to Support Refueling Outage Encl + (08:57:55, 3 December 2024)
- ML20235V034 + (08:57:56, 3 December 2024)
- ML20235V031 + (08:57:56, 3 December 2024)
- ML20235V025 + (08:57:58, 3 December 2024)
- ML20235V020 + (08:58:01, 3 December 2024)
- RBG-26761, Application for Amend to License NPF-47,reflecting Organizational Changes within Nuclear Group + (08:58:02, 3 December 2024)
- ML20235V013 + (08:58:03, 3 December 2024)
- ML20235V011 + (08:58:04, 3 December 2024)
- 05000346/LER-1987-011, :on 870906,reactor Tripped from Power Level of 104.5 % High Flux Reactor Sys Signal.On 870907,two Attempts to Place Decay Heat Loop 2 in Svc Resulted in Pressurizer Level Drops of 10 & 6 Inches,Respectively + (08:58:06, 3 December 2024)
- ML20235V009 + (08:58:07, 3 December 2024)
- IR 05000324/1987032 + (08:58:11, 3 December 2024)
- ML20235V005 + (08:58:12, 3 December 2024)
- ML20235V004 + (08:58:13, 3 December 2024)
- ML20235V003 + (08:58:14, 3 December 2024)
- 05000370/LER-1987-017-02, :on 870904,flow Balance Test Failed Due to Inadequate Nuclear Svc Water Flows & on 870906 Reactor Trip Occurred & Solid State Protection Sys Train 2B Surveillance Testing Required + (08:58:16, 3 December 2024)
- ML20235U998 + (08:58:16, 3 December 2024)
- IR 05000445/1989002 + (08:58:28, 3 December 2024)
- W3P87-1757, Submits Amended Objectives A.1.m & A.1.p to 1987 Emergency Preparedness Exercise,Discussed in + (08:58:29, 3 December 2024)
- 05000206/LER-1989-003, :on 890127,determined That During Design Basis LOCA,TCV-601A & B Could Fail Open Due to Either Assumed Loss of Instrument Air or Loss of Control Power Supply.Failure Not Recognized During 1976 Sys Analysis + (08:58:31, 3 December 2024)
- ML20235U994 + (08:58:31, 3 December 2024)
- 3F1087-09, Revises Response to NRC Ltr Re Violations Noted in Insp Rept 50-302/87-26.Corrective Actions:Mispositioned Valve SWV-14 Correctly positioned,out-of-tolerance Instrument Readings Evaluated & Repaired & Operator Counseled + (08:58:32, 3 December 2024)
- TXX-6832, Revised Response to NRC Re Violations Noted in Insp Repts 50-445/85-16 & 50-446/85-13,per . Corrective Actions:Nonconformance Repts NCR XI-708,issued on 851114,transferred to NCR M-25650 on 860311 + (08:58:33, 3 December 2024)
- ML20235U989 + (08:58:33, 3 December 2024)
- ML20235U986 + (08:58:36, 3 December 2024)
- ML20235U985 + (08:58:37, 3 December 2024)
- ML20235U979 + (08:58:39, 3 December 2024)
- 3F0389-01, Ro:On 890118,reactor Coolant Pump 1A Failed.Cause Not Discussed.Sequence of Events Encl + (08:58:41, 3 December 2024)
- ML20235U977 + (08:58:41, 3 December 2024)
- IR 05000416/1987025 + (08:58:42, 3 December 2024)
- ML20235U970 + (08:58:43, 3 December 2024)
- ML20235U968 + (08:58:44, 3 December 2024)
- ML20235U967 + (08:58:44, 3 December 2024)
- TXX-6855, Supplemental Deficiency Rept CP-86-62 Re Polar Crane Support Structure.Initially Reported on 861003.Completion Date for Installation of Polar Crane Rail Hold Down Clips Revised. Clips Now Scheduled to Be Installed by 880119 + (08:58:45, 3 December 2024)
- ML20235U964 + (08:58:46, 3 December 2024)
- ML20235U961 + (08:58:47, 3 December 2024)